pragmaticBIM Reference

Catalog

Goals, frame conditions, uses, use cases, elements, room types, scenarios and documents in one place. Every selection has its own address you can share.

Setup

1177 of 1177 entries

PG-01 Goal Costs & quantities The aim is not a particular figure but a cost forecast you can rely on. It starts with traceable quantities. PG-05 Goal Schedule & coordination The aim is not a particular date but a schedule that holds. Schedule certainty comes from coordinating in good time. PG-07 Goal Decision certainty The aim is to make strategic and design decisions early, comparably, and traceably. Structured use and massing foundations, option comparisons, visualizations, and documented approvals show the consequences of a decision while the project can still be changed. PG-09 Goal Permit certainty The aim is that the building permit application and official evidence pass without surprises. Requirements for parcels, traffic, parking, accessibility, fire protection, and existing trees are made visible in the model early and checked continuously, as is the evidence for funding. PG-10 Goal Design certainty The aim is a design that meets the client's needs, is internally consistent, and is ready for construction. Design reviews, evidence of fire, acoustic, and thermal protection, fall protection, and checked details make quality repeatably verifiable across all phases. PG-03 Goal Verifiable sustainability The aim is to check energy, material, and life-cycle targets directly against the current design status. Building simulation and life-cycle assessment need the same foundations as cost planning and design. PG-06 Boundary condition Working with existing buildings This framework condition determines which existing-condition information is procured: spatial reference and terrain only; those plus the building mass and structural shell; or structural shell, fit-out, and MEP. PG-02 Boundary condition Use & fit-out standard This framework condition determines which uses the building accommodates and which fit-out standard applies to which spaces. It is the basis for designing spaces to suit their use and for checking the agreed requirements traceably. PG-40 Boundary condition Flexibility / service life This framework condition sets the design service life and how far structure, fit-out, and building services are separated. It drives storey heights, the structural grid, and installation zones. PG-39 Boundary condition Accessibility This framework condition sets how far the building is accessible beyond the legal minimum under SIA 500: adaptable or wheelchair-accessible throughout. It drives doors, spaces, and circulation. PG-37 Boundary condition Indoor climate This framework condition sets whether spaces are only heated, also cooled, or controlled for temperature and humidity. It drives the room types with their target values, the building services, and with them plant areas, shafts, and storey heights. PG-36 Boundary condition Certification This framework condition sets whether the building receives a label such as Minergie-ECO, SNBS Building Construction, or DGNB/SGNI. The label sets minimum levels for the energy standard, the greenhouse gas target, and sound insulation. PG-34 Boundary condition Energy standard This framework condition sets whether the building meets the legal minimum or reaches a standard such as Minergie, Minergie-P, or Minergie-A. The standard drives exterior walls, roofs, windows, and the airtightness of the envelope. PG-35 Boundary condition Greenhouse gas target This framework condition sets the limit for grey energy and greenhouse gas emissions from construction, separate from operational energy. The target drives material choice for every component type. PG-38 Boundary condition Sound insulation This framework condition sets whether the minimum requirements under SIA 181 apply, or increased or special requirements. It drives partitions, slabs, and doors between dwellings or units. PG-33 Boundary condition Earthquake This framework condition sets the structure class under SIA 261 and, in a renovation, how far the existing structure is upgraded under SIA 269/8. It matters mainly when the client raises it or decides the degree of upgrading. PG-11 Boundary condition Construction method & prefabrication This framework condition determines whether the construction method remains open, is designed conventionally, or targets a high degree of prefabrication in timber, steel, or concrete. This choice determines when contractors must be involved, interfaces resolved, and shop, production, and assembly information provided. PG-12 Boundary condition Security / critical infrastructure This framework condition determines how strictly information and building security are handled for critical infrastructure: which CDEs are allowed and whether security-critical areas and building security measures must be managed and checked on a model basis. PG-08 Boundary condition Procurement strategy This framework condition determines the procurement route: engaging designers directly, a competition, design-build, or IPD. Each route places different demands on foundations, models, and bids. PG-41 Boundary condition Construction during operation This framework condition sets whether the building stays in use during construction. It drives phasing, temporary measures, decant space, and site logistics with separate routes for operation and construction. PG-04 Boundary condition Facility management This framework condition determines who operates the building and with which systems: space and equipment lists, managed objects in the 3D model, or a COBie import. That decision determines which information must be handed over at the end of the project. PG-13 Boundary condition Dwelling mix The room counts on offer decide which household sizes the building can house. The number per dwelling type follows in the room programme. PG-14 Boundary condition Financing The form of financing decides whether dwellings are let, sold on their own, or held together with the building. Access, ancillary rooms, and the interface to sale or letting depend on it. PG-16 Boundary condition Workplace model The workplace model and the number of workstations determine the office area, the desk-sharing ratio, and the need for retreat and meeting rooms. PG-17 Boundary condition School levels The school level and the number of learners determine classrooms, specialist rooms, break areas, and escape routes. PG-21 Boundary condition Product range The product range and the sales area determine refrigeration, deliveries, storage, and hygiene requirements. PG-22 Boundary condition Service model The service model and the number of seats and meals determine kitchen, serving, storage, and dining room. PG-19 Boundary condition Room mix The room mix decides which guests the house can take in. The number of rooms and beds determines floor area, bathrooms, and housekeeping effort. PG-20 Boundary condition Hall sizes Hall sizes and the number of audience places determine foyer, escape routes, toilets, and cloakroom. They also decide whether parallel events and splitting the hall are possible. PG-23 Boundary condition Seating The seating decides hall shape, chair storage, escape route widths, and how quickly the hall is reset. PG-24 Boundary condition Level of care The level of care and the number of beds, treatment places, and operating theatres determine wards, diagnostics, building services, and logistics. PG-25 Boundary condition Process The process and the output determine hall height, loads, material flow, and the number of workstations. PG-26 Boundary condition Storage type The storage type and the number of pallet places determine hall height, racking, docks, and conveyor systems. PG-27 Boundary condition Hall type The hall type and the number of courts, water areas, and spectator places determine spans, divisibility, changing rooms, and escape routes. PG-29 Boundary condition Laboratory type Wet and dry labs differ in water and drainage connections, ventilation, and surfaces. PG-28 Boundary condition Safety level The biosafety level (BSL) and the number of lab workstations and fume hoods determine access, ventilation, pressure cascades, and wastewater. PG-42 Boundary condition Fume hood density Fume hood density determines extract airflow, shafts, and how deep the lab workstations are. PG-30 Boundary condition Availability class The availability class according to EN 50600 and the IT load determine redundancy of power and cooling, plant areas, and maintenance routes. PG-31 Boundary condition Mode of transport The mode of transport and peak-hour passengers determine platform lengths, waiting areas, passenger flows, access, and escape routes. PG-32 Boundary condition Vehicle mix The vehicle mix and the number of parking spaces determine ramps, aisles, charging infrastructure, and fire protection. PG-15 Boundary condition Refit frequency How often spaces, equipment, and installations are refitted decides how current the as-built data must be in operation. The more often the building is refitted, the more facility management use cases are preselected. PG-18 Boundary condition Fit-out state at handover The fit-out state at handover sets where the base build ends and the tenant fit-out begins. Cost interfaces and building services per tenant unit depend on it. USE-TE Use Building services Rooms for building services, energy and utility connections. USE-WH Use Housing Permanent residence of households. Reference quantity: number of dwellings. USE-WR Use Work Office and administrative work by staff. Reference quantity: number of workstations. USE-BI Use Education Teaching and learning of pupils and students, for example in schools and universities. Reference quantity: number of pupils or students. USE-VK Use Retail Sale of goods to customers. Reference quantity: sales area (m²). USE-GA Use Food service Preparing and serving food and drink to guests. Reference quantity: number of seats, meals served. USE-BH Use Accommodation Temporary overnight stay of guests, for example in hotels. Reference quantity: number of rooms. USE-VS Use Assembly and culture Gathering of audiences for events, culture and worship. Reference quantity: number of audience places. USE-HE Use Healthcare Examination, treatment and care of patients. Reference quantity: number of beds. USE-PR Use Production Manufacturing and processing of goods. Reference quantity: output per year. USE-LO Use Warehousing and logistics Storage, handling and distribution of goods. Reference quantity: number of pallet places. USE-SP Use Sport Individual and team sports, for example in halls, pools and facilities. Reference quantity: number of courts or hall units. USE-LA Use Laboratory and research Experimental research and analysis. Reference quantity: number of lab workstations. USE-RZ Use Data centre Operation of IT infrastructure. Reference quantity: IT load (MW). USE-VE Use Passenger transport Handling of travellers and their waiting time, for example in station halls, terminals and waiting areas. Reference quantity: passengers per peak hour. USE-PK Use Parking Parking of vehicles, for example in multi-storey car parks, garages and parking spaces. Reference quantity: number of parking spaces. USE-ER Use Circulation Gross volume of horizontal and vertical circulation. USE-KL Use Basement Gross volume of the basement with compartments and circulation. BES-OWNER-CDE Use case Procure the CDE through the client Procure the common data environment directly through the client so that control of the data and project access remain intact in the event of insolvency or dispute. Delegate its administration to the project lead. BES-EXISTING-SITE Use case Procure the spatial reference and terrain Procure the spatial reference and terrain as a binding design basis so that every discipline model uses the same coordinates, elevations, and parcel information. BES-EXISTING-POINT-CLOUD Use case Capture the existing building as a point cloud Capture the built condition early as a georeferenced point cloud without rebuilding a complete existing-condition model before the concept direction is clear. BES-DESIGNER-PROCUREMENT Use case Procure a design team with professional and digital expertise Procure planning services against the required capabilities, results, and data deliveries instead of ordering BIM wholesale as an additional working method. BES-EXISTING-STRUCTURE Use case Model the building and structural shell for the chosen concept Once the concept direction is clear, the client orders a georeferenced existing-condition model of the building and structural shell, limited to the areas relevant to the concept, so that conversion, deconstruction, or extension rest on checked existing-condition information and no unnecessary areas are paid for. BES-EXISTING-BUILDING-MEP Use case Procure the existing structural shell, fit-out, and MEP model Procure a coordinated existing-condition model of the structural shell, fit-out, and MEP so that conversion and change of use rely on known components, equipment, and networks. BES-EXISTING-CIRCULARITY Use case Procure existing-condition information for circularity Procure circularity information as a targeted extension of the existing-condition model so that reuse, remediation, and recovery can be assessed early. BES-ROOM-PROGRAM Use case Formulate the room programme for designer procurement and competition Define rooms and their requirements in a structured form as part of the order so that every designer works from the same stable data basis from day one. BES-FUNCTIONAL-BRIEF Use case Clarify operational and functional foundations through test planning Test operations, functions, and areas spatially before procurement without predetermining the later building solution. BES-CONCRETE-TENDER Use case Provide the basis for the concrete tender The client orders from the structural design team a model with verifiable concrete quantities and the tender-relevant information on concrete grade, reinforcement, and surface, so that the specification for concrete and reinforced concrete works is based on the same quantities as the design. BES-FLOORING-TENDER Use case Provide the basis for the flooring tender The client orders from the architecture team a room-by-room flooring schedule with covering type, area, and perimeter from the model, so that quantities in the specification match the design and do not have to be determined again from drawings. BES-FIRESTOP-TENDER Use case Provide the basis for the firestop tender The client orders from the design team a checked firestop schedule with an unambiguous link to each opening, so that firestops are tendered with real quantities and types instead of as a percentage of construction cost. BES-ELEMENT-TENDER Use case Prepare the tender from component types and quantities The client orders from the design team a trade-structured tender whose items trace back to component types and model quantities, so that offers can be compared with the cost calculation and post-calculation needs no new quantity take-off. BES-ABSTRACTBIM-COMP Use case Evaluate competition entries with a room model Evaluate competition entries comparably with minimal modelling effort and focus detailed development on one aspect that is critical to the brief. BES-DESIGN-BUILD Use case Procure design-build services with a binding offer Procure design and construction together on a functionally clarified basis and compare the proposed solution, scope, and offer price consistently. BES-WINDOW-TENDER Use case Provide the basis for the window tender The client orders from the architecture team a verifiable window schedule from the model so that the window tender contains complete quantities and requirements and queries and variations are avoided. BES-DOOR-TENDER Use case Provide the basis for the door tender The client orders from the architecture team a verifiable door schedule from the model so that the door tender contains complete quantities and requirements and queries and variations are avoided. BES-IPD Use case Procure IPD services against a functional base reference and reference costs Procure design and construction under an IPD model against a shared functional base reference and market-indexed reference costs, tie fees to that reference, and settle outperformance against it after project completion. BES-DRYWALL-TENDER Use case Provide the basis for the drywall tender The client orders from the architecture team a verifiable overview of types, quantities, and reinforcements for non-load-bearing interior walls, so that the drywall tender contains complete quantities and fire and acoustic requirements and variations during construction are avoided. BES-SEISMIC-MEP Use case Tender installation suspensions as a separate trade Tender suspension of building services early as a separate trade so that design, coordination, and installation are clearly owned by one specialist contractor. BES-TIMBER-CONTRACTOR Use case Procure the timber contractor early The client procures a timber contractor after the study or preliminary design and involves it in the design, so that the construction is designed only once and to suit the contractor's production and assembly system. DES-FURNITURE Use case Plan the furnishing and procure the furniture Represent furniture in the model so that options, furniture schedules, and spatial requirements can be coordinated early and reused reliably for procurement. BES-ELEVATOR-EARLY Use case Tender the elevator installation early The client tenders the elevator installation early, once the building permit has been granted, and so obtains binding shaft and installation parameters before floor plans, structure, and foundations are developed further, avoiding late redesign. BES-MASONRY-TENDER Use case Provide the basis for the masonry tender The client orders from the architecture team a verifiable overview of masonry wall types and quantities, so that the masonry tender contains correct net areas and fire and acoustic requirements and variations are avoided. BES-STEELWORK-TENDER Use case Provide the basis for steelwork tendering The client orders from the design team a steelwork component schedule with locations and principal dimensions from the model, so that the steelwork tender has verifiable quantities without paying twice for shop design. DES-DRYWALL-REINF Use case Plan drywall reinforcement Plan reinforcement for wall-mounted fixtures explicitly so it can be tendered and installed before drywall partitions are closed. BES-TILING-TENDER Use case Provide the basis for the tiling tender The client orders from the architecture team a room-by-room quantity overview of floor and wall tiling from the model, so that tendering and invoice checking rest on the same traceable quantity basis. CON-ROOM-LABEL Use case Manage fit-out room by room with a checklist Keep the fit-out steps for each room in a shared checklist so that trades work to a takt and the status of every room is visible on site. BES-PAINTING-TENDER Use case Provide the basis for the painting tender The client orders from the architecture team a room-by-room quantity overview of painting areas from the model, so that tendering and invoice checking rest on the same traceable quantity basis. CON-REINF-EXEC Use case Reinforcement execution from model Prepare reinforcement and edge strips from the formwork and reinforcement model for construction execution. BES-PLAN-BOX Use case Procure plan and model stations Make current drawings, models, and project data directly usable on every active storey, at the place of work. CON-FASTEN-SUSP Use case Fastening and suspension from model Plan fastenings and suspensions on the basis of the coordinated structural and MEP models so that they do not have to be improvised on site. BES-SITE-WLAN Use case Procure temporary site Wi-Fi Procure temporary Wi-Fi amplifiers so that tablets reach the project platform in every work area, including basements without mobile reception. CON-PRECAST-ORDER Use case Precast concrete parts ordering from model Provide precast concrete parts from the structural model for ordering and delivery planning. BES-ICE-SESSION Use case Order an ICE session Order an ICE session (Integrated Concurrent Engineering) as a targeted way of working to cut the latency of decisions. It is not a coordination meeting under a new name and only pays off on extremely large or extremely urgent projects. CON-SHL-BWP Use case Create formwork and reinforcement plans Derive formwork and reinforcement plans for concrete execution from the structural model. CON-ROBOT-LAYOUT Use case Set out the fit-out robotically on the structural slab Derive the layout file for robotic slab marking directly from the architecture model and print it on the structural slab - so fit-out can start without manual layout errors. CON-PROGRESS-DOC Use case Document construction progress with 360° captures Record construction progress on a route repeated every week and compare it with the schedule. CON-FINAL-MEASUREMENT Use case Determine final quantities for contractor accounts from the model Derive final quantities from the updated construction model so that contractors' final accounts can be checked and approved faster. CON-DEFECT-MGMT Use case Capture and manage defects with room QR codes Capture defects directly at the affected location using a room QR code so that each report is assigned unambiguously without searching a drawing or navigating through an app. DES-ELEMENT-COST-EARLY Use case Calculate element-based costs in early project phases Combine component quantities and early unit rates into a traceable cost forecast while constructions and build-ups are not yet fully defined. DES-ABSTRACTBIM-BPS Use case Derive the basis for heating demand verification to SIA 380/1 from the model Derive the basis for heating demand verification to SIA 380/1 from the architecture model without manually remodelling the thermal envelope. DES-ELEMENT-COST-LATE Use case Calculate element-based costs in late project phases Develop the early forecast into a detailed cost calculation using calculated component types, refined quantities, and type-specific unit rates. DES-APT-SCHEDULE Use case Prepare apartment schedule Derive the apartment schedule from gross volumes and net spaces and update it reliably when the design changes. DES-URBAN-MASS Use case Create the urban design mass study Model and evaluate gross volumes by storey so that urban design options and metrics can be compared directly. DES-PARCELS Use case Make the affected parcels visible Represent parcels relevant to building law in the model so that boundaries, easements, and cadastral references remain verifiable at all times. DES-MODEL-VIS Use case Create visualizations from the model Create visualizations manually or with generative AI from a fit-for-purpose geometric basis without overloading the design and construction models with purely visual detail. DES-CEILING-MIRROR Use case Coordinate suspended ceilings Represent suspended ceilings in the model from early room assignment through construction-ready layer modelling so that fit-out and MEP can be coordinated reliably. DES-FACADE Use case Maintain the facade in the model Maintain the building envelope in the model - simple build-ups as a multi-layer component, complex build-ups with individually modelled facade layers. DES-LIGHTING-COORD Use case Coordinate lighting concept and fixture design Deliberately bring together the lighting concept, architecture, and technical fixture design so the approved design intent is implemented correctly in the electrical or lighting designer's model. DES-BASIC-PIPING Use case Coordinate drainage and wastewater early Coordinate drainage and wastewater early in the model - before clashes in risers and below the base slab trigger costly design changes. DES-FLOORING Use case Plan floor build-ups Model floor build-ups as areas so finish, subfloor, joints, and quantities can be evaluated reliably for execution. DES-LAYOUT Use case Plan the layout with schematic floor plans Model the layout with spaces only and derive schematic floor plans - change walls with few clicks. HOV-FM-MIN Use case Hand over minimal operational data as lists Deliver space, door, and window lists plus FM-relevant building services as structured data at handover to the operator - without full 3D plant modelling. DES-DOOR Use case Derive the basis for door planning Derive the door-design basis from the model so that door schedules and discipline coordination do not rely on scattered individual details. HOV-FM-3D Use case Hand over managed objects in the 3D model Agree with the operator which objects they actually manage - and hand over only those with the agreed master data and documents in the 3D model. DES-PARKING Use case Verify parking spaces Represent and evaluate parking spaces in the model so that parking verification can be kept aligned with the design and traffic study. DES-UNDERFLOOR-HEATING Use case Provide the basis for underfloor heating Bring together space, floor-build-up, and heating-load information early for underfloor-heating design. HOV-COBIE Use case Hand over operational data in COBie format Hand over operationally relevant master data so that the operator can check it in the target system and import it using the open COBie format. HOV-NATIVE Use case Hand over native models for long-term use Package and check native discipline models so that they can still be opened, exported, and, where required, maintained years later. HOV-PRODUCT-PASS-GTIN Use case Link the product passport via GTIN Link product-passport information unambiguously to installed product types by GTIN without duplicating the complete manufacturer data in the model. DES-GFA Use case Determine storey floor areas Derive floor areas from the space model so that planning-law and economic metrics remain aligned with the design state. DES-SANITARY-FIXTURE-COORD Use case Coordinate sanitary fixtures Coordinate sanitary fixtures jointly, from first placement through to detailed plumbing design, so that connections and service linings match the approved locations and dimensions. HOV-PRODUCT-PASS-SERIAL Use case Link the product passport via serial number Assign product-passport information to an individual installed product by GTIN (Global Trade Item Number) and serial number, keeping its individual life cycle traceable. DES-MATERIAL-PASS Use case Create the material passport for urban mining Anchor materials, detachability, and reuse potential in the model - so building material passports and LCAs are possible without manual re-entry. DES-KV Use case Determine the construction volume Derive construction volume from gross volume, net spaces, and air spaces so material use can be compared already in early phases. DES-LCA Use case Calculate the life-cycle assessment Carry component quantities, materials, and product class so LCA and grey energy via KBOB are possible without parallel quantity lists: early via the product class, later refined by the calculated type. DES-USAGE-AGREEMENT Use case Visualize the structural usage agreement room by room Record usage and structural requirements from the usage agreement per space in the model and derive readable visualizations from them. DES-MEP-USAGE-AGREEMENT Use case Visualize the MEP usage agreement room by room Record agreed room conditions and usage assumptions in the model and present them in readable thematic plans. DES-SIA416 Use case Verify areas to SIA 416 SIA 416 area verification from the space model - derive the area class from the standardized room use. DES-D0165 Use case Verify areas to SIA D0165 Derive the SIA D0165 area verification from the space model so that area classes and uses can be evaluated and checked traceably. DES-PLANNING-INTERFACE Use case Visualize design interfaces Carry design responsibility per component in the model and colour it - forgotten parts at design interfaces become visible. DES-EBKP-H Use case Calculate the eBKP-H classification Derive eBKP-H codes for major architecture and MEP positions from a few model properties - instead of classifying by hand. OPR-SIGNAGE-ROOM Use case Maintain signage room numbers Maintain and update signage room numbers in operation - separate from the technical planning room number. DES-DRAWINGS Use case Derive plans from the model Derive drawings from the 3D model and use them to check that geometry and components are complete and consistent with the design. OPR-FM-ARCH Use case Maintain IFC models during alterations Extract an alteration area from the approved overall IFC model in a controlled manner and reinsert it after completion - without gaps, duplicates, or conflicting model revisions. DES-FIRE-CONCEPT Use case Create the fire protection requirements model Keep the approved fire protection concept as a requirements model instead of a fire protection plan, so requirements are assigned unambiguously to the components and can be checked when the design changes. OPR-FM-PC Use case FM with a classified point cloud Capture the completed asset as a classified point cloud and use it directly for FM processes - without maintaining a complete existing-condition model. DES-PHYSICS Use case Create the building physics requirements model Translate the approved building physics concept into a spatially assigned requirements model so sound and thermal insulation can be checked unambiguously and continuously in the architecture model. OPR-FIRESTOP-MAINT Use case Manage firestops in operation Permanently identify, inspect, and update firestops during alterations so that the required fire resistance is maintained in operation. DES-PERMIT Use case Prepare the building permit application Compile the building permit application from the coordinated design state so that forms, evidence, and permit drawings are complete and consistent. DES-SOUND-SIA181 Use case Derive SIA 181 sound insulation requirements from room use Set the noise load and noise sensitivity of every room and derive the sound insulation requirement of every separating element from them, so missing or too low requirements between usage units show up before the tender. DES-WALL-REQUIREMENTS Use case Combine wall requirements from discipline reports Combine fire protection and building physics requirements for each wall to create unambiguous requirement profiles and suitable wall types. OPR-BUILDING-PERFORMANCE Use case Optimize building operation during the first years Support building operation during the first years with actual use and measurement data so deviations from the operating concept are identified and effective optimizations are demonstrated. DES-MEP-SCHEM Use case Develop MEP schematics Develop MEP system and riser schematics and formally approve them before construction. DES-FIRE-MATRIX Use case Develop the fire cause-and-effect matrix Formally approve the fire cause-and-effect matrix for detectors, dampers, actuators, and suppression equipment before construction. COM-QR-STAKEHOLDER-INFO Use case Digital resident information Keep residents informed continuously via letter or notice with a QR code about measures and site installation, so those affected can inform themselves instead of guessing or complaining. DES-TRAFFIC Use case Check the requirements from the traffic study Continuously check traffic study requirements against the model - parking and turning radii stay aligned with the planning status. COM-STAKEHOLDER-DIALOG Use case Neighbourhood and stakeholder dialogue Involve affected neighbours and authority representatives in a structured way before submission, so objections surface early rather than only in the formal objection procedure. DES-UVP Use case Develop the environmental impact report Prepare the environmental impact assessment from the current design state so that impacts can be demonstrated consistently to authorities and in the building application. QAS-URBAN-AR Use case Assess the urban design on site with augmented reality Assess the volume model and the planned trees on site with AR glasses, so urban design decisions are not taken on a figure-ground plan that omits the third dimension and the vegetation volume. QAS-COORD-ZONE Use case Plan coordination zones Define coordination zones in the model and assign them to meetings so that not every model has to be checked against every other model. DES-HUMUS Use case Determine topsoil quantities Represent topsoil as a layer that can be designed, so that stripping, reinstatement, and surplus quantities can be evaluated for cost and construction sequencing. QAS-EARLY-COORD Use case Coordinate architecture and building services early Align concept and feasibility early in the model - comparable to a sketch design, without execution detail. DES-TERRAIN Use case Check the terrain and the building connections Represent the designed terrain in the model so that connections, drainage, and height references to the building can be checked. QAS-MEP-DETAIL Use case Architecture - building services coordination in late design stages Coordinate building services in construction-ready detail from the building-design phase onward so that clashes, connections, and spatial conditions can be checked before construction. QAS-ARCH-STRUCT-ADOPT Use case Adopt structural design in the architecture model Adopt the coordinated dimensions of the coarse structural components in the architecture model while no detailed structural model exists yet. QAS-EXCL-ZONE Use case Define exclusion zones Keep the structural engineer's binding exclusion zones as planning boundaries so that architecture and building services leave those volumes clear. DES-ARCH-MEP-COORD Use case Coordinate architecture and building services Coordinate MEP routes, equipment, and space requirements with architecture and update both discipline models consistently. QAS-ARCH-STRUCT-COORD Use case Coordinate architecture and structure Coordinate load-bearing components between the architecture and structural models so that geometric deviations are detected before construction and do not have to be maintained twice. DES-EMBED-REINF Use case Coordinate embeds and architectural components with reinforcement Coordinate embeds and cast-in architectural components with reinforcement before concrete placement and maintain them as binding objects in the formwork and reinforcement model. DES-STRUCT-MEP-OPENINGS Use case Adopt MEP openings in the structural model Coordinate MEP opening requirements with structural engineering and, once approved, adopt them as binding openings in the structural model. QAS-SPECIAL-ROOM-USER Use case Align special rooms with the users Sketch special rooms roughly in the model and coordinate them with future users before accurate modelling begins in the overall model. The aim is to obtain the decisions that give planning certainty. DES-COMPLEX-ASSEMBLY Use case Plan complex assemblies and intermediate states Visualize and assess assembly options and temporary construction states with simplified models before they cause conflicts on site. DES-STRUCT-MASONRY Use case Adopt main-contractor masonry in the structural model Coordinate non-load-bearing interior masonry walls executed by the main contractor with structural engineering and adopt them as binding objects in the structural model. QAS-DET-REF Use case Locate standard details in the model and check for gaps Locate in the 3D model where each standard detail applies and check that everything is detailed, before gaps only show up during execution. QAS-OUTLET-USER Use case Obtain user approval for outlet types Coordinate recurring outlet types and their typical locations with users so electrical design is based on clear decisions without requiring approval for every individual outlet. DES-CRIT-INSERT Use case Keep critical areas as an insert model Do not develop security-critical areas in the federated overall model; keep them in a separate insert model with restricted access. QAS-DECISION-VIS Use case Visualize decisions and their impacts Visualizations help design teams make decisions and their impacts spatially understandable and reach binding decisions in good time. QAS-FIRE Use case Check fire resistance on components Automatically check the architecture model against the approved fire protection requirements model so deviations become visible after every relevant design change. QAS-ACOUSTIC Use case Check sound and thermal insulation on components Automatically check the architecture model against the approved building physics requirements model so sound and thermal insulation deviations become visible after every relevant design change. QAS-ELEMENT-PERF Use case Check component types against performance requirements Check wall, slab, window, and door component types against the performance requirements that follow from the chosen framework conditions, so every type demonstrably meets what was ordered. QAS-INSTALL-PATH Use case Verify installation access paths Carry the installation access paths to be kept clear in the model and prove that equipment can be brought in - before large plant or components force alterations and deconstruction. QAS-MAINT-SPACE Use case Verify maintenance spaces Maintain clear maintenance spaces in the model and prove them clash-free - before plant becomes unmaintainable. QAS-VORSATZ Use case Verify the area requirement of facing shells Account for the space required by service linings in the model and verify their impact on floor area - before wet rooms become too small, trigger redesign, or impair lettability. QAS-DESIGN-REVIEW Use case Carry out the design review at the end of the phase Design review at the end of each project phase - check planning quality and maturity, record open points, and document release for the next phase. QAS-FURNISHABILITY Use case Verify furnishability Prove furnishability of interior rooms so clients can decide and approve without being able to read plans. QAS-TREE-PRESERVE Use case Verify tree stock to be preserved Represent trees to be preserved in the model with their crowns and root zones and check for conflicts before construction work puts the existing trees or the permit at risk. QAS-ROOM-PROGRAM Use case Reconcile the room programme with the model Continuously reconcile the ordered room programme with the model - so it is always clear whether the ordered rooms are still fulfilled. LAN-SPONGE-CITY Use case Verify the sponge-city principle Model root space, infiltration, and retention in the outdoor area so rainwater stays on site instead of flowing into the sewer, and trees receive a root volume that sustains them over their standing life. QAS-COST-INTERFACE Use case Visualize cost interfaces between base building and tenant fit-out Before tendering and after every contract change, check that the cost bearers in the model match the split between base building and tenant fit-out agreed in the lease. QAS-CONSTRAINT Use case Check the design against planning-relevant constraints Make binding external requirements visible early in the model and check the design against them - before options become locked in. QAS-AWARD-INTERFACE Use case Visualize award interfaces Before each tender is sent out, check that every component is assigned to exactly one procurement package of the agreed breakdown - forgotten parts and overlaps at contractor interfaces become visible. QAS-HAZMAT-CHECK Use case Plan measures for hazardous-material findings Assign hazardous-material findings to the affected existing components and use them as a basis for planning remediation, deconstruction, and protection measures. QAS-ACCESS-SIA500 Use case Verify accessibility to SIA 500 Make deviations from the accessible route visible before the permit submission, instead of discovering them only during the permit procedure. QAS-SITE-LOGISTICS Use case Check site logistics across the construction phases Plan site logistics volumetrically and keep them current across phases - before ramps, slopes, and space needs surprise on site. QAS-DAYLIGHT Use case Verify daylight provision using glazed areas Calculate the effective glazed area for each space from the architectural model so that spaces with insufficient daylight are identified before the permit submission. QAS-FALL-PROTECTION Use case Assess fall protection Fall-protection systems are safety-critical components and require particular care in planning and coordination. Their location, height, connections, and continuous coverage must therefore be assessed spatially at an early stage. QAS-COST-PLAUS Use case Component cost plausibility check Check the designer's unit prices against schema.pragmaticbim.ch and the cost database - by product class and type. QAS-CONTRACTOR-DESIGN Use case Verify shop and installation design Verify shop and installation design against the agreed design-relevant interfaces without remodelling the contractor's solution in detail in the architecture model. QAS-ELEMENT-COST-POSTCALC Use case Post-calculate component costs and feed unit rates back After award and after the final account, check the unit rates of the cost calculation against award and actual costs per component type and keep the checked benchmarks for future projects. QAS-BENCHMARK Use case Benchmark a project against comparable building tasks Compare a project or its variants with comparable building tasks by indicators, so that deviations from the usual become visible. QAS-FUND Use case Check and verify funding Identify eligible measures early and maintain traceable evidence through to payment. QAS-USAGE-AGREEMENT Use case Compare usage-agreement requirements with actual values Compare agreed requirements and verified design values for each space so that structural and MEP deviations become visible before approval. QAS-BUILD-SEC Use case Verify building security measures Check the architecture model against the approved security concept so that security zones, protection data, and burglary resistance remain traceable. QAS-FUNCTIONAL-ACCEPTANCE Use case Verify building functions at handover Check the completed solution against the agreed usage scenarios so that building handover records not only visible defects but also confirms the functions the client ordered. PROJECT Element Project Establishes the shared organizational frame of reference so that discipline models and their content can be assigned unambiguously to the same construction project. SITE Element Planning perimeter Defines the shared project area so that buildings, property references, and external works can be coordinated consistently in space. BUILDING Element Building Structures the construction project into clearly identifiable building volumes so that discipline models, storeys, and evaluations can be coordinated by building. STOREY Element Storey Establishes the shared vertical structure so that spaces and components can be assigned to the same building level across all discipline models. SURVEY-REF Element Survey reference point Provides a binding position and height reference so that discipline models align correctly and can be set out accurately on site. SPACE-GROSS Element Gross volumes Provides a consistent basis for massing studies, area and volume evaluations, and urban design decisions. SPACE-INT Element Interior spaces Links the room programme, area verification, and discipline planning so that use, sizing, and technical requirements can be coordinated for each space. SPACE-EXT Element Exterior spaces Makes usable exterior areas measurable for area verification, use planning, and coordination between the building and its surroundings. SPACE-ELEVATOR Element Lift Enables the occupied area to be assigned by storey so that area verification can be maintained correctly. SPACE-AIR Element Air spaces Prevents non-occupiable volumes from being counted as floor area while providing a spatial reference for building services. SPACE-PARK Element Parking spaces Enables traceable parking verification and reliable area and traffic planning from the building design phase onward. SPACE-VORSATZ Element Wall lining (usable space) Makes space and floor-area loss verifiable early so that rooms, especially sanitary spaces, can be sized adequately. ARC-WALL-EXT Element Exterior wall Exterior walls provide the basis for area and quantity take-off, building physics, and facade coordination. ARC-SLAB-BALCONY Element Balcony Makes exterior space, the structural concept, and the building envelope jointly verifiable early on and supports reliable permitting and cost decisions. ARC-SLAB-BASE Element Base slab Makes the building support and load transfer into the ground spatially verifiable early and provides design certainty for basements, waterproofing, and excavation. ARC-SLAB-FLOOR Element Floor slab Defines the load-bearing separation between storeys early and provides design certainty for room heights, structure, and building services. ARC-ROOF-FLAT Element Flat roof Makes the structural concept and building enclosure spatially verifiable early and provides design certainty for levels, build-ups, and permitting. ARC-FOOTING Element Footing Makes the space and location required to transfer loads into the ground verifiable early and prevents conflicts with basements, services, and excavation. ARC-WALL-INT Element Non-load-bearing interior wall Makes the spatial layout reliably verifiable early on and provides the basis for fire, acoustic, and interior-fit-out coordination. ARC-WALL-INT-LB Element Load-bearing interior wall Makes load transfer and space separation jointly verifiable early on and provides a reliable basis for structural, fire, and acoustic coordination. ARC-COLUMN Element Column Makes point load transfers spatially verifiable early and prevents conflicts with the spatial layout, facade, and building services. ARC-ROOF-PITCH Element Pitched roof Makes the roof form and structural concept spatially verifiable early on and supports reliable permitting and coordination decisions. ARC-STAIR Element Stair Rough stair geometry for design, coordination, and quantity take-off. ARC-BEAM Element Beam / girder Makes load-transfer zones visible early and prevents conflicts between the structure, spatial concept, and building services. ARC-RAILING Element Fall protection / railing Simplified geometry for spatial planning and assessment of permanent and temporary fall protection. ARC-WINDOW-EXT Element Exterior window Ensures daylight, ventilation, and views and provides a verifiable basis for facade and building-physics design. ARC-DOOR-EXT Element Exterior door Ensures functional building access and provides the basis for escape-route, facade, and building-physics design. ARC-OPENING-VOID Element Opening / recess (architecture) Secures the required routes for services and installations and prevents uncoordinated penetrations between architecture, structure, and building services. ARC-WINDOW-INT Element Interior window Ensures daylight transfer between interior spaces and provides a verifiable basis for spatial and acoustic design. ARC-DOOR-INT Element Interior door / inspection hatch Ensures functional connections between spaces and provides the basis for escape-route, fire, and acoustic design. ARC-SHADING Element Shading device Makes external sun protection visible in the model so location, type, and shading are recorded for facade planning and thermal simulation. ARC-FIRE-ACOUSTIC-SEAL Element Firestop / acoustic seal Separates the installed seal from the opening and makes its type, performance, and quantity verifiable for tendering, construction, and operation. ARC-CEILING Element Suspended ceiling Ensures coordinated room heights, ceiling design, and building services. ARC-FLOOR-COV Element Interior floor build-up Provides a reliable basis for level coordination, joint design, tendering, and quantity take-off for interior finishes. Modelled in every room from tendering on; before that and in operation, the floor finish sits on the interior space. ARC-FLOOR-COV-EXT Element Exterior floor covering Makes exterior finishes verifiable in detail design for quantities, joints, and tendering. Early planning without a modelled covering: FloorCovering (AOF) on the exterior space. ARC-WALL-CLAD-EXT Element Facade cladding Enables separate design and quantity take-off of the facade surface and improves coordination with connections and openings. ARC-ROOF-DRAIN Element Tapered insulation / roof build-up Shows early how much build-up height the roof and balcony fall requires. The building height is then fixed for the permit, and pipes in the foundation can be connected to the outlets. ARC-ROOF-OVERFLOW Element Emergency overflow Shows early where and at what level water leaves the roof when outlets are blocked, so the parapet, facade, waterproofing upstand, and structural load assumptions can be coordinated. FURN Element Furniture Reveals early whether spaces can actually be furnished for their intended use and are adequately sized. ARC-FURN-BUILTIN Element Built-in furniture / kitchen Shows early how much space the kitchen and built-in cabinets need and where the connections sit. Shop and installation design can check dimensions and connections against this. ARC-WALL-CLAD Element Interior wall cladding Enables room-specific design and quantity take-off of surface finishes for tendering and interior-fit-out coordination. ARC-DRYWALL-REINF Element Drywall reinforcement zone Makes required fixing support spatially checkable before tendering and construction and prevents subsequent daywork. STR-EXCL-ZONE Element Exclusion zone Keeps required structural volumes clear and prevents costly clashes with architecture and building services. STR-OPENING-VOID Element Opening / recess (structural) Transfers approved voids into the structural model as binding information so that clashes are avoided and penetrations can be built as planned. MEP-PROV-VOID Element Provision for void Reserves penetrations in time so structure and building services can be coordinated without later core drilling. LAN-TREE Element Tree Makes decisions on protection, removal, and new planting spatially verifiable so that the building and external works account for the tree inventory. MEP-SCH-PIPE Element Pipe (schematic) Reserves main pipework routes in the initial phase and reduces later clashes. SURVEY-SURFACE Element Surface geometry Provides existing and designed terrain so that connections to the building and earth quantities can be planned in coordination. ARC-PARCEL Element Building-law parcels Shows early which cadastral parcels the project affects and supports alignment of the planning perimeter and permitting process. LAN-HUMUS Element Topsoil Makes topsoil quantities verifiable early for cost, so that stripping, reinstatement, and surplus do not appear only at tender. MEP-SCH-DUCT Element Duct (schematic) Reserves main ventilation routes in the initial phase and reduces later clashes. ARC-UMG-NEIGHBOR Element Surrounding buildings Represents neighbouring buildings as simple volumes so objection-relevant effects (shadow, views, setbacks) can be checked and documented in the stakeholder dialogue. MEP-SCH-TRAY Element Cable tray (schematic) Reserves main electrical routes in the initial phase and reduces later clashes. LAN-RETENTION Element Retention volume Makes retention volume assignable to catchments and the sizing against heavy rain traceable. MEP-SCH-EQUIP Element Plant space (schematic) Reserves sufficient plant-room space in the initial phase and prevents conflicts with other uses. MEP-DOWNPIPE Element Downpipe Secures roof and balcony drainage by coordinating routes, connections, and slab penetrations. ARC-SITE-LOG Element Site setup object Makes the space requirements and sequence of site logistics alignable early and prevents conflicts during construction. STR-BEAM Element Beam / girder detailed Enables reliable coordination of load transfer, penetrations, and connections through to execution. ARC-DET-REF Element Detail reference Makes it spatially verifiable where standard details apply and reveals missing or conflicting detail assignments early. STR-COLUMN Element Column detailed Ensures coordinated load transfer and clash-free placement of adjacent components through to execution. ARC-DEC-VOL Element Decision volume Makes it spatially verifiable where a decision applies and whether it is still open, approved, or superseded. ARC-INSTALL-PATH Element Installation access path Ensures large equipment can be transported to its installation location without clashes. STR-FOOTING Element Footing detailed Provides a reliable basis for coordinating load transfer, excavation, and utility lines. STR-WALL Element Wall detailed Enables reliable coordination of load transfer, openings, and connections through to execution. ARC-COORD-ZONE Element Coordination zone Clearly assigns spatial review areas to coordination meetings and prevents unclear responsibilities. STR-SLAB-FLOOR Element Floor slab detailed Enables reliable coordination of load transfer, openings, and cast-in items through to execution. ARC-CONSTRAINT Element Planning constraint Makes external requirements spatially verifiable from an early stage and supports quality assurance when checking the design against protection, hazard, and permitting requirements. STR-SLAB-BASE Element Base slab detailed Ensures coordinated planning of load transfer, waterproofing, and penetrations through to execution. ARC-MAINT-SPACE Element Maintenance space Ensures plant remains permanently accessible and can be maintained without spatial conflicts. STR-SLAB-ROOF Element Flat roof detailed Ensures coordinated planning of load transfer, falls, roof build-up, and penetrations. ARC-MOVEMENT-CLEARANCE Element Movement clearance Makes the areas that must remain clear for accessibility spatially verifiable so conflicts with building elements and furniture are found before the permit submission. ARC-TURN-RAD Element Turning radius Demonstrates that vehicles can safely use the planned access routes and manoeuvring areas. STR-STAIR Element Stair detailed Ensures early coordination of the structure, level transitions, and usable flight geometry. ARC-UMBAU-PER Element Alteration area Makes planned and completed alterations spatially and chronologically traceable in the overall model. STR-RAMP Element Ramp detailed Ensures early coordination of the structure, level transitions, and required gradient. STR-REBAR Element Reinforcement Provides unambiguous steel schedules and placing information to reduce execution errors. STR-EDGE-STRIP Element Edge strip Ensures formwork terminations can be specified, coordinated, and executed unambiguously. MEP-CHILLER Element Chiller Secures cooling supply by coordinating capacity, plant footprint, and service connections early. MEP-COOL-TOWER Element Cooling tower / free cooler Secures heat rejection by coordinating capacity, location, structure, acoustics, and water management. MEP-ELEC-GEN Element Backup generator Secures standby power by coordinating capacity, location, fuel supply, and exhaust routing. MEP-ELEC-DIST Element Electrical distribution board Represents the distribution hierarchy so loads, feeders, plant space, and accessibility can be coordinated. MEP-TRANSFORMER Element Transformer Secures the required voltage level by coordinating load, plant space, cooling, and protection requirements. MEP-UPS Element Uninterruptible power supply Secures critical loads by coordinating autonomy, loads, plant space, and cooling. MEP-BOILER Element Boiler / water heater Secures heat supply by coordinating capacity, plant footprint, flue route, and service connections early. MEP-HEAT-EX Element District heat substation Clarifies thermal system separation so substation capacity, connections, and space requirements can be coordinated. MEP-COMPRESSOR Element Compressed air compressor Secures compressed-air supply by coordinating capacity, location, acoustic protection, and connections. MEP-GAS-REG Element Gas pressure regulator Clarifies the gas supply interface so pressure level, metering, safety distances, and pipe connections can be coordinated. MEP-FAN Element Fan Secures the required airflow by coordinating duty, duct connections, acoustic protection, and maintenance access. MEP-TANK Element Tank / separator Secures the required storage volume by coordinating location, structure, connections, and maintenance access. MEP-PUMP Element Pump Secures flow and pressure by coordinating duty, connections, location, and maintenance access. MEP-UNITARY Element Unitary equipment / monoblock Secures compact plant operation by coordinating footprint, service connections, and maintenance zones together. MEP-COMMS Element Communications appliance Fixes communication device locations so coverage, connectivity, power supply, and finishes can be coordinated. MEP-COOL-BEAM Element Chilled ceiling / beam Secures room conditioning and coordinates output, water connections, condensation risk, and ceiling layout. MEP-SPACE-HEATER Element Radiator Secures room heat delivery by coordinating output, connections, placement, and clearances. MEP-AIR-TERM Element Air terminal / grille Enables air-distribution verification and coordination with ceiling layout and occupied zones. MEP-AIR-BOX Element Air terminal box Enables demand-based airflow control and secures installation and maintenance space above the ceiling. MEP-LIGHT Element Light fixture Enables lighting verification and coordination of ceiling layout, power supply, and maintenance access. MEP-OUTLET Element Socket / data outlet Fixes connection points so use, service routes, and finishes can be coordinated. MEP-SWITCH Element Switch Fixes control and switching points so electrical function, finishes, and user access can be coordinated. MEP-DAMPER Element Damper Fixes air isolation and control points so airflow, fire safety, and maintenance access can be coordinated. MEP-SANITARY Element Sanitary terminal Fixes sanitary fixtures so use, water connections, drainage, and space requirements can be coordinated. MEP-WASTE Element Waste terminal Fixes drainage points so falls, pipe routes, and sanitary fixtures can be coordinated. MEP-GAS-TERM Element Gas outlet Fixes gas draw-off points so pipe routes, isolation, and appliance connections can be coordinated. MEP-FIRE-TERM Element Fire suppression terminal Enables verification of fire-suppression coverage and coordination of the required clearances. MEP-VALVE Element Valve / manifold Fixes isolation and control points to support operation, hydraulic balancing, and maintenance. MEP-ALARM Element Smoke detector / alarm Enables verification of fire detection coverage and coordinated placement with finishes and ceilings. MEP-SENSOR Element Sensor Fixes measurement points so controls, monitoring, and accessibility can be coordinated. MEP-ACTUATOR Element Actuator Makes control functions coordinable so controls, power supply, and maintenance access are secured. ARC-DEVICE-SPACE Element Device space Reserves space early for devices that drive room size, structure or connections, so special rooms can be agreed with users before devices are chosen. MEP-ESCAPE-SIGN Element Escape sign Makes exits and escape directions visible in the model so fire protection and electrical design can check marking, lighting type, and supply together. CMP-SAN-01 Component Wall-hung WC WC with pre-wall installation; fixes space and position relative to the shaft for the floor plan. CMP-SAN-02 Component Wheelchair-accessible WC WC with a lateral transfer area so a wheelchair-accessible bathroom can be verified in the floor plan. CMP-SAN-03 Component Washbasin Single wall-mounted washbasin; shows space and water connection in the bathroom. CMP-SAN-04 Component Double washbasin Washbasin with two bowls for bathrooms used by two people at once. CMP-SAN-05 Component Wheelchair-accessible washbasin Washbasin with knee space and a manoeuvring area in front so it can be used from a wheelchair. CMP-SAN-06 Component Level-access shower Level-access shower in a room corner; fixes the shower area and the floor drain. CMP-SAN-07 Component Bathtub Wall-mounted bathtub; drives the length and width of the bathroom. CMP-SAN-08 Component Utility sink Sink for laundry and utility rooms, used for pre-washing and cleaning water. CMP-SAN-09 Component Kitchen sink Sink set into the worktop; sets where the water and drainage connections sit in the kitchen run. CMP-KIT-01 Component Single-row kitchen Kitchen block along one wall with base units, worktop, sink and a tall cabinet. CMP-KIT-02 Component L-shaped kitchen Kitchen block around a room corner with two legs, sink and a tall cabinet. CMP-KIT-03 Component Kitchen island Free-standing kitchen block with worktop, accessible from all sides. CMP-KIT-04 Component Kitchen tall cabinet Full-height kitchen cabinet, usually for fridge and oven; part of a kitchen block. CMP-KIT-05 Component Kitchen wall cabinet Wall-hung cabinet above the worktop; part of a kitchen block. CMP-STO-01 Component Built-in wardrobe Full-height built-in wardrobe against a wall for clothes and supplies. CMP-STO-02 Component Entrance wardrobe Cupboard at the dwelling entrance for coats and shoes. CMP-LAU-01 Component Washer-dryer stack space Space for a washing machine and tumble dryer stacked, with water, drainage and power connections. CMP-LAU-02 Component Washing machine space Space for one washing machine with water, drainage and power connections. CMP-LAU-03 Component Tumble dryer space Space for a tumble dryer with power and, depending on the appliance, a condensate drain. CMP-FUR-01 Component Shelf Open shelf against a wall for storerooms, cellars and studies. CMP-FUR-02 Component Single bed Single bed with the head against a wall; checks whether bedrooms and guest rooms can be furnished. CMP-FUR-03 Component Double bed Double bed with the head against a wall and access from both sides. CMP-FUR-04 Component Dining table Dining table with a chair zone on both long sides; its width follows the number of seats. CMP-FUR-05 Component Sofa Sofa as the anchor piece of the living room; checks the seating area and the passage. CMP-FUR-06 Component Desk Desk against a wall with a chair zone for working from home. CMP-DOR-01 Component Interior swing door Single-leaf swing door between two interior rooms; its swing keeps an area clear in the room it opens into. CMP-DOR-02 Component Interior sliding door Sliding door in front of the wall or in a wall pocket; saves the swing area in small rooms. CMP-DOR-03 Component Dwelling entrance door Entrance door of the dwelling to the stair core or corridor, with fire, acoustic and burglary requirements. CMP-DOR-04 Component French window Glazed door in the façade to the private outdoor space; provides daylight and access at once. CMP-WIN-01 Component Window Window in the exterior wall; its size and sill set daylight and view. CMP-PAS-01 Component Passage Doorless opening between two rooms of a dwelling, for example between kitchen and living room. CMP-CLR-01 Component Turning area SIA 500 Area kept clear for a 180° turn in a wheelchair; makes the SIA 500 check verifiable in the model. CMP-CLR-02 Component Manoeuvring area SIA 500 Area kept clear for changes of direction over 45° in a wheelchair, for example in front of doors and fixtures. CMP-WRK-01 Component Office workstation Work desk with a chair zone; counts the workstations an office can take. CMP-WRK-02 Component Meeting table Table with a chair zone all round; its length follows the number of seats in the meeting or conference room. CMP-WRK-03 Component Worktop Fixed worktop against a wall, for example in a copy room, phone booth or nurses' station. CMP-WRK-04 Component Workbench Workbench against a wall with power for workshops, training workshops and maintenance. CMP-WRK-05 Component Work table Free-standing work table for assembly, packing, inspection or studio work, usable from two sides. CMP-EDU-01 Component Pupil desk Two-person desk with a chair zone; counts the seats in classrooms, seminar rooms and study rooms. CMP-EDU-02 Component Wall board Wall board or interactive board on the front wall; sets which way the room faces for teaching. CMP-SEA-01 Component Seat row with writing shelf Fixed seat row with a writing shelf for lecture halls; its depth includes the passage to the next row. CMP-SEA-02 Component Chair row Row of chairs for assembly halls, stands and waiting areas; its width follows the number of seats. CMP-SEA-03 Component Bench Fixed bench against a wall for changing rooms and cloakrooms. CMP-CNT-01 Component Reception desk Desk for reception and customer service, with a staff zone behind and a visitor zone in front. CMP-CNT-02 Component Checkout counter Checkout point in retail with a customer zone in front and a staff zone behind. CMP-CNT-03 Component Service counter Counter for a bar, buffet, kiosk or cloakroom, with a queue in front and a service zone behind. CMP-STO-03 Component Filing cabinet Cabinet for files and work materials against a wall. CMP-STO-04 Component Free-standing shelf Double-sided shelf in the room for libraries and retail; aisles follow from its clear areas. CMP-STO-05 Component Lockers Cabinet run with lockable compartments for changing rooms, locker rooms, parcel lockers and letterboxes. CMP-STO-06 Component Pallet racking Fixed pallet racking with a forklift aisle in front; sets storage capacity and hall height. CMP-FUR-07 Component Bistro table Small guest table with a chair zone all round; counts the seats in cafeterias, restaurants and bars. CMP-KIT-06 Component Commercial cooking line Cooking line of a commercial kitchen with ranges and appliances under the hood; appliances as a black box. CMP-KIT-07 Component Dishwashing line Dishwashing installation with in- and outfeed tables and dishwasher for a commercial kitchen; appliances as a black box. CMP-SAN-10 Component Urinal Wall-hung urinal. Axis spacing to neighbouring urinals is in the fixture spacing matrix. CMP-SAN-11 Component Washbasin row Washbasin top with several bowls for public toilets, changing rooms and shower rooms. CMP-SAN-12 Component Shower position Wall-mounted shower position in a row; for shower rooms in sports, workplaces and hospitality. CMP-LAB-01 Component Wall lab bench Lab bench against a wall with services and a sink; sets the laboratory axes. CMP-LAB-02 Component Island lab bench Double-sided lab bench in the room, with services from above or from the floor. CMP-LAB-03 Component Fume cupboard Fume cupboard for work with hazardous substances, with its own exhaust; modelled as a black box. CMP-LAB-04 Component Safety cabinet Fire-resistant, ventilated cabinet for chemicals and hazardous substances. CMP-MED-01 Component Care bed Care bed with the head against a wall, a care zone on both sides and bed transport at the foot. CMP-MED-02 Component Examination couch Couch for examination and treatment, accessible from one long side and the head end. CMP-DOR-05 Component Interior double door Double or leaf-and-a-half interior door for bed transport, goods and large flows of people. CMP-DOR-06 Component Exterior door Door in the façade for the building entrance, a side entrance or access to plant rooms. CMP-DOR-07 Component Gate Sectional or roller gate in the façade for vehicles and goods. CMP-DEV-01 Component Operating table space Operating table with a zone for the surgical team all round; sets the minimum size of the operating theatre. CMP-DEV-02 Component Medical device space Space for a mobile or fixed medical device, for example an anaesthesia or monitoring unit. CMP-DEV-03 Component Imaging device space Space for an X-ray, CT or MR device with its patient table; drives room size, radiation shielding and load. CMP-DEV-04 Component Machine space Space for a production or workshop machine with its operating and service zone. CMP-DEV-05 Component Server rack Rack for servers and network with an operating aisle in front and a service aisle behind. CMP-DEV-06 Component Cooling appliance space Space for a laboratory or medicine fridge and freezer against a wall. CMP-PLT-01 Component Heat generator Boiler or heat pump in the heating plant room with a service zone in front. CMP-PLT-02 Component Storage tank Hot water or buffer tank in the plant room. CMP-PLT-03 Component Chiller Chiller in the cooling plant room with a service zone along its long side. CMP-PLT-04 Component Air handling unit Air handling unit in the ventilation plant room; its service side needs room for filter changes. CMP-PLT-05 Component Pump Pump or pump set, for example for sprinklers, pressure boosting or heating. CMP-PLT-06 Component Main switchboard Main switchboard against a wall with an operating aisle in front. CMP-PLT-07 Component Distribution board Sub-distribution or meter board against a wall, for example in the meter or communications room. CMP-PLT-08 Component Transformer Transformer in the substation with its operating and installation side. CMP-PLT-09 Component Standby generator Standby generator with a service zone all round, supply and exhaust air and flue. CMP-PLT-10 Component UPS unit Uninterruptible power supply with battery cabinet in the electrical or server room. CMP-ELE-01 Component Socket outlet Wall socket outlet for plugging in appliances in the room. CMP-ELE-02 Component Outdoor socket outlet Splash-proof socket outlet with a hinged cover for outdoor spaces. CMP-ELE-03 Component Light switch Wall switch for the room lighting, usually next to the entrance. BMP-STEEL Product class Steel beam Horizontal load-bearing member of steel spanning between supports and carrying floor or roof loads into columns and walls. Fabricated in the workshop and erected as a downstand or upstand girder with bolted or welded connections. CCP-METAL-SHEET Product class Metal sheet ceiling Visible ceiling lining from metal sheets or strips below the load-bearing slab, with a plain or perforated surface. Clipped or screwed onto a suspended metal substructure, with acoustic fleece and insulation laid in the cavity where required. CLP-STEEL Product class Steel column Vertical load-bearing member of steel transferring floor and roof loads to the structure below. Fabricated in the workshop as rolled, welded, or hollow section and erected on site with bolted or welded connections. DCP-WOOD Product class Wood door system Door assembly with a leaf of solid timber or wood-based board in a matching frame, closing an access opening in a wall or partition. FaCP-CERAMIC-VENTILATED Product class Ventilated ceramic tile system Non-load-bearing weather protection layer of ceramic, porcelain, or stoneware tiles and panels set in front of the load-bearing exterior wall. The units are fixed visibly or concealed onto a metal sub-frame so that a continuous ventilated cavity remains between insulation and cladding. FCP-SUBFLOOR Product class Subfloor / leveling layer Load-distributing and levelling layer between the structural slab and the visible floor finish. Placed as a bonded, floating, or heated screed on separation and impact-sound layers, levelled and cured until ready to receive the covering. FDP-RAFT Product class Raft / base slab foundation Continuous load-bearing plate under the building footprint that spreads column, wall, and slab loads evenly into the subsoil. Cast in place on a levelling layer with insulation and sealing beneath, reinforced across the full area and locally thickened under concentrated loads. MTP-ELEC-SOCKET Product class Socket outlet Provides a fixed connection point for supplying electrical power to appliances and equipment at the point of use. Mounted surface or flush in wall, floor, or furniture and connected to a final circuit of the electrical distribution, with earthing and overcurrent protection provided by the supplying board. MUP-ELEC-TRANSFORMER Product class Transformer Converts the incoming medium-voltage supply to the low-voltage level required for building distribution and feeds the main distribution board. RAP-BALUSTER Product class Metal baluster railing Fall protection with vertical metal balusters between posts and handrail, closing the edge of floors, stairs, and balconies. Prefabricated frames are anchored to slab edges, treads, or parapets and finished by galvanizing or coating. RCP-FLAT-BITUMEN Product class Built-up / bitumen flat roof Weatherproofing build-up for flat and low-slope roofs in which several bitumen sheets form the water-bearing layer above the structural deck. The plies are torch-welded or hot-bonded over the insulation with overlapping seams, with separation and protection layers below and above. SFP-CRANE Product class Crane The lifting machine itself, including mast or carrier, jib or boom, cab, and counterweight. The volume it can reach, the ground it stands on, and a cast foundation are separate concepts. SRP-STEEL Product class Steel stair Stair flight of steel for vertical circulation between levels, including landings and fixings to the surrounding structure. Stringers, treads of plate or grating, and landings are prefabricated, lifted into place, and bolted or welded to walls and slabs. SSP-INSITU Product class In-situ concrete slab Load-bearing horizontal element cast in place from reinforced concrete, spanning between walls, beams, or columns. Formwork, reinforcement, and pouring are carried out on site, producing a jointless monolithic plate. SWP-ORTBETON Product class In-situ concrete wall Load-bearing or non-load-bearing wall cast in place from concrete or reinforced concrete. Formwork, reinforcement, and pouring are carried out on site, producing jointless monolithic wall panels. WCP-SEAMLESS-COATING Product class Seamless wall coating Visible interior wall finish from a jointless mineral or synthetic coating on a prepared substrate of plaster, concrete, or board. Applied wet in one or more coats and troweled or sprayed to the required surface quality, including primer and levelling layers. WICP-WOOD Product class Wood window system Window unit with frame and sash from solid or laminated timber, closing a wall or roof opening with an insulating glazing infill. Delivered as a factory-glazed and pre-finished unit, set into the reveal, fixed and sealed against the adjoining construction on the inside and the outside. BMP-TIMBER Product class Timber beam Horizontal load-bearing member of solid, glued laminated, or engineered timber spanning between supports. Prefabricated to length and connected on site with steel fasteners and beam hangers. CCP-GYPSUM-BOARD Product class Gypsum board ceiling Closed, jointless-looking ceiling surface from gypsum boards, either fixed directly to the slab or suspended in front of it. Screwed onto a metal or timber substructure, with taped and filled joints ready for painting, and with access panels where services must remain reachable. CLP-TIMBER Product class Timber column Vertical load-bearing member of solid, glued laminated, or engineered timber transferring floor and roof loads downwards. Prefabricated to length and erected dry on site with steel connectors. DCP-METAL Product class Metal door system Door assembly with leaf and frame of steel or other metal, usually a sheet-metal shell with an insulating or stiffening core, closing an access opening. FaCP-NATURAL-STONE-VENTILATED Product class Ventilated natural stone cladding Non-load-bearing cladding of natural stone slabs or stone-faced cassettes carried in front of the load-bearing exterior wall. The slabs are held by undercut or dowel anchors on an adjustable, thermally separated metal sub-frame, with insulation and ventilated cavity behind the stone. FCP-SEAMLESS-RESIN Product class Seamless resin floor Jointless wearing surface applied in liquid form onto a prepared screed and cured in place. Primer, resin coats, and optional aggregate broadcast or sealer are rolled, poured, or troweled and continue without joints into coving at the walls. FDP-STRIP Product class Strip footing foundation Continuous footing running below load-bearing walls or lines of columns, spreading linear loads onto a wider bearing area in the soil. Excavated as a trench down to frost-free depth and cast in place in reinforced or plain concrete, with starter bars for the wall above. MTP-ELEC-LIGHT Product class Light fixture Converts electrical power into light and delivers the illuminance and light quality required for the activities in the space. Mounted surface, recessed, suspended, or on a track and connected to a lighting circuit, with control by switches, dimmers, or presence and daylight sensors. MUP-ELEC-MAIN-DIST-BOARD Product class Main distribution board Receives the incoming supply and distributes it to sub-distribution boards and main loads, providing the protection, switching, isolation, and metering points at building or site entry. RAP-GLASS-FRAMED Product class Framed laminated glass railing Fall protection with laminated safety glass infill held in a metal frame or clamping channel. Panes are cut to size in the factory and glazed into the frame, which is anchored to the slab edge or parapet. RCP-FLAT-SINGLE-PLY Product class Single-ply membrane flat roof Weatherproofing build-up for flat and low-slope roofs in which a single synthetic sheet forms the water-bearing layer above the insulation. The membrane is loose-laid and ballasted, mechanically fixed, or fully adhered, with seams hot-air welded or taped into a continuous skin. SFP-CRANE-SWING Product class Crane swing envelope Operational envelope of a crane: jib or boom radius, slewing sector, and hook height. Logistics and safety workflows test what the crane covers, independent of the machine that produces the envelope. SRP-TIMBER Product class Timber stair Stair flight of solid or engineered timber for vertical circulation between levels. Stringers, treads, and risers are prefabricated in the workshop, fitted on site, and finished with a surface treatment. SSP-PREFAB-CONC Product class Prefabricated concrete slab Load-bearing horizontal element assembled from factory-made concrete units such as hollow-core, double-tee, or flat slab elements. Elements are delivered ready to install, set on the supporting structure, and joined with grouted joints or a structural concrete topping. SWP-MASONRY Product class Masonry wall Load-bearing or non-load-bearing wall laid on site from brick, block, or natural stone units in mortar. Includes monolithic insulating block systems that combine structure and thermal insulation in a single layer. WCP-WALLPAPER Product class Wallpaper Thin decorative interior wall covering from paper, non-woven, or vinyl roll goods on a smooth, filled substrate. Adhered over the full surface in strips with butt or overlapping joints, including substrate preparation and lining paper where required. WICP-WOOD-METAL Product class Wood - metal composite window Window unit with a timber frame on the room side and a metal cover shell on the weather side, closing a facade opening with an insulating glazing infill. Frame and cover profiles are combined and glazed in the factory, then set into the reveal, anchored and sealed against the adjoining construction. BMP-RC Product class Reinforced concrete beam Horizontal load-bearing member of reinforced concrete acting as downstand or upstand beam within a concrete floor structure. Cast in place with formwork and reinforcement, or set as a precast element and connected monolithically. CCP-MINERAL-FIBRE Product class Mineral-fibre acoustic ceiling Sound-absorbing ceiling lining from mineral-fibre tiles or boards below the load-bearing slab. Laid into or clipped onto a suspended grid or rail substructure as demountable panels, with edge profiles and cut-outs for luminaires and air outlets. CLP-RC Product class Reinforced concrete column Vertical load-bearing member of reinforced concrete transferring floor and roof loads to the foundation. Either cast in place with formwork and reinforcement or delivered as a precast element and grouted into position. DCP-WOOD-METAL Product class Wood - metal composite door Door assembly with timber leaf and frame on the room side and a metal cover shell or metal-faced composite profile on the weather side, closing an access opening in the building envelope. FaCP-METAL-SHEET-STANDING-SEAM Product class Metal sheet standing-seam facade Non-load-bearing metal skin of profiled sheet or standing-seam bands in aluminium, steel, copper, or zinc in front of the exterior wall. The bands are seamed or clipped onto a ventilated timber or metal sub-frame using sliding clips that accommodate thermal movement. FCP-CARPET Product class Textile carpet Textile wearing surface on a prepared screed or subfloor, delivering a soft, sound-absorbing walking surface. Supplied as broadloom or tiles and fully adhered, tackified, or loose-laid on the levelled substrate, with seams and edge profiles closed. FDP-PAD Product class Pad / isolated footing Isolated footing beneath a single column or concentrated load point that spreads the point load onto a sufficient bearing area. Formed and cast in place as a reinforced concrete block, often stepped or tapered, with anchors or starter bars for the column connection. MTP-ELEC-SWITCH Product class Switch Allows users to switch or dim lighting and power circuits locally in the served space. Mounted surface or flush in the wall at a defined height and wired into the circuit or connected as a control input to the building automation. MUP-ELEC-SUB-DIST-BOARD Product class Sub-distribution board Distributes power within a floor, zone, or tenancy and provides protection and switching for the final circuits it serves. RAP-GLASS-POINT Product class Point-fixed structural glass railing Fall protection as an all-glass balustrade in which the laminated safety glass panes are themselves the load-bearing element, without vertical posts. Panes are set on point fixings or clamped in a base channel anchored to the slab edge, with a top rail where required. RCP-FLAT-LIQUID Product class Liquid-applied flat roof Seamless weatherproofing layer for flat and low-slope roofs, applied in liquid form onto the prepared substrate and cured in place. Resin is rolled, brushed, or sprayed in several coats, usually with an embedded reinforcing fleece, and continues without joints over upstands and penetrations. SFP-CRANE-PAD Product class Crane set-up pad Temporary bearing surface a mobile or crawler crane stands on, including outrigger pads and load-spreading. Checked for ground bearing. SRP-RC Product class Reinforced concrete stair Stair flight of reinforced concrete for vertical circulation, usually part of the fire-separated escape route. Cast in place with formwork and reinforcement or delivered as a precast flight and set on acoustic bearings that interrupt structure-borne sound. SSP-STEEL-COMPOSITE Product class Steel deck / composite slab Load-bearing horizontal element in which profiled steel decking or steel beams act together with a concrete slab. The steel deck is laid as permanent formwork on the steel frame and connected by shear studs to the concrete cast on top. SWP-RAMMED-EARTH Product class Rammed earth wall Load-bearing or non-load-bearing wall from compacted, untreated earth material placed in formwork. Solid, monolithic construction without additional cladding. WCP-NATURAL-STONE Product class Natural stone wall cladding Hard-wearing interior wall cladding from natural stone slabs or tiles on a load-bearing wall or lining. Set in adhesive or mortar for thin formats, or mechanically anchored with a cavity for large and heavy slabs, including jointing and edge details. WICP-PVC Product class Plastic / PVC window system Window unit with multi-chamber plastic frame and sash profiles and an insulating glazing infill, closing a wall opening. Profiles are welded and internally reinforced in the factory, glazed and fitted with hardware, then set into the reveal, anchored and sealed on both faces. BMP-OTH Product class Other or unknown beam Placeholder for beams whose material or product type is not yet fixed at tender stage, and for composite or masonry beams outside the listed types. Span, loads, and required fire resistance must be stated separately. CCP-WOOD Product class Wood ceiling lining Visible ceiling lining from solid wood or wood-based panels, boards, or slats below the load-bearing slab. Mechanically fixed on battens or a suspended substructure, with visible or concealed fastenings and acoustic fleece behind perforated or slatted surfaces. CLP-OTH Product class Other or unknown column Placeholder for columns whose material or product type is not yet fixed at tender stage, and for composite or masonry columns outside the listed types. Structural function, loads, and required fire resistance must be stated separately. DCP-PVC Product class Plastic / PVC door system Door assembly with plastic frame and leaf profiles, usually multi-chamber sections with internal reinforcement and a panel or glazed infill, closing an access opening. FaCP-METAL-COMPOSITE-PANEL Product class Metal composite facade panel (ACP) Non-load-bearing facade skin of factory-made sandwich panels with metal faces and a bonded core, hung in front of the insulated exterior wall. The panels are folded into cassettes or trays and mechanically fixed to an aligned metal sub-frame, with defined joints and cavity ventilation. FCP-LVT Product class Vinyl / LVT floor Resilient wearing surface from vinyl sheet or tile on a prepared screed, delivering a hard-wearing and easily cleaned walking surface. Laid fully adhered or as a click system floating on the levelled substrate, with seams welded or sealed where watertightness is required. FDP-PILE Product class Driven / bored pile foundation Deep foundation that carries building loads through weak upper soil layers into load-bearing strata by skin friction and end bearing. Piles are driven as precast units or bored and concreted in place, then tied together by pile caps or ground beams that receive the structure above. MTP-DATA-DATA-OUTLET Product class Data outlet Provides the user-side connection point of the structured cabling and makes network and telecom services available in the space. Mounted surface or flush in wall, floor tank, or furniture and terminated on horizontal cabling running back to the floor distributor, with every port individually identified. MUP-ELEC-UPS Product class Uninterruptible power supply Bridges supply interruptions and voltage disturbances for critical loads by switching over to stored energy without interruption. RAP-PERFORATED-METAL Product class Perforated or expanded metal railing Fall protection with perforated sheet or expanded metal infill panels in a metal frame. The prefabricated panels are set into the frame, which is anchored to the slab edge or parapet and then galvanized or coated. RCP-METAL-SHEET Product class Metal sheet roof Weatherproof outer roof skin from formed metal sheet, fixed on battens, purlins, or boarding above a separation and ventilation layer. Panels are joined by standing seams, clips, or profiled overlaps that allow thermal movement, with flashings at eaves, verges, and penetrations. SFP-CRANE-FOUNDATION Product class Crane foundation Cast or precast base that holds a tower crane, with anchors or a central ballast block. Removed or left according to the dismantling concept. SRP-OTH Product class Other or unknown stair Placeholder for stairs whose material or product type is not yet fixed at tender stage, and for stone or composite stairs outside the listed types. Geometry, use, and fire and acoustic requirements must be stated separately. SSP-TIMBER Product class Timber slab / deck Load-bearing horizontal element with a primary structure of timber joists, ribs, or wood-based panels, usually with sheathing and a separating floor build-up above. Prefabricated as joist or rib-deck modules, set on walls or beams on site, and completed with acoustic layers and ballast fill. SWP-BLT Product class Lightweight concrete panel (BLT) wall Load-bearing or non-load-bearing wall from prefabricated lightweight-concrete blocks or storey-height panels. Factory-produced and set in place on site, with lower dead load than normal-weight concrete. WCP-ARTIFICIAL-STONE Product class Artificial stone wall cladding Interior wall cladding from engineered or agglomerate stone slabs with an industrially produced, uniform appearance. Adhered to a levelled substrate or mechanically fixed for large formats, with narrow joints and prefabricated cut-outs and edge profiles. WICP-STEEL Product class Steel window system Window unit with slender steel frame and sash profiles and a glazed infill, closing an opening in a wall or partition. Profiles are welded or screwed into frames in the workshop, coated, glazed and fitted with hardware, then anchored in the opening and sealed against the adjoining construction. CCP-SYNTHETIC Product class Synthetic ceiling lining Lightweight ceiling lining from plastic, textile, or synthetic panels or a tensioned membrane below the load-bearing slab. Stretched into perimeter edge profiles or fixed onto a light suspended substructure, with sealed penetrations for luminaires and air outlets. DCP-GLASS Product class Glazed door system Door assembly whose leaf consists mainly of glass, either frameless with clamped fittings or in a narrow metal frame, operating as a hinged, sliding, or automatic leaf within a glazed screen. FaCP-TIMBER-VENTILATED Product class Timber ventilated facade system Non-load-bearing timber cladding of boards, slats, or wood-based panels mounted in front of the insulated exterior wall. Fixing is by visible or concealed fasteners onto a battened sub-frame that ensures rear ventilation and all-round drying of the cladding. FCP-LINOLIUM Product class Linoleum Resilient wearing surface from linoleum on a prepared screed, delivering a hard-wearing walking surface from largely renewable raw materials. Laid as sheet or tile fully adhered onto the levelled substrate, with welded or sealed seams and matching skirting details. FDP-MICRO-PILE Product class Micropile / ground improvement Small-diameter pile or soil treatment that raises the bearing capacity of the ground or transfers loads on sites with restricted access. Installed with small drilling rigs using grouted steel tendons, injections, or soil replacement, where necessary working from inside existing buildings. MTP-DATA-WIFI-AP Product class WiFi access point Provides wireless network coverage in the served space and links mobile devices to the cabled network. Mounted on ceiling or wall, normally fed by a single data cable that also carries the power supply, and managed centrally by a controller. MUP-ELEC-GENERATOR Product class Backup generator Generates electricity on site when the mains supply fails and feeds safety and selected standby loads until normal supply returns. RAP-CABLE-MESH Product class Cable or mesh infill railing Fall protection with tensioned stainless steel cables or woven mesh infill spanning between posts. Posts are anchored to the structure and the infill is tensioned against them on site, so the posts must be designed for the tension forces. RCP-TILE-CLAY Product class Clay tile roof Outer roof skin from small-format fired clay units laid in overlapping courses as the rain-shedding surface of a pitched roof. Tiles are hung on battens above counter-battens and an underlay that drains incidental water, and are individually fixed or clipped in exposed areas. SFP-CONTAINER Product class Site container Standard site container placed for temporary use. Use a more specific concept when the function is known: office, break room, sanitary facility, or lockable store. SSP-CLT Product class Cross-laminated timber (CLT) slab Load-bearing horizontal element formed by solid mass timber plates that span in one or two directions. Plates are cut to size in the factory including openings and service routes, lifted into position, and screwed along the panel joints. SWP-PREFAB-CONC Product class Prefabricated concrete wall Load-bearing or non-load-bearing wall from prefabricated concrete elements. Factory-produced, erected and connected on site. WCP-CERAMIC-TILE Product class Ceramic / porcelain wall tile Water-resistant interior wall finish from ceramic, porcelain, or earthenware tiles on a plastered, board, or concrete substrate. Bedded in thin-bed adhesive and grouted, with a bonded sealing layer, movement joints, and sealed connections in wet zones. WICP-ALUMINIUM Product class Aluminium window system Window unit with thermally separated aluminium frame and sash profiles and an insulating glazing infill, closing a facade opening. Profiles are cut, joined, and glazed in the factory, then set into the reveal, anchored to the structure and sealed against the adjoining construction. CCP-METAL-PANEL Product class Metal panel ceiling Ceiling system from linear metal panels or lamellas below the load-bearing slab, with plain or perforated faces and open or closed joints. Clipped onto carrier rails of a suspended substructure, individually demountable, with acoustic fleece and insulation in the cavity where required. DCP-GATE Product class Gate / industrial door Large-format closure of a vehicle or goods opening, as a sectional, rolling, sliding, folding, or up-and-over leaf with guide tracks and a weight compensation system. FaCP-FIBER-CEMENT-BOARD Product class Fibre-cement board facade Non-load-bearing mineral board cladding of fibre-cement or reinforced cement panels in front of the insulated exterior wall. The boards are cut to size and riveted, screwed, or concealed-fixed to a metal or timber sub-frame with a ventilated cavity and a defined joint pattern. FCP-NATURAL-STONE Product class Natural stone flooring Wearing surface from quarried stone slabs or tiles on a prepared substrate, delivering a heavy and highly durable walking surface. Laid in a mortar bed or thin-bed adhesive on the screed, jointed, and finished by grinding, honing, or sealing. FDP-RETAINING Product class Basement / retaining foundation wall Below-grade wall that carries vertical building loads and at the same time resists earth and water pressure from the surrounding ground. Built as in-situ reinforced concrete, prefabricated elements, or an excavation-support wall left in place, completed on the earth side with sealing, insulation, and drainage. MTP-DATA-SENSOR-ACTUATOR Product class Sensor / actuator (KNX / BACnet) Captures room conditions or user input and converts automation commands into switching or positioning action on the served equipment. MUP-DATA-PATCH-PANEL Product class Patch panel Terminates the structured cabling of a distribution area and allows individual links to be cross-connected to active equipment with patch cords. RAP-TIMBER Product class Timber railing Fall protection with posts, rails, and infill of timber, forming the guarding element at floors, stairs, and balconies. Prefabricated timber parts are fixed to the structure with steel connectors and given a surface treatment matched to the exposure. RCP-TILE-CONCRETE Product class Concrete tile roof Outer roof skin from small-format concrete or fibre-cement units laid in overlapping courses on a pitched roof. Units are hung on battens above counter-battens and an underlay and are fixed or clipped where wind uplift requires it. SFP-WHEEL-WASH Product class Wheel wash Installation that cleans vehicle tyres and chassis before they leave the site, so public roads stay free of mud. Includes the basin or spray frame, water feed, and sludge collection at the exit. SSP-HBV Product class Timber - concrete composite slab (HBV) Load-bearing horizontal element combining a timber plate or rib structure with a concrete topping that takes the compression forces. Both layers are joined shear-resistant by notches, screws, or connectors, with the concrete cast on site or supplied as a prefabricated composite element. SWP-STEEL Product class Steel frame wall Load-bearing or non-load-bearing wall with a primary steel structure of sections or studs and sheathing or infill layers. Prefabricated frames are erected on site, with insulation and lining added layer by layer. WCP-WOOD-PANEL Product class Wood wall panel Interior wall cladding from solid wood or wood-based panels, boards, or slats in front of the load-bearing wall. Mechanically fixed on battens or a substructure, with a cavity for insulation, acoustic backing, or services, and with visible or concealed fastenings. WICP-SPECIAL Product class Special transparent opening Light-transmitting opening product that closes an opening without a conventional frame and sash, for example a glass block field, a translucent panel field, a fixed light, or a glazed hatch. CCP-METAL-GRID Product class Metal grid ceiling Suspended ceiling from a visible metal grid with removable lay-in tiles or open grid cells below the load-bearing slab. Grid profiles are hung from the slab on adjustable hangers, and tiles are laid in without fixings so that every field can be removed individually. DCP-SPECIAL Product class Special door system Purpose-made door product for an access opening with requirements beyond a standard leaf and frame, for example a revolving entrance, an airtight or pressure-resistant door, a high-performance acoustic door, a shielding door, or a shopfront entrance assembly. FaCP-RENDER-ETICS-WDVS Product class Render / ETICS facade system Non-load-bearing bonded external insulation and render system applied directly onto the load-bearing exterior wall without a ventilated cavity. Insulation boards are adhesive-bonded and mechanically anchored to the substrate and then covered with a reinforced base coat with embedded mesh and a finishing render. FCP-ARTIFICIAL-STONE Product class Artificial stone flooring Wearing surface from cast or agglomerate stone slabs and tiles on a prepared substrate, delivering a stone-like walking surface with consistent format and appearance. Laid in a mortar bed or thin-bed adhesive, jointed, and ground or sealed on site where required. FDP-WATERPROOF Product class Foundation waterproofing / tanking Sealing system that keeps ground moisture, seeping water, and pressing water away from the buried parts of the building. Executed either as a bonded or loose-laid membrane on slab and wall surfaces or as watertight concrete construction with sealed joints and penetrations. MTP-VENT-AIR-VALVE Product class Supply / extract air valve or diffuser Delivers supply air to the room or removes extract air from it and distributes the air flow so that draught-free conditions and the required air quality are achieved. MUP-DATA-NETWORK-SWITCH Product class Network switch / rack Forwards data traffic between the connected end devices and the network backbone and, where required, supplies terminal devices with power over the same cabling. RAP-PARAPET-SOLID Product class Solid parapet Fall protection formed by a solid concrete or masonry parapet with a coping, taking over the guarding function without a separate railing. Built together with the surrounding structure as cast-in-place concrete, precast element, or masonry, and closed on top by a coping that sheds water. RCP-SLATE Product class Natural slate roof Outer roof skin from split natural stone plates laid in overlapping courses as the rain-shedding surface of a pitched roof. Slates are nailed or hooked onto boarding or battens over an underlay, with course pattern and headlap set by pitch and exposure. SFP-FENCE Product class Site fence Hoarding or mesh fence on temporary posts that marks the site boundary, controls access, and screens the works. Gates in the fence are a separate concept. SSP-HOLZ-LEHM Product class Timber - clay slab / deck Load-bearing horizontal element with timber joists or a timber frame and a heavy clay infill or topping between or above the timber members. Produced as prefabricated panels or filled on site, with the moist clay compacted and dried before the floor build-up follows. SWP-TIMBER Product class Timber frame wall Load-bearing or non-load-bearing wall with a primary structure of solid timber, glued laminated timber, or engineered wood panels. Prefabricated as frame, stud, or solid timber elements and assembled on site. WCP-TEXTILE Product class Textile wall covering Soft interior wall covering from textile or fabric surfaces, usually with a sound-absorbing backing layer. Either adhered to the substrate over the full surface or stretched into edge profiles as a fabric-covered element on a substructure. WICP-SKYLIGHT Product class Roof window / skylight Glazed opening element set into a roof surface, as a pitched roof window, flat-roof dome, or rooflight band with fixed or operable leaves. Delivered as a factory-glazed unit and mounted on an upstand kerb or in the rafter field, connected to the roof waterproofing and vapour barrier with collars and metal flashings. CCP-OTH Product class Other / unknown ceiling covering Placeholder for ceiling coverings whose product type is not yet fixed or not classified at tender stage. Functional requirements on suspension height, access to services in the ceiling void, room acoustics, fire behaviour, and cleanability must be stated separately. DCP-OTH Product class Other / unknown door Placeholder for door products whose material, system, and operating type are not yet fixed or not classified at tender stage. Functional requirements for access, operation, separating duty, and connection to the adjoining construction must be stated separately. FaCP-SYNTHETIC-VENTILATED Product class Synthetic ventilated facade panel Non-load-bearing cladding of synthetic panels such as laminates, plastics, or fibre-reinforced composites hung in front of the insulated exterior wall. FCP-CERAMIC-TILE Product class Ceramic / porcelain tile floor Wearing surface from fired ceramic tiles on a prepared substrate, delivering a hard, water-resistant, and abrasion-resistant walking surface. Set in thin-bed adhesive on the screed, with grouted joints, movement joints, and a bonded waterproofing layer in wet areas. FDP-DRAINAGE Product class Foundation drainage and protection System that collects and leads away water from the ground around the foundation and protects the sealing from mechanical damage. Comprises perforated drain pipes in a filter-stable gravel bed, protection and filter layers or drainage composites on the wall, and inspection and discharge points. MTP-VENT-GRILLE Product class Grille Lets air pass between rooms or between room and duct without active regulation and secures the intended air path for ventilation and pressure balance. Fitted into a wall, door, ceiling, or duct opening as a fixed grille or linear slot, without moving control elements. MUP-DATA-SERVER Product class Server Provides computing and storage capacity for building-related applications such as automation, access control, or media services. Delivered as rack-mounted hardware in a communications or server room with secured power supply, network connection, and cooling, and commissioned together with the applications it hosts. RAP-HANDRAIL Product class Handrail only Handrail without infill, giving guidance and support along stairs, ramps, and corridors where no fall protection infill is required. Mounted on brackets to the wall or on posts, with a continuously graspable profile and ends returned to the wall. RCP-WOOD-SHINGLE Product class Wood shingle / shake roof Outer roof skin from sawn or split timber shingles, shakes, or boards laid in overlapping courses on a pitched roof. Shingles are nailed onto open battens or boarding over a rear-ventilated cavity so that the covering can dry out on both faces. SFP-GATE Product class Gate Opening in the site enclosure for vehicles or people, including sliding, swing, or barrier gates, with the locking that belongs to the gate itself. SSP-LIGHTWEIGHT Product class Lightweight slab system Horizontal deck or platform with a light, non-monolithic primary structure of profiles, ribs, or panels carrying limited loads. Assembled on site from prefabricated parts and fixed to the supporting structure, normally without a heavy topping. SWP-LEICHTBAU Product class Lightweight construction wall Non-load-bearing or lightly loaded wall from a framed or panelised lightweight structure with insulation and sheathing on one or both sides. Built up on site from individual parts rather than monolithically. WCP-SYNTHETIC-PANEL Product class Synthetic wall panel Robust interior wall cladding from plastic, laminate, or composite panels with a closed, impact-resistant surface. Adhered to a levelled substrate or mechanically fixed on a substructure, with sealed or profiled joints and protective edge and corner details. WICP-FACADE-UNIT Product class Facade glazing unit Glazed field of a facade system that acts as the window opening, with fixed panes and integrated opening lights or ventilation flaps within a mullion-transom or unitised grid. FaCP-BIPV-INTEGRATED Product class Building-integrated photovoltaic facade Non-load-bearing facade cladding that additionally generates electricity, with photovoltaic cells integrated into the visible outer layer of the wall build-up. FCP-PARQUET Product class Parquet / engineered wood floor Wearing surface from solid or multi-layer timber elements on a prepared substrate, delivering a warm walking surface with a renewable wear layer. Laid fully adhered, nailed, or floating on the screed, then sanded and sealed or oiled on site. FDP-OTH Product class Other / unknown foundation Placeholder for foundation products whose system is not yet fixed or not classified at tender stage. Functional requirements such as bearing capacity, settlement limits, groundwater conditions, and sealing must be stated separately. MTP-HEAT-RADIATOR Product class Radiator Transfers heat from the heating water into the room by radiation and convection and covers the heat loss of the space. Mounted on the wall or in a floor channel, usually below windows, and connected to flow and return of the heating distribution with shut-off, drain, and a thermostatic control valve. MUP-VENT-AHU Product class Air handling unit / monoblock Conditions outdoor and extract air for a ventilation zone by filtering, heat recovery, heating, cooling, and where required humidity treatment, and moves the supply and extract air volumes. RAP-OTH Product class Other or unknown railing Placeholder for railings whose product type is not yet fixed at tender stage, and for special guarding systems outside the listed types. Guarding function, horizontal loads, and infill requirements must be stated separately. RCP-GREEN-EXTENSIVE Product class Extensive green roof Vegetated covering build-up above a waterproofed flat or low-slope deck, in which a thin substrate layer carries drought-tolerant planting. Root barrier, drainage and filter layers, substrate, and vegetation are laid loose on the membrane and act at the same time as its protection and ballast. SFP-CANOPY Product class Protective canopy Covered walkway along the public side of the site, with a deck that catches debris and a clear passage underneath. It is not a work scaffold and not the site fence. SSP-OTH Product class Other / unknown slab separator Placeholder for slab products whose construction type is not yet fixed or not classified at tender stage. Functional requirements such as span, imposed load, fire resistance, and acoustic performance must be stated separately. SWP-CURTAIN-WALL Product class Curtain wall / facade system Non-load-bearing exterior wall enclosure as a self-supporting system in front of the building structure, with glazed and/or panel infill fields. Carries its own vertical loads and transfers wind loads into the building structure. WCP-PAINT Product class Interior paint finish Thin-layer visible interior wall finish from paint or coating on plaster, board, or concrete substrates. Applied wet by brush, roller, or spray in primer and finish coats, including substrate preparation, filling, and sanding to the agreed surface quality. WICP-OTH Product class Other / unknown window Placeholder for window products whose frame material, system, and opening type are not yet fixed or not classified at tender stage. Functional requirements for the opening, the glazing, the operation, and the connection to the adjoining construction must be stated separately. FaCP-PREFAB-MODULAR-TIMBER Product class Prefabricated modular timber facade system Non-load-bearing facade module manufactured in the factory as a timber-framed element with insulation, air-tight layer, cladding, and often windows already fitted. FCP-LAMINATE Product class Laminate flooring Wearing surface from board elements with a printed, resin-impregnated decorative top layer on a wood-based core. Laid floating with click joints on an impact-sound and separation underlay over the screed, with perimeter expansion gaps and skirtings. MTP-HEAT-UFH-MANIFOLD Product class Underfloor heating manifold Distributes heating water to the individual loops of a surface heating system and returns it to the distribution, so that every loop can be shut off and balanced separately. MUP-VENT-FAN Product class Fan Moves supply, extract, or transfer air through a duct or shaft section and overcomes its flow resistance so that the required air volume is maintained. RCP-GREEN-INTENSIVE Product class Intensive green roof Vegetated and usable covering build-up above a waterproofed deck, with a deep substrate layer that carries lawn, shrubs, or trees. Root barrier, drainage and water-storage layers, substrate, planting, and paths or terraces are built up on the membrane, usually with irrigation. SFP-STORAGE Product class Storage area Marked outdoor surface, or a covered but open bay, for pallets, formwork, reinforcement, and similar bulk material. Not a room and not a container. SWP-ELEMENT-WALL Product class Drywall / element partition wall Non-load-bearing interior wall from drywall, stud-framed, or modular element systems with metal or timber studs and board sheathing. Assembled on site from prefabricated parts, with cavity insulation and integrated services where required. WCP-OTH Product class Other / unknown wall covering Placeholder for interior wall coverings whose product type is not yet fixed or not classified at tender stage. Functional requirements on surface quality, mechanical loading, moisture behaviour, acoustics, and fire behaviour must be stated separately. FaCP-PREFAB-MODULAR-METAL Product class Prefabricated modular metal facade system Non-load-bearing facade module assembled in the factory from metal frames with integrated insulation and a finished cladding face. The units are set storey-high in front of the primary structure and anchored on brackets that allow adjustment and thermal separation, with gasketed or sealed joints between modules. FCP-RAISED-FLOOR Product class Raised / access floor Elevated floor construction that forms a continuous accessible cavity between the structural slab and the walking level. Removable panels rest on height-adjustable pedestals or on a self-supporting cavity build-up and carry the final finish, applied in the factory or laid separately. MTP-HEAT-FAN-COIL Product class Fan coil (heating mode) Heats room air by drawing it with a fan over a heat exchanger fed from the heating distribution and returning it to the space, so that heat loads are covered with a short response time. MUP-HEAT-BOILER Product class Boiler Generates heat for space heating or process use and transfers it to the heating circuit at the required flow temperature and flow rate. RCP-PV-ROOF Product class Roof-mounted photovoltaic system Electricity-generating module array carried by the roof surface, either mounted on a frame above the existing covering or replacing it as the weatherproof layer. SFP-STORE Product class Site store Enclosed and lockable room or fitted container used as the site magazine. Distinct from an open storage yard and from a container whose function is not specified. SWP-OTH Product class Other / unknown wall separator Placeholder for wall products whose construction type is not yet fixed or not classified at tender stage. Functional requirements must be stated separately. FaCP-EXTERIOR-PAINT-COATING Product class Exterior paint / protective coating finish Non-load-bearing coating applied thinly and directly onto the facade substrate, acting as protective and decorative surface rather than as a separate cladding layer. FCP-OTH Product class Other / unknown floor covering Placeholder for floor covering products whose system type is not yet fixed or not classified at tender stage. Functional requirements such as wear class, slip resistance, impact-sound reduction, moisture exposure, and cleanability must be stated separately. MTP-COOL-FAN-COIL Product class Fan coil (cooling mode) Cools and dehumidifies room air by drawing it with a fan over a chilled-water or direct-expansion coil and returning it to the space, covering internal and solar cooling loads. MUP-HEAT-HEAT-PUMP Product class Heat pump Raises heat taken from air, ground, water, or waste heat to a usable temperature for the heating circuit and, in reversible operation, also supplies cooling. RCP-OTH Product class Other / unknown roof covering Placeholder for roof covering products whose system type is not yet fixed or not classified at tender stage. Functional requirements such as watertightness, admissible roof pitch, thermal performance, walkability, and fire behaviour must be stated separately. SFP-TRANSFER Product class Transfer area Designated handling point for unloading, reloading, and short-term set-down between transport and the place of use. Includes the space the handling equipment needs, not the storage yard itself. FaCP-RETROFIT-OVERCLADDING Product class Retrofit overcladding system (composite) Non-load-bearing overlay built over a retained existing facade, adding insulation and a new weather-protecting surface without removing the old wall. MTP-COOL-CHILLED-CEILING Product class Chilled ceiling / beam Removes heat from the room through cooled surfaces at ceiling level, largely without noise and draught, working purely by radiation and convection or supported by primary air. MUP-HEAT-DISTRICT-HEAT-SUBSTATION Product class District heat substation Transfers heat from the external supply network to the building heating and hot water circuits, separates the primary and secondary sides hydraulically, and controls the secondary flow temperature. SFP-BUFFER Product class Intermediate storage Marked area where delivered material waits before it is installed or moved on. It is not the open storage yard, not the lockable store, and not the point where vehicles are unloaded. FaCP-HPL-PANEL Product class HPL / compact laminate facade panel Non-load-bearing rainscreen cladding of compact high-pressure laminate boards in front of the insulated exterior wall. The boards are fixed with visible rivets or screws, or with concealed rear fixings, to a metal or timber sub-frame that keeps an open ventilated cavity and permits panel movement. MTP-FW-TAP Product class Tap / faucet Delivers drinking water at the draw-off point in the required quantity and temperature and lets users open, close, and mix the flow. Mounted on the sanitary fixture, on the wall, or on the worktop and connected to cold and hot water pipework with shut-off and, where required, backflow protection. MUP-COOL-CHILLER Product class Chiller Removes heat from the chilled water or refrigerant circuit and rejects it to the ambient air or a recooling circuit, holding the supply temperature required by the cooling consumers. SFP-OFFICE Product class Site office Container or temporary building fitted as an office, with workstations, meeting space, and document storage for the site team. Not a break room and not sanitary accommodation. FaCP-BRICK-SLIP Product class Brick slip / tile-hung ventilated facade Non-load-bearing cladding with a masonry appearance from thin brick slips or small-format tiles in front of the insulated exterior wall, without any load transfer from the building. MTP-FW-SHOWER Product class Shower Delivers mixed warm water as a spray for body cleaning and lets users set temperature and flow at the point of use. Mounted on wall or ceiling as an exposed or concealed set and connected to cold and hot water pipework and to the shower waste, with a mixer and protection against scalding. MUP-COOL-FREE-COOLER Product class Free cooler Rejects heat from a water circuit directly to the outdoor air and supplies cooling without mechanical refrigeration whenever outdoor conditions allow, or serves as recooler for a chiller. SFP-BREAK-ROOM Product class Break room Furnished rest space for workers, with seating and a place to eat. It is neither the site office nor the sanitary unit. FaCP-OTHER Product class Other / unknown facade covering Placeholder for facade coverings whose product or system type is not yet fixed at tender stage or cannot be classified. Functional requirements such as weather protection, thermal performance, reaction to fire, substrate and fixing principle, and expected service life must be stated separately in the specification. MTP-FW-WC-FLUSH Product class WC flush valve Releases a measured volume of water to rinse the WC pan and refills the cistern or flush line after every operation. MUP-FW-PRESSURE-BOOSTER Product class Pressure booster Raises the pressure of the potable water supply so that the required flow pressure is available at all consumers, including upper floors and remote draw-off points. SFP-SANITARY Product class Sanitary facility Sanitary containers or cabins with WC, washbasins, and where required showers, connected to site water and drainage. Not a break room and not an office. MTP-WW-FLOOR-DRAIN Product class Floor drain Collects water from the floor surface and discharges it into the waste water pipework, so that the floor stays free of standing water. Set into the floor build-up flush with the finished surface and connected to the waste branch with a water trap and a sealed connection to the floor waterproofing. MUP-FW-WATER-HEATER Product class Water heater / DHW boiler Heats potable water to the required temperature and holds a reserve so that peak draw-off demand is covered at the taps. SFP-HAUL-ROAD Product class Haul road Built-up or paved route that carries delivery and site vehicles between the entrance, storage, and the works. Turning places and ramps are separate concepts. MTP-WW-WC-OUTLET Product class WC outlet Takes the discharge from the WC pan into the waste water pipework and seals the joint between fixture and pipe against water and odour. Formed as a horizontal or vertical connection through wall or floor, with a connector bend or sleeve fitted to the fixture outlet and aligned with the fixed pipe position. MUP-WW-LIFTING-STATION Product class Lifting station Collects wastewater from drainage points below the backflow level and pumps it above that level into the gravity drain. SFP-RAMP Product class Ramp Inclined temporary structure or earth ramp that lets vehicles or people change level, for example into an excavation or up to a loading point. Not a haul road and not a turning area. MTP-WW-SINK-DRAIN Product class Sink drain Drains used water from a sink, basin, or appliance into the waste water pipework and keeps odour from entering the room. Fitted to the fixture outlet with a waste set and water trap and connected to the waste branch, with an additional connection for appliance hoses where required. MUP-WW-GREASE-SEPARATOR Product class Grease separator Retains grease and oil carried in kitchen or process wastewater before discharge into the public sewer and thereby protects downstream pipes and plant from deposits. SFP-TURNING Product class Turning area Paved or reinforced surface whose geometry allows delivery vehicles to turn, including the swept path of the design vehicle. It is not the haul road that leads to it and not a ramp. MTP-SM-GAS-OUTLET Product class Gas outlet valve Forms the draw-off point for gas at the appliance and allows the supply to be shut off manually at the point of use. Mounted on the wall or inside furniture and connected to the gas pipework, with a shut-off device and a tested connection to the appliance by rigid pipe or approved hose. MUP-SM-COMPRESSOR Product class Compressed air compressor Generates compressed air at the pressure and quality required by the connected consumers and maintains supply from a receiver against fluctuating demand. SFP-PARKING Product class Parking area Marked area where cars, vans, and site vehicles stand while they are not loading or turning. Distinct from the haul road, the turning area, and the transfer point. MTP-SM-SPRINKLER-HEAD Product class Sprinkler head Detects heat at ceiling level, opens automatically, and discharges extinguishing water over the protected floor area so that a fire is controlled at its origin. MUP-SM-GAS-REGULATOR Product class Gas pressure regulator Reduces the gas pressure of the supply line to the operating pressure of the building installation, keeps it constant under varying demand, records the quantity taken, and shuts off the supply in case of a fault. SFP-SKIP-BAY Product class Skip bay Reinforced bay where skips are placed, filled, and collected, with access for the skip lorry. Not general open storage and not the transfer area for construction materials. MTP-SM-HOSE-REEL Product class Hose reel Provides a permanently charged water draw-off point with hose and nozzle so that occupants or the fire brigade can fight a fire by hand. Installed as a recessed or surface cabinet in the wall and connected to the fire water pipework through a shut-off valve, with the hose held on a reel ready for immediate use. MUP-SM-FIRE-PUMP Product class Fire pump Supplies the sprinkler or hydrant network with firefighting water at the required pressure and flow rate as soon as demand is detected, and holds the network pressurised in standby. SFP-SILO Product class Silo Erected silo with filling and discharge, standing on a prepared base and feeding a mixer or pump. The silo is the storage vessel; the mixing plant and the pump are separate objects. MTP-FIRE-FIRE-DAMPER Product class Fire damper Closes the duct penetration at a fire compartment boundary in case of fire and prevents fire and smoke from spreading into the adjoining compartment. SFP-BATCH-PLANT Product class Concrete batching plant Mixer, aggregate bins, cement feed, and controls of an on-site batching plant. It produces the concrete. MTP-FIRE-FIRE-DAMPER-ACTUATOR Product class Fire damper actuator Drives the damper blade into its safe position on alarm or loss of power and reports the reached position back to the control system, so that closing can be triggered and verified remotely. SFP-PUMP Product class Concrete pump Truck-mounted or stationary pump with its set-up position and the boom envelope used to reach the pour. Distinct from the batching plant that produces the concrete. MTP-FIRE-SMOKE-DETECTOR Product class Smoke detector Monitors the air in the room or void for smoke and raises the alarm that starts evacuation and the linked fire control functions. Mounted on the ceiling or inside the monitored void on a base carrying the loop wiring, with each detector individually addressed so that it can be located from the alarm panel. SFP-HOIST Product class Construction hoist Mast-guided hoist or material lift tied to the structure, with landings at the served levels. Not a crane and not scaffolding. SFP-SCAFFOLD Product class Scaffold Frame or system scaffold with platforms, guardrails, and ties to the building. It is a work platform, not a protective canopy over the public footway and not the site fence. SFP-POWER-DIST Product class Site power distribution board Site distribution cabinet with outlets, protection, and sub-distribution for cranes, containers, and tools. The water connection is a separate concept. SFP-WATER-CONN Product class Site water connection Connection to the public or a temporary water supply, with meter, stop valve, and distribution to sanitary units, the wheel wash, and the concrete plant. Counterpart of the site power distribution board. SFP-OTH Product class Other / unknown site facility Placeholder for site facilities whose type is not yet fixed or not covered by a specific concept. State the function separately. UT-WH-01 Room type Dwelling Gross volume of a dwelling. The room count follows the Swiss count; the half room is the kitchen. RT-WH-01 Room type Residential entry Entry space within a dwelling unit. RT-WH-02 Room type Hallway Circulation passage within a dwelling unit. UT-WH-15 Room type 1.5-room dwelling Gross volume of a 1.5-room dwelling. Living room and kitchen, with no separate bedroom. UT-WH-25 Room type 2.5-room dwelling Gross volume of a 2.5-room dwelling, with one bedroom. RT-WH-03 Room type Living room Room for daily living and relaxation. RT-WH-04 Room type Dining room Room for eating meals. UT-WH-35 Room type 3.5-room dwelling Gross volume of a 3.5-room dwelling, with two bedrooms. RT-WH-05 Room type Kitchen Room for food preparation. UT-WH-45 Room type 4.5-room dwelling Gross volume of a 4.5-room dwelling, with three bedrooms. RT-WH-06 Room type Bedroom Room primarily used for sleeping. UT-WH-55 Room type 5.5-room dwelling Gross volume of a 5.5-room dwelling, with three bedrooms and one dining room. RT-WH-07 Room type Bathroom Room with bath, shower, or personal hygiene fixtures. UT-WR-01 Room type Office suite Gross volume of a lettable office suite. RT-WH-08 Room type Home study Residential room for study or home office work. UT-BH-01 Room type Single room Gross volume of a hotel room for one person, with a private bathroom. RT-WH-09 Room type Guest room Room for overnight guests. UT-BH-02 Room type Double room Gross volume of a hotel room for two people, with a private bathroom. UT-BH-03 Room type Suite Gross volume of a suite with a bedroom, a separate living room, and a private bathroom. RT-WH-10 Room type Stairwell Vertical circulation between storeys. RT-WH-11 Room type Waste room Room for collecting and setting out household waste. RT-WH-12 Room type Lobby Shared entrance hall of the building. UT-CO-01 Room type Shop Gross volume of a lettable shop. RT-WH-13 Room type Elevator lobby Landing in front of the lift on a storey. UT-KL-01 Room type Basement Gross volume of the basement. RT-WH-14 Room type Mail room Room for receiving and distributing mail. UT-ER-01 Room type Vertical circulation Gross volume of the vertical circulation. RT-WH-15 Room type Balcony Open exterior space attached to the dwelling. UT-ER-02 Room type Horizontal circulation Gross volume of the horizontal circulation. UT-PK-01 Room type Parking garage Gross volume of a parking garage. RT-WH-16 Room type Street Public access in front of the building. RT-WH-17 Room type Laundry room Laundry room within a dwelling unit. RT-WH-18 Room type Communal laundry Shared laundry for several dwellings, distinct from the laundry inside one dwelling. RT-WH-19 Room type Caretaker's cupboard Caretaker storage for cleaning and maintenance. RT-WH-20 Room type Corridor Shared circulation outside the dwelling units. RT-WH-21 Room type Cellar compartment Assigned cellar storage compartment for a dwelling. RT-WH-22 Room type Interior bicycle parking Bicycle parking space inside the building. RT-WH-23 Room type Interior car parking Car parking space inside the building, typically in the basement garage. RT-WH-25 Room type Garden area Garden area for staying outdoors and for upkeep. RT-WH-26 Room type Playground Outdoor play area. RT-WH-27 Room type Escape balcony Balcony used as a second means of escape. RT-WH-28 Room type Utility room Room for domestic utilities and equipment. RT-WH-29 Room type Residential closet Small storage within a dwelling unit. RT-WH-30 Room type Apartment unit Generic residential unit space when not subdivided further. RT-WH-31 Room type Terrace Exterior paved or decked platform. RT-WH-32 Room type Courtyard Courtyard or patio. RT-WH-33 Room type Roof terrace Occupiable flat-roof area intended for outdoor use. RT-WH-34 Room type Exterior car parking Exterior parking space for passenger cars. RT-WH-35 Room type Exterior bicycle parking Exterior parking space for bicycles. RT-WH-36 Room type Loggia Recessed open outdoor room inside the building volume, distinct from a projecting balcony. RT-WH-37 Room type Winter garden Closed glazed living room, distinct from open outdoor platforms such as balcony, terrace, and patio. RT-WR-01 Room type Office Enclosed office for individual or shared desk work. RT-WR-02 Room type Open-plan office Open office landscape without full-height partitions. RT-WR-03 Room type Meeting room Room for small group meetings. RT-WR-04 Room type Conference room Room for formal meetings and presentations. RT-WR-05 Room type Break room Informal staff rest and refreshment space. RT-WR-06 Room type Reception Visitor reception and waiting area. RT-CI-01 Room type Vestibule Transition space between exterior and interior. RT-CI-02 Room type Airlock Enclosed lock or airlock for controlled passage between zones. RT-CI-03 Room type Ramp Inclined accessible circulation route. RT-HY-01 Room type Male toilet Toilet room for male use. RT-HY-02 Room type Female toilet Toilet room for female use. RT-HY-03 Room type Accessible toilet Wheelchair-accessible toilet room. RT-HY-04 Room type Unisex toilet Toilet room for mixed or all-gender use. RT-HY-05 Room type Shower room Room with shower facilities. RT-HY-06 Room type Changing room Room for changing clothes. RT-HY-07 Room type Locker room Room with personal lockers. RT-HE-01 Room type Patient room Room for inpatient care and recovery. RT-HE-02 Room type Recovery room Room for post-procedure recovery. RT-HE-03 Room type Treatment room Room for outpatient treatment. RT-HE-04 Room type Operating theatre Room for surgical procedures. RT-HE-05 Room type Procedure room Room for minor medical procedures. RT-HE-06 Room type Examination room Room for clinical examination. RT-HE-07 Room type Imaging room Room for diagnostic imaging. RT-HE-08 Room type Medical laboratory Laboratory for medical analysis. RT-HE-09 Room type Waiting room Room for patients and visitors to wait. RT-HE-10 Room type Nurses station Central nursing and monitoring workspace. RT-ED-01 Room type Classroom Room for school or group instruction. RT-ED-02 Room type Lecture hall Room with fixed seating for lectures. RT-ED-03 Room type Seminar room Room for seminars and workshops. RT-ED-04 Room type Computer room Room with computer workstations for teaching. RT-ED-05 Room type Library room Room for reading and library use. RT-ED-06 Room type Study room Room for self-directed study. RT-ED-07 Room type Training workshop Room for practical skills training. RT-ED-08 Room type Assembly hall Large assembly hall for events. RT-ED-09 Room type Art studio Room for visual arts instruction and practice. RT-ED-10 Room type Science laboratory Laboratory for science teaching. RT-CO-01 Room type Cafeteria Self-service dining space. RT-CO-02 Room type Restaurant Full-service dining space. RT-CO-03 Room type Bar Room for beverage service. RT-CO-04 Room type Food court Shared dining area with multiple vendors. RT-CO-05 Room type Retail space Room for displaying and selling goods. RT-CO-06 Room type Sales floor Open retail sales area. RT-CO-07 Room type Kiosk Small retail or service counter space. RT-CO-08 Room type Customer service area Area for customer assistance and service. RT-CO-09 Room type Exhibition space Room for displays and exhibitions. RT-CO-11 Room type Commercial kitchen Kitchen for commercial food preparation. RT-CO-10 Room type Hotel room Guest accommodation room. RT-CO-12 Room type Dishwashing area Room for returning, washing, and preparing dishes. RT-IN-01 Room type Workshop Room for manual fabrication and repair. RT-IN-02 Room type Production hall Hall for manufacturing processes. RT-IN-03 Room type Assembly area Area for product assembly. RT-IN-04 Room type Packaging area Area for packaging goods. RT-IN-05 Room type Clean room Controlled-environment production room. RT-IN-06 Room type Warehouse Room or hall for goods storage. RT-IN-07 Room type Loading dock Area for loading and unloading goods. RT-IN-08 Room type Quality control room Room for inspection and quality testing. RT-IN-09 Room type Maintenance bay Bay for equipment maintenance. RT-IN-10 Room type Covered yard Covered exterior work or storage yard. RT-TE-01 Room type HVAC plant room Room for heating, ventilation, and cooling plant. RT-TE-02 Room type Pump room Room for pumps and fluid handling. RT-TE-03 Room type Boiler room Room for boilers and heat generation. RT-TE-04 Room type Chiller room Room for chillers and cooling plant. RT-TE-05 Room type Sprinkler room Room for fire suppression equipment. RT-TE-06 Room type Electrical room Room for electrical distribution equipment. RT-TE-07 Room type Server room Room for IT and network equipment. RT-TE-08 Room type Generator room Room for backup power generation. RT-TE-09 Room type Transformer room Room for electrical transformers. RT-TE-10 Room type Communications room Room for telecom and low-voltage systems. RT-TE-11 Room type Meter room Room for utility metering equipment. RT-ST-01 Room type General storage Room for general material storage. RT-ST-02 Room type Supply room Room for consumable supplies. RT-ST-03 Room type Equipment storage Storage for tools and equipment. RT-ST-04 Room type Unloading storage Temporary storage at delivery point. RT-ST-05 Room type Archive room Room for document and record archives. RT-ST-06 Room type Cold storage Refrigerated storage room. RT-ST-07 Room type Laboratory store Storage for laboratory materials and consumables. RT-ST-08 Room type Chemical store Storage for chemicals. RT-ST-09 Room type Hazardous materials store Storage for hazardous materials. RT-ST-10 Room type Sample storage Storage for laboratory or material samples. RT-VO-01 Room type Shaft Vertical service or circulation shaft. RT-VO-02 Room type Riser Vertical building services riser. RT-VO-03 Room type Plenum Ceiling or floor service void. RT-VO-04 Room type Mechanical void Non-accessible mechanical void. RT-VO-05 Room type Air space Non-occupiable air volume in the model. RT-PK-01 Room type Interior truck parking Interior parking space for trucks. RT-PK-02 Room type Interior motorcycle parking Interior parking space for motorcycles. RT-OU-01 Room type Maintenance roof Walkable flat-roof area accessible only for facility management and inspection. RT-OU-02 Room type Technical plant pad Flat-roof or outdoor pad reserved for building-services equipment and plant. RT-OU-03 Room type Green roof Vegetated flat-roof area modelled as outdoor space. RT-OU-04 Room type Pool area Outdoor pool or water feature area. RT-OU-05 Room type Retention area Multi-purpose area with temporary, planned water retention during heavy rainfall. RT-OU-06 Room type Covered walkway Covered exterior pedestrian route. RT-OU-07 Room type Portico Covered exterior entrance structure. RT-OU-08 Room type Exterior stair Open or external stair for outdoor vertical circulation. RT-PK-03 Room type Exterior truck parking Exterior parking space for trucks. RT-PK-04 Room type Exterior motorcycle parking Exterior parking space for motorcycles. RT-WH-38 Room type Drying room Room for drying laundry, distinct from the wash room. RT-ST-11 Room type Stroller room Store for strollers and mobility aids off the lobby, off the escape route. RT-ST-12 Room type Parcel room Parcel locker room, distinct from the mail room and from personal lockers. RT-WH-39 Room type Waste chute Vertical chute for transferring household waste to a central collection point. RT-WH-40 Room type Exterior waste collection area Outdoor area for collecting and presenting bagged household waste. RT-WH-41 Room type Underground waste container Outdoor space allocated to an underground household-waste collection container. RT-WH-42 Room type Garden shed Enclosed outdoor storage room for garden tools and household goods. RT-WH-43 Room type Community office Shared office for residents working outside their dwelling. RT-WH-44 Room type Exterior mailbox and parcel locker area Outdoor area allocated to mailboxes and parcel lockers. RT-CO-13 Room type Stage Area for performances, including its backstage zone. RT-CO-14 Room type Spectator stand Tiered seating or standing area for spectators. RT-CO-15 Room type Cloakroom Room for depositing visitors' coats and bags. RT-CO-16 Room type Sports hall Hall for indoor sports and physical education. RT-CI-04 Room type Platform Platform for boarding and alighting trains, trams, or buses. RT-CI-05 Room type Ticket hall Hall with ticket counters and machines for passenger transport. RT-TE-12 Room type Control room Staffed room for monitoring and operating building or IT systems. RT-WR-07 Room type Copy room Shared room for printing, copying, and office supplies. RT-CO-17 Room type Pickup point Counter or area where customers collect goods ordered or bought in advance. RT-CI-06 Room type Service lift Lift for goods, staff, and service routes, separate from public lifts. RT-CI-07 Room type Bed lift Lift sized for transporting patients in beds. RT-LA-01 Room type Chemical waste room Room for collecting and setting out chemical laboratory waste, separate from other waste. RT-LA-02 Room type Biological waste room Room for collecting and setting out biological laboratory waste, separate from other waste. RT-LA-03 Room type Radioactive waste room Room for collecting radioactive laboratory waste and letting it decay, separate from other waste. RT-WH-45 Room type Shared compost Outdoor area where residents compost organic waste together. RT-WR-08 Room type Phone booth Soundproofed booth for one person's phone calls and online meetings. RT-HY-08 Room type Teachers' toilet Toilet room for teachers, separate from pupils and students. RT-HY-09 Room type Students' toilet Toilet room for pupils and students, separate from teachers. RT-HY-10 Room type Visitor toilet Toilet room for visitors and customers, separate from staff. RT-HY-11 Room type Staff toilet Toilet room for staff, separate from customers. RT-CO-18 Room type Swimming hall Hall with a pool for training, school swimming, and recreation. RT-OU-09 Room type Children's pool Shallow outdoor pool where children get used to the water. US-WH-18 Scenario Arriving home Residents and visitors announce themselves at the building entrance. The reception method determines personal contact, visual confirmation, and access control. US-GA-06 Scenario Reaching the dining rooms Guests reach the dining rooms while food and tableware move between kitchen and service. The access arrangement determines step-free access and separation of guest and service routes. US-RZ-06 Scenario Reaching the IT rooms Staff and hardware reach the IT rooms under control. The access arrangement determines access control, transport loads, and security zones. US-LA-06 Scenario Reaching the laboratory Researchers, samples, and supplies reach the laboratory floors. The access arrangement determines access control, hazardous goods transport, and separation of people and material routes. US-LO-06 Scenario Reaching the warehouse Goods and staff move between the dock and storage floors. The access arrangement determines loads, handling time, and separation of people and goods routes. US-VE-06 Scenario Reaching the platform Passengers travel from the hall to the platform with luggage, pushchairs, or wheelchairs. The access arrangement determines transfer time, step-free access, and passenger flow. US-VS-08 Scenario Reaching the hall Audiences reach the hall within a short time and leave together, and stage equipment must reach other floors. The access arrangement determines crowd flow, escape routes, and separation of audience and deliveries. US-BH-06 Scenario Reaching the room Guests reach their rooms with luggage while staff move linen and supplies between floors. The access arrangement determines step-free access, quiet, and separation of guest and service routes. US-GE-01 Scenario Reaching the unit Users travel from the building entrance to their unit. The access arrangement determines routes, step-free access, and area demand. US-PR-06 Scenario Reaching production Staff and materials reach the production floors. The access arrangement determines loads, material flow, and separation of people and goods routes. US-HE-08 Scenario Reaching the ward Patients are moved in beds between ward, diagnostics, and surgery while visitors and supplies use the same floors. The access arrangement determines bed transport, hygiene, and separation of routes. US-VK-06 Scenario Reaching the sales floor Customers reach the sales floor with bags or trolleys, and stock must reach the store room. The access arrangement determines step-free access and separation of customer and goods routes. US-HE-01 Scenario Arriving and waiting Patients and accompanying people arrive and wait for care. The calling system determines waiting area, travel, and privacy. US-BH-01 Scenario Checking in Guests arrive and gain access to their accommodation. The process determines reception area, staffing, and wayfinding. US-VE-01 Scenario Boarding and alighting Passengers board and alight trains, trams, or buses at short intervals. The platform layout determines transfer routes, waiting zones, and passenger flow. US-LA-01 Scenario Running experiments Researchers carry out tests, measurements, and analyses. The laboratory type determines ventilation, media supply, and safety level. US-GA-01 Scenario Serving guests Guests order and consume food and drink. The service concept determines movement, dwell time, and dining area. US-PR-01 Scenario Manufacturing and assembly Products are made in series or as one-offs. The manufacturing concept determines hall size, crane runways, and material flow. US-SP-01 Scenario Training indoors Clubs, schools, and individuals train ball sports, gymnastics, or fitness. The hall determines the sports, divisibility, and booking. US-WR-01 Scenario Focused work Staff perform tasks that require sustained concentration. The workplace concept determines quiet, privacy, and area demand. US-WH-13 Scenario Parking the car Residents arrive by car. The parking place decides the route from the car to the dwelling and whether the site needs parking space. US-RZ-01 Scenario Operating servers IT systems run around the clock. The arrangement of IT rooms determines availability, loads, and expandability. US-GE-02 Scenario Using the toilets Users and visitors need toilets during their stay, including wheelchair users. The split determines number, area, privacy between user groups, and how flexibly the toilets can be used. US-BI-01 Scenario Teaching and learning Learners and teachers regularly work in groups. The teaching format determines room size, furniture, and adaptability. US-VS-01 Scenario Attending events Audiences attend concerts, lectures, or assemblies. The hall concept determines seating, flexibility, and room height. US-LO-01 Scenario Receiving goods Trucks deliver goods in fixed time slots. The number of doors and the receiving area determine waiting times and yard traffic. US-VK-01 Scenario Displaying and selling goods Customers browse goods, choose, and pay. The retail concept determines area, product display, and staffing. US-GE-03 Scenario Disposing of waste Users and the operation take their waste away regularly. The collection point and the separated fractions determine walking distance, area, and ventilation. US-VS-02 Scenario Visiting exhibitions Visitors view objects or works over a longer time. The exhibition concept determines room sequence, light, and security. US-VE-02 Scenario Buying tickets Passengers buy tickets and ask for information. Staffed counters determine staffing, area, and waiting zones. US-BH-02 Scenario Staying overnight Guests sleep and stay temporarily in the accommodation. The room concept determines privacy, equipment, and area. US-VK-02 Scenario Advising customers Customers need advice, service, or a complaint handled away from the checkout. A dedicated area determines discretion, waiting time, and sales floor area. US-LA-02 Scenario Storing samples and supplies Samples, reagents, and consumables are kept until use. Storage conditions determine temperature, access, and traceability. US-PR-02 Scenario Checking quality Parts and products are checked before delivery. The test environment determines indoor climate, vibration protection, and proximity to production. US-SP-02 Scenario Swimming Swimmers train, learn to swim, or relax in the water. Location and water depth determine the enclosure, plant area, and supervision. US-BI-02 Scenario Independent learning Learners work alone or in small groups outside lessons. The location determines quiet, supervision, and accessibility. US-GA-02 Scenario Preparing food Staff prepare food for guests. Production scale determines kitchen area, equipment, and goods flow. US-RZ-02 Scenario Securing power supply Servers need uninterrupted power. The supply concept determines redundancy, plant area, and fire compartments. US-HE-02 Scenario Examining and consulting Professionals examine and consult patients. Room allocation determines transfers, privacy, and utilization. US-WH-12 Scenario Parking the bicycle Residents park their bicycles every day. The place decides whether bicycles stand sheltered indoors or outdoors, and how far the dwelling is. US-LO-02 Scenario Storing goods Goods stay in stock for days to months. The storage type determines room height, temperature, and fire protection. US-WR-02 Scenario Collaborating Teams regularly work together. The location determines whether collaboration happens in the work area or in a separate room. US-VE-03 Scenario Waiting for departure Passengers wait before departure, sometimes with luggage or children. Sheltered waiting areas determine comfort, weather protection, and area. US-BH-03 Scenario Using bathroom facilities Guests wash and care for themselves during their stay. Allocation determines privacy, travel, and room area. US-WR-03 Scenario Holding meetings Staff and visitors meet for planned discussions. Group size determines the type and number of rooms. US-GE-04 Scenario Disposing of organic waste Users and the operation regularly take food and green waste away, separately from other waste. The collection point determines odour, cooling, and how often it is collected. US-LA-03 Scenario Handling hazardous substances Chemicals and hazardous substances are delivered, stored, and disposed of. Separate stores determine fire compartments, ventilation, and routes through the building. US-GA-03 Scenario Serving drinks Staff prepare and serve drinks. The service point determines travel and separation between production and guest areas. US-VS-03 Scenario Spending time in the foyer Audiences gather before the start and during the interval. The foyer offer determines dwell quality, catering, and area. US-WH-20 Scenario Storing the stroller Households park strollers and mobility aids every day. The place decides whether they block the dwelling or shared circulation. US-LO-03 Scenario Picking and packing Orders are picked and made ready for shipping. Picking determines routes, workstations, and buffer areas. US-PR-03 Scenario Delivering materials Raw materials and semi-finished goods arrive by truck. Delivery determines yard area, stock levels, and routes to production. US-HE-03 Scenario Providing treatment Patients receive procedures of varying complexity. The procedure determines room type, support, and safety zones. US-BI-03 Scenario Practical learning Learners carry out experiments or creative and manual work. The activity determines equipment, safety, and area demand. US-RZ-03 Scenario Cooling servers Servers give off heat continuously. The cooling concept determines cooling capacity, waste-heat use, and plant area. US-SP-03 Scenario Changing and showering Athletes change before and after training. Separate changing rooms determine booking, gender separation, and hygiene. US-VK-03 Scenario Delivering stock for sale Stock arrives daily or weekly and is held until sale. Delivery determines delivery times, storage area, and separation from customer routes. US-RZ-09 Scenario Using waste heat Servers give off heat that would otherwise be lost at the heat rejection. Using that waste heat determines the boiler room, the connection, and the building's heat demand. US-WR-04 Scenario Receiving visitors External visitors come to the workplace. The reception point determines wayfinding, access control, and the route to work areas. US-BI-04 Scenario Spending breaks Learners spend breaks together. The location determines supervision, noise, and the use of indoor and outdoor areas. US-HE-04 Scenario Performing diagnostics Professionals produce diagnostic images or analyse samples. The method determines specialist rooms, travel, and technical equipment. US-LO-04 Scenario Maintaining vehicles and equipment Forklifts and delivery vehicles are charged, serviced, and repaired. Dedicated maintenance areas determine downtime and workshop needs. US-PR-04 Scenario Packing and shipping finished goods Finished products are packed, staged, and collected. Shipping determines buffer areas and the separation of inbound and outbound goods. US-BH-04 Scenario Having breakfast Guests have breakfast during their stay. The provision determines dining space, travel, and operating hours. US-VS-04 Scenario Checking coats Visitors leave coats and bags before the event. The type of storage determines security, staffing, and queues in the foyer. US-LA-07 Scenario Changing in the laboratory Staff put on protective clothing before entering the laboratory zone. The location determines contamination protection and routes in laboratory clothing. US-VK-04 Scenario Taking breaks in retail Retail staff work in shifts and need breaks away from customers. Staff rooms determine rest, hygiene, and ancillary area. US-WH-22 Scenario Sleeping Residents sleep in the dwelling every night. A separate room or part of the living room decides the room count, the area, and how far sleep stays undisturbed by the rest of the home. US-SP-04 Scenario Storing sports equipment Mats, goals, and apparatus are put away after training. The location of the store determines set-up time and usable hall area. US-VE-04 Scenario Transferring Passengers change between lines and modes. Connecting routes determine transfer time, accessibility, and crowding. US-GA-04 Scenario Delivering and storing goods Goods are regularly delivered and stored before processing. Logistics determine delivery routes, storage area, and separation from guests. US-VS-05 Scenario Preparing performances Performers change, wash, rehearse, and wait for their appearance, apart from the audience. The backstage determines workflows, privacy, and stage operation. US-HE-05 Scenario Observing and caring Patients remain under observation after treatment or overnight. Length of stay determines privacy, monitoring, and care routes. US-RZ-04 Scenario Monitoring operations Staff monitor the systems and respond to faults. A staffed control room determines response time, workstations, and access control. US-LA-05 Scenario Evaluating results Researchers analyse data and write reports outside the lab. Separate write-up spaces determine lab area, safety, and team exchange. US-VE-05 Scenario Leaving luggage Passengers leave luggage for a few hours. The storage offer determines security, area, and staffing. US-GA-05 Scenario Washing dishes Used dishes are returned and washed during service. The location determines return routes, noise, and separation of clean and used items. US-BI-05 Scenario Eating and drinking Learners and staff eat during the education day. The provision determines travel, dwell time, and additional area. US-WH-01 Scenario Cooking and eating Residents cook and eat together every day. A room of its own or part of the living room changes the room count, the area, and how far cooking shapes the living space. US-WR-05 Scenario Taking breaks Staff take breaks and eat during the working day. The provision determines social contact, travel, and additional area. US-PR-05 Scenario Changing shifts Staff put on and take off work clothes before and after each shift. Changing rooms determine hygiene, gender separation, and routes to production. US-VK-05 Scenario Collecting purchased goods Customers collect goods ordered online or bulky purchases. Collection determines waiting time, proximity to stock, and car access. US-LO-05 Scenario Dispatching goods Trucks collect picked goods and wait until departure. Truck bays determine yard area, weather protection, and noise. US-SP-05 Scenario Watching competitions Spectators watch games and competitions on site. A stand determines spectator numbers, escape routes, and hall volume. US-BH-05 Scenario Servicing rooms Rooms are regularly cleaned and supplied with consumables. The service point determines travel, storage, and operations. US-WH-02 Scenario Working from home Residents sometimes work from home. A room of its own decides quiet and area, and whether small dwellings are suitable. US-RZ-05 Scenario Delivering hardware Servers and spare parts are delivered, unpacked, and installed. Delivery determines transport routes, door sizes, and security zones. US-VK-07 Scenario Changing in retail Retail staff put on work clothes and take off private clothes before the shift, away from customers. The location determines routes in work clothes and the number of changing rooms. US-WR-06 Scenario Copying and printing Staff print, copy, and fetch office supplies several times a day. A dedicated room determines noise, emissions, and routes within the office zone. US-VS-06 Scenario Storing equipment Stage elements, seating, and exhibition material are stored between events. The storage location determines changeover time, transport routes, and area in the building. US-HE-06 Scenario Moving medical goods Materials and samples are supplied, used, and removed. Logistics determine storage, travel, and separation of clean and used goods. US-BI-06 Scenario Preparing lessons Teachers prepare lessons, mark work, and coordinate between classes. The workplace determines quiet, exchange among staff, and area demand. US-HE-07 Scenario Visiting Relatives and friends visit patients during their stay. The visiting location determines privacy, disruption of care, and routes through the ward. US-LA-09 Scenario Disposing of special waste Researchers take hazardous laboratory waste away separately from other waste. The kind determines ventilation, shielding, and the route out of the building. US-WH-03 Scenario Overnight guests Visitors stay overnight now and then. A bed of their own decides whether guests sleep apart from the household. US-WR-07 Scenario Housing servers The organization runs its own servers and network equipment. The location of IT determines plant area, cooling, and availability. US-VS-07 Scenario Supplying events Technical equipment, set construction, and catering are delivered before each event and collected afterwards. Delivery determines set-up time, backstage routes, and yard area. US-LA-08 Scenario Emergency power Experiments, refrigerated samples, and fume cupboards have to keep running during a power cut. Emergency power determines whether a dedicated generator is needed, and with it the plant area and the fire compartment. US-WH-06 Scenario Support at home Residents who need support live on their own and receive home-care visits. A step-free route decides whether both reach the dwelling and the rooms they need. US-WH-09 Scenario Doing laundry Households do laundry regularly. The choice decides whether each dwelling has its own machines or the way leads to a communal laundry. US-WH-19 Scenario Drying laundry Households dry laundry regularly. The place decides where moisture and equipment sit, in the dwelling or shared in the building. US-WH-10 Scenario Storing household goods Households store things they rarely use. The place decides what takes space in the dwelling and what is kept outside it. US-WH-05 Scenario Delivering mail Mail is delivered and collected daily. The place decides where it is kept safe and how far it is from the dwelling. US-WH-14 Scenario Receiving a parcel Parcels arrive even when no one is home. The handover point decides whether they can wait in a safe place. US-WH-07 Scenario Living outdoors Residents spend time outdoors without leaving home. A private outdoor space by the living room decides direct access to the outside. US-WH-17 Scenario Outdoor play Children play outdoors near home. The choice decides whether the site offers a play area. US-WH-08 Scenario Cleaning of common areas Shared rooms are cleaned regularly. The choice decides whether the building needs space for cleaning supplies. ANS Document Elevations Building elevations as the geometric and visual planning basis. They act as a completeness check against the IFC model - facade, openings, and junctions must be readable on the drawing. APH Document Heating execution drawings Heating-system execution drawings with the routes, circuits, dimensions, and connections required for construction. BGD Document Building permit dossier Complete building application submitted to the permitting authority, including forms, plans, reports, concepts, and project-specific evidence. BGA Document Permit plans architecture Architecture permit plans for the building application. Floor plans, sections, and elevations in the representation required by the authority. BGE Document Permit plans electrical Electrical permit plans for the building application. Representation of the electrical systems in the form required by the authority. BGH Document Permit plans heating Heating permit plans for the building application. Representation of the heating systems in the form required by the authority. BGK Document Permit plans cooling Cooling permit plans for the building application. Representation of the cooling systems in the form required by the authority. BGC Document Permit plans air conditioning Air-conditioning permit plans for the building application. Representation of the air-conditioning systems in the form required by the authority. BGL Document Permit plans ventilation Ventilation permit plans for the building application. Representation of the ventilation systems in the form required by the authority. BGS Document Permit plans plumbing Plumbing permit plans for the building application. Representation of the plumbing systems in the form required by the authority. BPK Document Building physics component catalogue Building physics component catalogue with values for the envelope and separating components. Basis for verification, variants, and coordination with architecture and specialists. CRQ Document Change requests Change orders and variations. They prevent unplanned extra cost by coupling variations directly to the affected milestones and containers (project, site, building, storey). BWP Document Reinforcement plans Reinforcement plans for concrete execution. They make bars, layers, and positions readable for site. BBO Document Flooring schedule Room list by covering type, area, and perimeter as a verifiable basis for the flooring tender. The figures come from the interior spaces, not from a separate quantity take-off. BDG Document Geotechnical report Geotechnical report with subsoil, bearing capacity, and geotechnical recommendations. It complements the terrain survey and position reference as the basis for foundations, excavation, and strategy choice. BSM Document Fire cause-and-effect matrix Fire cause-and-effect matrix for detectors, dampers, actuators, and suppression equipment. It ensures the safety matrix is formally approved before construction. BSK Document Fire protection concept Fire protection concept with protection goals, compartments, and required fire-resistance classes. Binding basis for the fire plan, model values, and permit. BSP Document Fire protection plan Fire protection plan with compartments, escape routes, and fire resistance of the governing components. It supports alignment with the fire concept and permit documents. DET Document Details Standard and execution details as the geometric planning basis. They close the gap between model and construction and act as a completeness check where the IFC model is not held at detail depth. FEN Document Window schedule Schedule of windows with window number, type, and dimensions as the basis for tender, coordination, and handover to operation. FMR Document Funding report Report on a construction project's funding applications with the associated measures, check results, contributions, and evidence. Basis for tracking from application through to payment. FUG Document Joint layouts Coordinated layout of movement, perimeter, and bay joints in the floor build-up as a basis for underfloor heating and construction. GLD Document Terrain survey Terrain survey with position and height reference in LV95 and control points. Binding spatial basis for all discipline models; complemented by the geotechnical report. GRD Document Floor plans Storey floor plans as the geometric and visual planning basis, typically at scale 1:50. They act as a completeness check against the IFC model - the model is validated via IDS, the plans show whether the status is complete and readable. GRS Document Floor plans, schematic Schematic storey floor plans in early phases, often at scale 1:200 or 1:100. Placing a grey or black area behind the spaces allows floor plans to be produced without drawing the walls. IGR Document IPD base reference Contract-ready functional base reference with market-indexed reference costs as the basis for IPD award, fee calculation, and bonus settlement. KBE Document Cost calculation The cost calculation refines and details the cost estimate in line with the advanced technical design status and the more precise element-based quantity basis. KVA Document Cost estimate The cost estimate is based on the technical design status and element-based quantities. The cost accuracy of ± 25 % indicates the confidence in the underlying assumptions, not an allowable cost deviation; contingencies and escalation must be shown separately. LAY Document Robotic layout file Storey-wise layout file derived from the architecture model for robotic printing on the structural slab. It contains the lines and short texts to set out - not as a parallel 2D drawing, but as a derivation from the model status. LVP Document Planning services specification Contract-ready description of the planning services, results, and data deliveries expected when procuring a design team. LV Document Bills of quantities Bills of quantities for tender and award. NZK Document Usage concept Usage concept with prioritized usage scenarios, verifiable acceptance criteria, and operational assumptions. Binding basis for test planning, the room programme, and acceptance of design and construction. NVG Document Usage agreement MEP MEP usage agreement. It links agreed room-by-room requirements for heating, ventilation, air conditioning, plumbing, and electrical to the technical design status. NVT Document Usage agreement structure Structural usage agreement to SIA 260. It links agreed uses, loads, and vibration requirements per space to the technical design status of the structure. LFP Document Delivery plan / IDP A management instrument of project management. It sets which information is delivered in which container, in what form, by whom, and by when. PPL Document Product-passport list List of installed products using the GTIN and, where needed, the serial number as the key to the corresponding digital product passport. The contractor or supplier maintains and updates the data. BAP Document Project handbook / BEP Project handbook and BIM execution plan as a living management and working document. It is not intended to form part of the contract but is continuously developed based on knowledge gained throughout the project. PRT Document Minutes Meeting and decision minutes are preferably maintained as one continuous, living document. Current discussion items are highlighted for easy orientation, enabling contradictions to be identified early and content from the project handbook or BEP to be addressed directly and kept up to date. RMB Document Room book Continuously maintained data container for ordered room types, planning room types, room instances, and their requirements and deviations throughout the project. RPG Document Room programme Structured list of the rooms ordered at an agreed status, with a stable technical room number, ordered room type, and groupings. Binding basis for designer procurement, competition, and comparison with the model. RGR Document Daywork reports Daywork reports for time-and-material work. They prevent unplanned extra cost by coupling daywork directly to the affected milestones and containers (project, site, building, storey). SGG Document Hazardous-material report Report of hazardous-material findings in the existing building. Component-level type and remediation urgency are taken from it into the existing-building model. SHL Document Formwork plans Formwork plans for concrete execution. They make formwork, dimensions, and junctions readable for site. SCT Document Sections Building sections as the geometric and visual planning basis. They act as a completeness check against the IFC model - heights, layers, and vertical relationships must be readable on the drawing. GSK Document Building security concept Security concept with security zones, security levels, protection goals, and required burglary resistance classes. Binding basis for model values and insert models of critical areas. STG Document Riser schematics / shafts Riser schematics and shafts for building services. They ensure vertical distribution and shafts are formally approved before construction. SYS Document System and plant schematics (MEP) MEP system and plant schematics (heating, ventilation, air conditioning, plumbing, electrical). They ensure building-services concepts are formally approved before construction. TL Document Door schedule Construction-ready schedule of all doors, gates, and inspection openings with the information required for ordering, fabrication, and installation. UVP Document Environmental impact assessment Environmental impact assessment of the project's effects on the environment and surroundings. Basis for the building application and alignment with the authority. VKG Document Traffic study Traffic study for access, parking, and effects on the surrounding network. Basis for the building application and alignment with the authority. WHB Document Maintenance manuals Asset-specific documentation for safe operation, inspection, and maintenance. WVT Document Maintenance contracts Contracts for agreed asset maintenance over a defined term. WVK Document Works contracts Works contracts with contractors. WSP Document Apartment schedule Schedule per apartment with count, type, and gross and net residential area. Derived from gross volumes and net rooms and kept current when the design changes. DBA Document Design-build functional tender basis Client-side functional tender basis with requirements, indicative quantities, quality specifications, and price boundaries as the foundation for design-build awards with a binding offer price. IFC-2X3 Regulation Industry Foundation Classes IFC2x3 TC1 IFC-4 Regulation Industry Foundation Classes IFC4 ADD2 TC1 IFC-4X3 Regulation Industry Foundation Classes IFC4.3 ADD2 SIA-181 Regulation SIA 181 Sound insulation in buildings SIA-416 Regulation SIA 416 Areas and volumes of buildings SIA-500 Regulation SIA 500 Obstacle-free buildings VKF-14-15 Regulation Fire protection directive 14-15 Use of building materials VKF-15-15 Regulation Fire protection directive 15-15 Fire safety distances, load-bearing structures, fire compartments VKF-16-15 Regulation Fire protection directive 16-15 Escape and rescue routes VKF-17-15 Regulation Fire protection directive 17-15 Escape route marking, safety lighting, safety power supply VKF-18-15 Regulation Fire protection directive 18-15 Fire-extinguishing equipment VKF-19-15 Regulation Fire protection directive 19-15 Sprinkler systems VKF-20-15 Regulation Fire protection directive 20-15 Fire alarm systems VKF-21-15 Regulation Fire protection directive 21-15 Smoke and heat exhaust systems VKF-23-15 Regulation Fire protection directive 23-15 Conveying systems VKF-24-15 Regulation Fire protection directive 24-15 Heating plant VKF-25-15 Regulation Fire protection directive 25-15 Ventilation systems VKF-26-15 Regulation Fire protection directive 26-15 Hazardous substances WBS Regulation Housing evaluation system WBS SIA-181-001 Rule Airborne sound insulation meets the requirement The verified airborne sound insulation of a wall, slab, door or exterior element reaches at least the required value. The acoustic consultant sets the requirement under SIA 181: between rooms from the room pair and the requirement level, for exterior elements from the exterior noise and the noise sensitivity. VKF-16-15-001 Rule Escape route to an exit or stair at most 50 m From no point of an interior space may the route to the nearest exit to the outside or the nearest stair (vertical escape route) exceed 50 m. The 50 m apply only where two separate exits or stairs can be reached; otherwise the 35 m limit applies (VKF-16-15-002). WBS-2015-001 Rule Net living area meets the WBS minimum fit-out The net living floor area of a dwelling (walkable floor areas from 1.50 m room height, WBS glossary) reaches at least the Grundausstattung value for the room count: 30 / 45 / 60 / 80 / 100 / 120 / 140 m² for 1 to 7 rooms. Sum the net areas of all spaces that share the same UsageUnitReference. SIA-181-002 Rule Impact sound level at most the permitted value The verified impact sound level in the room below a slab does not exceed the maximum permitted value. The acoustic consultant sets the maximum under SIA 181 from the room pair and the requirement level. VKF-16-15-002 Rule Escape route with a single exit at most 35 m Where only one exit to the outside or only one stair serves as vertical escape route, the route from the most remote point of an interior space is limited to 35 m. The model does not show whether a second, independent escape route exists, so the check reports routes above 35 m as a warning. WBS-2015-002 Rule Rooms meet the WBS minimum areas Habitable rooms of a dwelling meet the Grundausstattung minima: main rooms at least 14 m², other rooms at least 10 m² (WBS 2015 annex). Additional area offers (bays, niches, walkable zones) count toward K16 but do not replace the room minima. SIA-181-003 Rule Separating elements between usage units carry a sound insulation requirement Walls, slabs and doors between rooms of different usage units, or between a usage unit and a room outside it such as the stairwell, need an airborne sound insulation requirement under SIA 181. Without a requirement neither the acoustic verification nor the check of the elements is possible. VKF-16-15-003 Rule Doors on escape routes: clear width at least 0.90 m A door that an escape route passes through needs a clear opening width of at least 0.90 m. Depending on the use, smaller sizes are allowed, for example for doors to ancillary or small rooms. WBS-2015-003 Rule Rooms allow varied furnishing per the WBS area module Habitable rooms provide enough clear floor area and sensible door and window positions so the WBS area module for varied furnishing (living and sleeping without fixed use) fits. Assessment follows lead furniture such as sofa and table zones alongside Grundausstattung minima. SIA-181-004 Rule Rooms next to other usage units carry noise load and noise sensitivity A room of a usage unit that adjoins a room outside its unit through a wall, slab or door needs a noise load and a noise sensitivity. Under SIA 181 the requirement of the separating element depends on both values of the room pair; if one is missing, it cannot be derived. VKF-16-15-004 Rule Doors on escape routes: clear height at least 2.00 m Doors on escape routes need a clear passage height of 2.00 m; use-specific deviations are possible. The check reads the overall door height (IfcDoor.OverallHeight): if even that is below 2.00 m, the clear height is too small. WBS-2015-004 Rule Rooms provide WBS-compliant bed positions Each room allows at least one bed position per the WBS bed module: single 1.00 × 2.00 m or double 1.80 × 2.00 m with 0.60 m side clearances and free door swing. How many positions fit per room follows the layout and Grundausstattung. VKF-16-15-005 Rule Horizontal escape routes at least 1.20 m wide Corridors and other horizontal escape routes are at least 1.20 m wide, measured between walls or railings. A higher occupancy can require more width. WBS-2015-005 Rule Kitchen and dining areas meet the WBS Grundausstattung The dwelling kitchen and dining zone allow the Grundausstattung: kitchen run in 0.60 m modules with an operating band, table module with chair zone by size (e.g. 1.6 × 1.6 m for 1 room up to 4.2 × 2.7 m for 7 rooms), and passage widths of at least 0.90 m. VKF-16-15-006 Rule Stairs on escape routes: width 1.20 m, winding 1.50 m Straight stairs including landings on escape routes are at least 1.20 m wide. Winding stairs need 1.50 m and an inner tread width of at least 0.15 m. WBS-2015-006 Rule Sanitary rooms meet WBS count and accessibility The dwelling provides the sanitary rooms from Grundausstattung (1 to 3 rooms by apartment size, at least 3.8 m² per sanitary module in planning). At least one sanitary room is usable without barriers per accessibility building requirements (SIA 500, paraphrased). VKF-16-15-007 Rule Number of stairs as vertical escape routes by floor area A storey without sufficient ground-level exits to the outside needs at least one vertical escape route up to 900 m² of floor area and at least two above 900 m². Rooms for more than 100 people also need two vertical escape routes unless sufficient ground-level exits exist. WBS-2015-007 Rule Storage and kitchen areas provide WBS wardrobe modules Storage and kitchen zones provide additional wardrobe modules from Grundausstattung (2 to 7 modules by room count, wardrobe module 0.60 × 0.60 × 1.80 m with 0.90 m front service clearance). Not yet checkable as SHACL: module count and footprints per dwelling unit and service zones are not aggregated quantities yet. VKF-16-15-008 Rule Room exits by occupancy The number and width of a room's exits depend on its occupancy: up to 50 people one exit of 0.90 m; up to 100 people two of 0.90 m each; up to 200 people three of 0.90 m each or two of 0.90 m and 1.20 m; more than 200 people several of at least 1.20 m each. WBS-2015-008 Rule Apartment layout is adaptable after completion Non-load-bearing interior walls of the dwelling are planned so they can be removed or added later to enable adaptable layouts. Assessment covers partitions between living spaces, not the load-bearing core. VKF-16-15-009 Rule Doors on escape routes open in the escape direction Doors on escape routes open in the escape direction and can be opened quickly in that direction at any time without a key or tool. For rooms for at most 20 people the swing direction is free; the check applies only when a connected space has PeakOccupancy above 20 or no occupancy is set. WBS-2015-009 Rule Dwelling has private outdoor area per WBS The dwelling has privately usable outdoor areas (balcony, terrace, garden, loggia) at least at Grundausstattung levels by room count (3 to 6 m²). Sum outdoor areas tied to the same UsageUnitReference. VKF-15-15-001 Rule Structure in basements at least R 60 Load-bearing elements below ground need the same fire resistance as the structure of the storeys above, and in any case R 60. Single-family houses including their basement and buildings of small dimensions are exempt. WBS-2015-010 Rule Transitions between living space and outdoors are high quality Transitions between living spaces and the private outdoor area (doors, windows, sliders, level changes, weather protection) enable comfortable, safe indoor-outdoor use without disruptive barriers. Thresholds, paths, and accesses match how the outdoor area is used. VKF-15-15-002 Rule Fire compartment walls and slabs in basements at least EI 60 Walls and slabs forming fire compartments below ground meet the requirement of their use, and at least EI 60. The check treats every wall or slab with a stated fire resistance of class EI, REI or F as forming a compartment. WBS-2015-011 Rule Private storage rooms outside the dwelling are assigned Private storage rooms outside the net dwelling floor area are clearly assigned to the dwelling unit (cellar, attic, locker), in line with Grundausstattung storage areas. Check assignment and usability via the same UsageUnitReference. VKF-15-15-003 Rule Openings in fire compartment walls closed by a fire-rated closure Doors, windows and other openings in walls that form fire compartments are closed by a fire-rated closure. EI 30 is the usual requirement; where the fire load is very small (e.g. between corridor and staircase) E 30 is enough. VKF-15-15-004 Rule Structure: fire resistance by building height Load-bearing elements need at least, by building height: low R 30, medium R 60, high-rise R 90. With sprinklers: low no requirement, medium R 30, high-rise R 60. VKF-15-15-005 Rule Floor slabs: fire resistance by building height Floor slabs forming fire compartments need at least, by building height: low REI 30, medium REI 60, high-rise REI 90. With sprinklers: low EI 30, medium REI 30, high-rise REI 60. VKF-15-15-006 Rule Fire compartment walls: fire resistance by building height Walls separating fire compartments or horizontal escape routes need at least EI 30 at low and medium height and EI 60 in high-rises (EI 30 with sprinklers). These are the lowest values of the tables; other uses partly require more. VKF-15-15-007 Rule Vertical escape routes: fire resistance by building height The enclosure of staircases and other vertical escape routes needs at least: low height REI 30, medium height REI 60, high-rise REI 90. These values apply with sprinklers too; other uses partly require more. VKF-15-15-008 Rule Doors to staircases close automatically Doors leading into a staircase or another vertical escape route have a door closer. Apartment doors and doors of classrooms, single offices and plant rooms are not affected. VKF-15-15-009 Rule Fire separation distance between buildings Between neighbouring buildings, measured facade to facade: 5 m if both facades are RF1 materials on the outside; 7.5 m if one is combustible on the outside; 10 m if both are. VKF-15-15-010 Rule Office buildings: fire compartment at most 3600 m² In office buildings a fire compartment covers at most 3600 m² without special proof. All storeys connected without fire resistance count together. VKF-23-15-001 Rule Lift shaft linking several fire compartments with fire resistance Where a lift links several fire compartments, it sits in a shaft whose enclosure matches the fire resistance of the use-related compartmentation, but at least EI 30. The shaft walls run up to the roof skin; if the shaft ends below, its top closure has the same fire resistance. VKF-23-15-002 Rule Lift landing doors: fire resistance by location and building type Lift landing doors are made of RF1 building materials. Where they open directly into a usage unit, they need E 30, or E 60 under a high fire load (above 1000 MJ/m² in the rooms). VKF-23-15-003 Rule Fire-fighting lift: shaft, lobby and landing doors Access to the fire-fighting lift is on every floor only through lobbies. Shaft and lobbies have fire resistance EI 90, fire-resistant closures and a smoke-control pressurisation system. VKF-15-15-011 Rule Penetrations through compartment components: firestop of at least 30 minutes Openings and service penetrations in walls and floors that form fire compartments are closed with fire resistance; the firestop holds for at least 30 minutes. Allowing for thermal expansion, the recess is either filled tightly with RF1 materials or closed with a VKF-recognized firestop system rated EI 30. VKF-15-15-012 Rule Pipes through compartment components: recognized firestop system Where pipes pass through components that form fire compartments, a VKF-recognized firestop system is used, e.g. a fire collar. VKF-15-15-013 Rule Combustible pipe insulation interrupted at the penetration Combustible thermal insulation on services is interrupted with RF1 material where the service passes through a wall or floor that forms a fire compartment. For tested and recognized components the VKF recognition applies. VKF-15-15-014 Rule Installation shafts over several storeys: compartment-forming, at least EI 30 Building-services lines running over several storeys are in principle routed in installation shafts that themselves form fire compartments. The shaft enclosure matches the fire resistance of the use-related compartmentation, but at least EI 30. VKF-15-15-015 Rule Inspection openings of installation shafts: EI 30 closure Inspection openings in installation shafts are closed with fire-rated closures EI 30. In low and medium-height buildings RF1 inspection covers are sufficient where the shaft is subdivided or filled storey by storey. VKF-15-15-016 Rule Installation shafts: horizontal subdivision at every storey In installation shafts that are closed at the top, the recesses for lines are closed with RF1 materials at every storey. VKF-15-15-017 Rule Installation shafts: separate flue systems and ducts with enhanced requirements Flue systems, ventilation ducts with enhanced fire protection requirements and similar lines are separated from each other and from the other installations in the same shaft with 30 minutes of fire resistance made of RF1 materials, e.g. fire protection boards. VKF-15-15-018 Rule Housing: dwellings as separate fire compartments Dwellings are built as separate fire compartments. For single-family houses including their basements and an associated granny flat, no fire resistance is required of structure, walls and floors. VKF-15-15-019 Rule School buildings: fire compartment at most 3600 m², special rooms separate School operations and associated uses, as well as the gymnasium with its ancillary rooms, may each be combined in one fire compartment. Without special proof the contiguous compartment area is at most 3600 m²; it includes all storeys connected without fire resistance. VKF-15-15-020 Rule Accommodation: guest rooms and technical rooms as fire compartments In accommodation facilities, guest, inmate, patient and staff rooms, operational technical rooms, examination, treatment and laboratory areas, and technical rooms are each built as fire compartments. Not yet checkable: the model does not identify fire compartments. VKF-15-15-021 Rule Car parks: fire compartments of 4800 m² or 2400 m² Car parks form their own fire compartments. For underground car parks and closed above-ground car parks the permitted compartment area is 4800 m² if the car park has one storey or the storeys form separate compartments. VKF-15-15-022 Rule High-rise buildings: no inspection openings in safety stairwells, limit fire spread at the slab edge In high-rise buildings, measures against fire spread are taken at every storey where the floor slab meets the external wall; they are not needed where full extinguishing-system protection is provided. Inspection openings of installation shafts are not located in safety stairwells. VKF-15-15-023 Rule Transformer rooms: separate fire compartment, at least EI 60 Rooms for transformers are built as separate fire compartments. Their enclosure matches the fire resistance of the use-related compartmentation, but at least EI 60. VKF-14-15-001 Rule High-rise buildings: external wall and cladding system made of RF1 materials The external wall and the external wall cladding system of high-rise buildings are made of RF1 materials. Exceptions are plastic anchors, point back-anchorages of insulation and components of negligible area such as joints or seals. VKF-14-15-002 Rule High-rise buildings: external wall with combustible layers encapsulated on all sides K 60 Where a high-rise external wall consists of single layers containing combustible materials, it counts as RF1 as a whole if it is encapsulated on all sides with K 60 - RF1. The gaps are filled without voids with RF1 materials. VKF-14-15-003 Rule External wall cladding systems: reaction to fire by building height and use The required reaction-to-fire group of external wall cladding systems rises with building height. In low buildings, RF3 materials generally suffice for other uses, while for accommodation the insulation layer stays RF1. VKF-14-15-004 Rule Medium height: subdivide combustible facade, fire spread at most two storeys In medium-height buildings with combustible external wall cladding or thermal insulation, the facade is subdivided structurally so that a fire spreads at most two storeys above the storey of origin before the fire brigade attacks. The fire brigade must be able to reach the facade surfaces for firefighting. VKF-14-15-005 Rule Rendered external insulation with combustible insulant: fire barrier at every storey External thermal insulation composite systems with a combustible insulant on medium-height buildings are a VKF-recognized or equivalent construction, or have a circumferential fire barrier made of an RF1 material with a melting point of at least 1000 °C and at least 0.2 m high at every storey. VKF-14-15-006 Rule Ventilated facades: recognized construction, substructure RF3, fixings RF2 Ventilated facades on medium-height buildings whose cladding or insulation in the ventilated cavity is combustible are VKF-recognized or equivalent constructions. On low and medium-height buildings, rod-shaped substructures made of RF3 materials suffice. VKF-14-15-007 Rule Double-skin facades made of RF1, no storey-spanning box windows Storey-spanning double-skin facades are made of RF1 materials; combustible linear window profiles are allowed, and with additional measures combustible materials are possible. Storey-spanning box windows are not allowed. VKF-14-15-008 Rule External fabrics and films: reaction to fire, distance and position Fabrics and films fixed on the outside are made of at least RF2 materials, on facades with an RF1 outer layer at least RF3. Combustible fabrics and films are only possible in front of facade areas without openings and fixed glazing, and keep at least 0.9 m distance in width and height from openable windows. VKF-14-15-009 Rule Materials with critical behaviour (cr) generally not usable indoors Materials with critical behaviour (cr) are generally not usable inside buildings. Exceptions are cables, single-layer membrane facades and materials under a void-free covering with a minimum thickness of 0.5 mm (RF1), 3 mm (RF2) or 5 mm (RF3). VKF-14-15-010 Rule Vertical escape routes: reaction to fire of linings and structures In vertical escape routes (stairwells) of low and medium-height buildings with a structural concept, walls and floors with fire resistance, wall and ceiling linings, classified systems, stretched ceilings and stair and landing structures are made of RF1 materials; floor coverings are at least RF2. VKF-14-15-011 Rule Horizontal escape routes: reaction to fire of linings In horizontal escape routes of low and medium-height buildings, wall and ceiling linings and classified systems are made of RF1 materials with a structural concept and of RF2 with an extinguishing-system concept; stretched ceilings are RF1 or RF2, one group lower where more than 5 m above walkable areas. VKF-14-15-012 Rule Escape routes: combustible area share at most 10 % In escape routes, the area share of combustible materials such as luminous panels, pin boards, linings or balustrade infills is at most 10 % of the stairwell floor area per storey or of the floor area of the horizontal escape route. Partial areas are at most 2 m² and keep at least 2 m distance from each other. VKF-14-15-013 Rule Other interior rooms: minimum reaction-to-fire requirements In interior rooms outside escape routes, RF3 materials generally suffice in low and medium-height buildings. Exceptions: in accommodation and rooms with large occupancy, stretched ceilings are RF1 with a structural concept and RF2 with an extinguishing-system concept. VKF-14-15-014 Rule Interior fit-out: thin coatings and linear substructures where RF1/RF2 is required Where RF1 is required for interior walls, floors and ceilings, combustible coatings such as paint, wallpaper or veneer up to 1.5 mm thick are allowed on the room side. Where RF1 or RF2 is required, linear substructures such as battens may be RF3, provided the visible side has a closed layer of the required group. VKF-14-15-015 Rule Evacuation rooms, airlocks and anterooms: assignment to escape routes For materials, evacuation rooms count as vertical escape routes, except patient rooms and horizontal escape routes in accommodation. Airlocks count as vertical escape routes, anterooms as horizontal ones. VKF-17-15-001 Rule Offices, trade, schools, high-rise: escape signs and safety lighting In office, industrial and trade buildings, school buildings, underground protective structures and high-rise buildings, exits and escape routes are marked with escape signs, and safety lighting is installed in the escape routes. VKF-17-15-002 Rule Accommodation: illuminated escape signs on safety lighting and safety lighting In accommodation facilities, exits and escape routes are marked with escape signs on safety lighting, and safety lighting is installed in the escape routes. For remote accommodation facilities (e.g. mountain huts) the fire authority decides whether it is needed. VKF-17-15-003 Rule Car parks: safety lighting also in the room, e.g. in driving lanes In car parks, exits and escape routes are marked with escape signs on safety lighting and the escape routes are fitted with safety lighting. The escape routes within the parking area itself, for example along the driving lanes, also get safety lighting. VKF-17-15-004 Rule Rooms with large occupancy, shops: signs lit continuously In rooms with large occupancy and in shops, exits and escape routes are marked with escape signs on safety lighting. Their lighting stays on as long as people are in the room. VKF-17-15-005 Rule Escape signs: direction indicators, visibility and height across the escape direction The escape direction is marked with direction indicators if it is not immediately obvious or if people unfamiliar with the premises are present, for example at changes of direction. Exits that are not immediately recognizable or are used only in emergencies are marked. VKF-17-15-006 Rule Escape signs: visibility not impaired, no confusing green Decorations, advertising and other fittings do not impair the view of escape signs. Other illuminated signs, inscriptions and mirrors do not distract or cause confusion. VKF-17-15-007 Rule Escape signs: durable, easily recognizable, white on green Escape signs are durable and large enough to be easily recognizable; the required size depends on the distance from which the meaning must still be clear. According to recognized standards they are rectangular or square, with white arrows and symbols on a green ground. VKF-17-15-008 Rule Lighting of escape signs: safety lighting, afterglow, safety power supply Where lighting of escape signs is required, it is provided as safety lighting. Signs that are neither lit nor backlit are photoluminescent. VKF-17-15-009 Rule Safety lighting: at least 30 minutes, effective after 15 seconds, not switchable Safety lighting takes effect in time when the normal lighting fails and lasts at least 30 minutes; if the general power supply fails, it is operating after 15 seconds at the latest. VKF-17-15-010 Rule Safety luminaires: light the floor zone and the route to the open air In escape and rescue routes, safety lighting adequately lights in particular the floor zone and the way to the exit to the open air. Safety luminaires mounted low above the floor have an unbreakable guard. VKF-17-15-011 Rule Safety lighting in escape routes: at least 1 lux The illuminance of safety lighting in escape routes is at least 1 lux. Not yet checkable: the model carries no illuminance for luminaires or escape routes. VKF-17-15-012 Rule Power sources for safety purposes: independent of the normal supply A power supply for safety purposes is needed for the safety lighting of rooms, escape routes and escape signs, and for fire protection installations such as sprinkler pumps and fire-brigade lifts. VKF-17-15-013 Rule Safety power sources: installation room at least EI 30, separation EI 60 Power sources for safety purposes and their controls are installed in fixed positions in rooms with a low fire risk. The installation room matches the fire resistance of the structure or the fire compartments, but at least EI 30; the doors are EI 30. VKF-17-15-014 Rule Distribution network for safety purposes: separate circuits, functional endurance, separation Circuits for safety purposes are laid independently of other circuits. The distribution network is protected against fire so that functional endurance matches the intended operating time of the connected consumers. VKF-17-15-015 Rule Acceptance test of safety lighting and safety power supply Complex projects for safety lighting and power supply for safety purposes, including escape-route marking, are submitted for approval before construction starts when the fire authority requests it. After completion, and after major extensions and changes, the installations are accepted and the test is documented. VKF-16-15-010 Rule Keep escape routes clear at all times and use them only for circulation Escape and rescue routes may serve as ordinary circulation routes but must stay clear and safely usable at all times. Outside the use unit they must not serve any other purpose, for example as storage or waiting areas. VKF-16-15-011 Rule Vertical escape routes lead independently to the outside and are not offset Vertical escape routes (e.g. stair systems) lead to a safe place outside. Where there are several, they lead there independently of each other. VKF-16-15-012 Rule Escape route within the use unit at most 35 m Within a use unit the escape route may measure at most 35 m. If the exits do not lead directly outside or into a vertical escape route within these 35 m, a horizontal escape route is needed in between (e.g. a corridor with fire resistance or an access balcony). VKF-16-15-013 Rule Exit width above 200 people: 0.6 m per 100 or per 60 people With an occupancy above 200 people, the exits together must be at least 0.6 m wide per 100 people where the route leads outside at ground level, and at least 0.6 m per 60 people where it leads over stairs. Example from the appendix: 400 people over stairs give 4.0 m total width. VKF-16-15-014 Rule External stairs: definition and protected external walls A stair system counts as an external stair if less than half of its plan area is enclosed by external building walls and half of the facade portion bordering the outside is permanently open, with evenly distributed openings that cannot be closed. VKF-16-15-015 Rule Horizontal escape routes: lead to the vertical route, subdivided above 50 m Horizontal escape routes lead to a vertical escape route or to a safe place outside. If they are longer than 50 m, fire separations divide them so that escape routes of similar length result. VKF-16-15-016 Rule Access balconies: open, made of RF1, leading to the vertical escape route Access balconies lead to vertical escape routes and consist of RF1 materials; linear load-bearing members may be combustible. They are permanently open to the outside for at least half, with evenly distributed openings that cannot be closed. VKF-16-15-017 Rule Doors on rescue routes openable from outside, automatic doors suitable Doors on rescue routes must be openable from outside by the emergency services. Automatic sliding and revolving doors are allowed on escape routes if they ensure escape at all times and are suitable for this use. VKF-16-15-018 Rule Buildings with small dimensions: 35 m escape route, narrower stairs In buildings with small dimensions the escape route to a safe place outside is at most 35 m and may lead through several rooms within the use unit. VKF-16-15-019 Rule Housing: relaxations for separations, stairs and doors In residential buildings of low and medium height, fire separations between horizontal and vertical escape routes may be omitted if the floor area per vertical escape route is at most 900 m², the horizontal escape routes between vertical ones are subdivided with fire resistance, and they match the vertical ones in... VKF-16-15-020 Rule Office, trade and industry: relaxations and door dimensions In office buildings of low height, fire separations between horizontal and vertical escape routes may be omitted if the floor area per vertical escape route is at most 900 m², the horizontal escape routes are subdivided with fire resistance and match the vertical ones in material, fire resistance and risk of... VKF-16-15-021 Rule Schools and day-care centres: relaxations and short routes In school buildings of low height, fire separations between horizontal and vertical escape routes may be omitted if the floor area per vertical escape route is at most 900 m², the horizontal escape routes are subdivided with fire resistance and match the vertical ones in material, fire resistance and risk of... VKF-16-15-022 Rule Stairs and ramps with large occupancy: width, steps, gradient For shops and rooms with large occupancy, the total width of stair flights and landings follows the widest exit of the connected storeys. Stairs wider than 2.4 m are divided by handrails. VKF-16-15-023 Rule Record occupancy, room exits directly onto escape routes The decisive occupancy determines the number and dimensions of escape routes and is to be recorded in writing and bindingly. Where no binding data exist (e.g. seating plans), area-based assumptions apply and may be adapted to the project. VKF-16-15-024 Rule Shops: circulation routes 1.2 m, main routes 1.8 m, escape streets 3.6 m Shops must have circulation routes serving escape; where they merge, main circulation routes arise. Circulation routes are at least 1.2 m wide and main routes at least 1.8 m. VKF-16-15-025 Rule Seating: passage 0.45 m, at most 32 or 16 seats per row In rooms with large occupancy, seats are arranged in rows and interrupted by aisles so that the exits can be reached as directly as possible. The free passage between rows is at least 0.45 m, and circulation routes are at least 1.2 m wide. VKF-16-15-026 Rule Accommodation: horizontal evacuation, hotel room doors, reception On bed floors of accommodation [a] where sick, care-dependent or assistance-dependent people are housed, the horizontal escape routes are subdivided so that, together with the patient rooms, at least two independent fire compartments allow horizontal evacuation. VKF-16-15-027 Rule Car parks: airlocks or forecourts for compartments above 1200 m² If exits of a parking area lead into a vertical escape route and the fire compartment area exceeds 1200 m², fire-resistant airlocks or forecourts are to be provided. The fire resistance of the airlocks matches that of the load-bearing structure but is at least EI 30. VKF-16-15-028 Rule Agriculture: two exits for stables above 200 m² Stables with a floor area above 200 m² need at least two suitably placed, sufficiently large exits through which livestock can also be evacuated. The doors open in the escape direction. VKF-16-15-029 Rule High-rise buildings: safety stairwells with airlocks In high-rise buildings, storeys above ground are served by safety stairwells. These are vertical escape routes specially protected against the entry of smoke and fire (pressurized smoke control system). VKF-16-15-030 Rule Atria and inner courtyards: escape routes only with smoke and heat exhaust, verified Escape routes across atria and inner courtyards are allowed if smoke and heat exhaust systems ensure safe walkability, shown by a verification. For further fire protection requirements for buildings with atria, the appendix refers to the VKF fire protection explanation on buildings with atria and inner courtyards. VKF-25-15-001 Rule Air-handling units serving several ventilation sections: separate room with EI 30 and EI 30 doors Units that serve several ventilation sections are installed in a separate room. Its enclosure matches the fire resistance of the use-related compartmentation, but at least EI 30; the doors are also EI 30. VKF-25-15-002 Rule Outdoor air and exhaust air: safe intake and discharge Outdoor air is taken directly from the open so that no combustible gases or vapours are drawn in. Exhaust-air ducts discharge to the open so that escaping fire gases and flames do not endanger the surroundings and cannot reach the outdoor-air intake. VKF-25-15-003 Rule Filters and silencers at least RF3, filter liquid with flash point above 160 °C Filters and silencers are made of at least RF3 materials. Filter liquids have a flash point above 160 °C. VKF-25-15-004 Rule Fans and air-treatment units of RF1, safety devices on air heaters Fans (except parts of no fire-safety significance) and air-treatment units with their built-in parts (air heaters, coolers, heat recovery, humidifiers) are made of RF1 materials. VKF-25-15-005 Rule Smoke trigger device at the extract connection of systems serving several ventilation sections Systems that serve several ventilation sections (fire compartments combined for ventilation purposes) have a smoke trigger device at the extract connection. When it responds, it switches the system off and closes the fire dampers. VKF-25-15-006 Rule Ventilation ducts of RF1, exceptions at least RF3 Ventilation ducts, ventilation ceilings and floors are made of RF1 materials. At least RF3 is enough within the fire compartment of ventilation sections in office, school and dwelling units, for ventilation ceilings and floors within one compartment, for ducts cast in concrete and for earth registers. VKF-25-15-007 Rule Hangers and thermal insulation of ventilation ducts Hangers and fixings of RF1 ducts are also RF1 (except vibration dampers and the like) and hold the duct securely for the required fire resistance duration. Thermal insulation of RF1 ducts is RF1; outdoor-air ducts may use at least RF3 (cr) if covered on all sides with at least 0.5 mm of RF1. VKF-25-15-008 Rule Ducts without openings through other sections: EI 30 or fire dampers Ventilation ducts that run without openings through other fire or ventilation sections, or whose outlets are on the storey above or below, are built or clad with EI 30. In airlocks and vertical escape routes the fire resistance of the use-related compartmentation applies, at least EI 30. VKF-25-15-009 Rule Inspection and cleaning openings; no foreign installations in ventilation ducts Ventilation ducts are arranged and fitted with openings so that they can be inspected and cleaned. Only parts that serve the system may be installed in ventilation ducts and air-carrying shafts (except ventilation ceilings and floors). VKF-25-15-010 Rule Duct penetration through compartment-forming components: firestop EI 30 or RF1 filling The recess between the ventilation duct and the compartment-forming component is, allowing for thermal expansion, either filled tightly with RF1 materials (e.g. mortar, plaster) or closed with a firestop system that reaches EI 30 in compartment-forming walls and floors. VKF-25-15-011 Rule Fire dampers: at least EI 30-S, actuator, thermal release, self-closing Fire dampers prevent fire and smoke from spreading through ventilation systems and are rated at least EI 30-S. They are fixed according to the declaration of performance or VKF technical information and the manufacturer's instructions, and are accessible and inspectable from outside. VKF-25-15-012 Rule Fire dampers where ducts cross fire compartments and ventilation sections Fire dampers are placed where ventilation ducts pass through fire walls and compartment-forming walls and floors, and where ducts without openings run through other ventilation sections without having the required fire resistance themselves. VKF-25-15-013 Rule Omitting fire dampers: permitted exceptions Fire dampers can be omitted where fire compartments can be combined structurally into ventilation sections; in office and school buildings with a ventilation-section area up to 1,200 m²; in accommodation and residential buildings up to 600 m²; for ventilation of wet cells; with separate duct routing up to the... VKF-25-15-014 Rule Fire-case control: system switches off automatically on alarm, otherwise manual switch-off Ventilation systems switch off automatically when fire detection or extinguishing systems, duct smoke detectors or the thermal release of fire dampers respond. Where such devices are missing, the systems can be switched off by hand at an easily accessible place. VKF-25-15-015 Rule Escape routes: no open air routing, ventilation separate or with fire dampers Escape routes do not replace ventilation ducts for open air routing. Compartment-forming escape routes are in principle ventilated separately from other ventilation systems; otherwise fire dampers belong in the compartment-forming walls, with storey-by-storey subdivision, separate ducts or separate systems. VKF-25-15-016 Rule Kitchen extract: grease separators, RF1 ducts, separate plant rooms from EI 60 Kitchen extract ducts are RF1 (heat-resistant) and have a grease separator or filter near the extraction point. In residential buildings RF1 is enough for hood extract; after the hood and before heat recovery a VKF-recognised shut-off device is installed. VKF-25-15-017 Rule Systems with air temperature above 85 °C: RF1 ducts and safety distances At air temperatures above 85 °C the ventilation ducts are RF1 (heat-resistant) and keep a distance to combustible material: 0.1 m up to 100 °C, 0.2 m up to 200 °C, 0.4 m up to 400 °C. With a 30-minute cladding of RF1 (heat-resistant) the distances are halved. VKF-25-15-018 Rule Systems for explosion-hazard areas and aggressive media Systems for fire and explosion hazard areas have separate units and ducts; if the units stand in another area they go in their own room with the fire resistance of the compartmentation, at least EI 60. VKF-25-15-019 Rule Ducts with increased requirements in an installation shaft: separation EI 30 Several ventilation ducts of systems with increased requirements (clauses 4.3.1 to 4.3.3) in the same installation shaft are separated storey by storey and compartment by compartment with a 30-minute fire protection board of RF1; RF1 ducts may instead be clad individually with EI 30 of RF1. VKF-25-15-020 Rule Cleaning, inspection and maintenance of ventilation systems and fire dampers Ventilation systems are cleaned and maintained so that they are always ready for operation and no fire hazard arises. Fire dampers and fire-case controls are inspected periodically. VKF-21-15-001 Rule Smoke and heat exhaust by use, position and fire-compartment area Depending on occupancy, number of storeys, construction type, position and use, fire compartments must be equipped with an adequately sized smoke and heat exhaust system. VKF-21-15-002 Rule Systems without performance proof: system type and sizing by use For systems without performance proof the directive sets, per use, position and area, which system type is permitted: smoke clearance with fire-brigade fans, mechanical or natural systems. Sizing follows air-change rates by room height or supply and exhaust areas as a percentage of the compartment area. VKF-21-15-003 Rule Vertical escape routes: exhaust opening at the top, directly outdoors Vertical escape routes get exhaust openings at the top leading directly outdoors: in low and medium-height buildings for accommodation, large occupancy and shops, in medium-height buildings for residential, office, industrial, commercial and school buildings and car parks, unless every storey has ventilation sashes... VKF-21-15-004 Rule Stairwell exhaust opening: 0.5 m² free, operable from the entrance level The free geometric ventilation area of the exhaust opening at a vertical escape route is at least 0.5 m². It can be put into operation from the entrance level, and it stays operational during a power failure. VKF-21-15-005 Rule Purge ventilation of vertical escape routes from three basements Vertical escape routes of buildings with three or more basements get purge ventilation. The fire protection concept sets how many escape routes are purged; every use unit reaches the purged escape route by a safe horizontal access. VKF-21-15-006 Rule Systems with performance proof for large offices, occupancies, sales areas and atria A smoke and heat exhaust system with performance proof is needed for open-connected multi-storey office compartments above 3,600 m², rooms with over 2,000 people, shops with extinguishing system from 7,200 m² (single-storey) or 3,600 m² (multi-storey), and atria with an escape route or over 2,400 m² floor area. VKF-21-15-007 Rule Safety stairwells: smoke-protection pressurization system with overpressure against the lock Stair enclosures of safety stairwells that are not reached on every storey through permanently open access balconies or forecourts get a smoke-protection pressurization system. The stair enclosure holds a higher overpressure than the lock. VKF-21-15-008 Rule Functional integrity of plant parts for at least 30 minutes The system follows the state of the art and is built, sized and maintained so that it is effective and ready for operation at all times. VKF-21-15-009 Rule Exhaust openings: highest point, on façades evenly on two opposite sides Exhaust openings are placed so that effective smoke clearance is possible without danger to people and buildings, at the highest point of the room, for example in the roof or in the ceiling or roof zone of the façades. VKF-21-15-010 Rule Hot-gas fans: temperature resistance and installation room of at least EI 30 Suitable hot-gas fans are used to extract the smoke gases; they withstand at least 400 °C for the required operating time, in compartments with a water-based extinguishing system and in vertical escape routes at least 200 °C. VKF-21-15-011 Rule Smoke-extraction ducts and dampers: fire resistance of the crossed compartment, dampers at least EI 30 Shafts and ducts withstand the expected stresses and prevent fire and smoke spread when hot fire gases are extracted; length expansion is taken up by fixed points and compensators, and plastic anchors are not permitted for exhaust ducts. VKF-21-15-012 Rule Make-up air: inflow openings near the floor, matched to the exhaust openings Installing a smoke and heat exhaust system requires that the make-up air needed for effective extraction can flow in. Inflow openings, such as façade openings, doors, gates or windows, are placed near the floor and matched to exhaust openings and extract volumes. VKF-21-15-013 Rule Operation and triggering: manual release at a safe location, automatic release with performance proof Systems can be started by hand from a location that is safe in case of fire; the control points show operating, fault and out-of-service states. The fire protection authority can additionally require automatic release. VKF-21-15-014 Rule Power supply for safety purposes independent of the general supply Smoke and heat exhaust systems and smoke-protection pressurization systems are connected to suitable power sources that are independent of the general power supply. Not yet checkable: the model holds no trigger and control points of the system and no power source for safety purposes. VKF-21-15-015 Rule Use of ventilation systems for smoke extraction only if RWA requirements are met Ventilation and air-conditioning systems may be used for smoke and heat extraction only if the affected plant parts meet the requirements for smoke and heat exhaust systems. Not yet checkable: the model holds no smoke and heat exhaust system and no assignment of one to fire compartments. VKF-21-15-016 Rule Concepts: fire-brigade fans down to the 1st basement, natural systems not below ground, extraction under the ceiling Smoke clearance with fire-brigade fans assumes response forces on site within 15 minutes of the alarm, needs inlet openings for setting up the fans in addition to the exhaust openings, and below ground is permitted only down to the 1st basement unless supply air comes from outdoors on the same level. VKF-21-15-017 Rule Project review, acceptance, periodic inspection and maintenance On request of the fire protection authority, projects are submitted for approval in good time. Systems with performance proof are accepted after an installation certificate exists, as are extensions and substantial changes. VKF-18-15-001 Rule Extinguishers and hose reels by use and area Buildings and installations with particular hazards are equipped with suitable, adequately sized means for first-response firefighting; number, type and arrangement depend on occupancy, construction, position, extent and use. VKF-18-15-002 Rule Extinguishing agent matched to fire class and room, portable extinguishers where water is unsuitable The suitability of extinguishers and extinguishing systems depends on handling, properties and quantity of the agent; adverse side effects count. Fire classes A, B, C, D and F are distinguished. VKF-18-15-003 Rule Extinguishers and fire-fighting pipes clearly visible, easily accessible and marked Extinguishers and fire-fighting pipes are clearly visible and easily accessible; where needed, markings or signs identify the location. They can be put into operation quickly and simply at any time without outside aids and used as intended. VKF-18-15-004 Rule Extinguishers close to room exits that serve as escape routes, or in escape routes Within fire compartments, extinguishers are placed in the immediate vicinity of room exits that serve as escape routes, or in escape routes such as corridors and forecourts. VKF-18-15-005 Rule Extinguishers in vertical escape routes only under conditions, hose reels not in safety stairwells Extinguishers may stand in vertical escape routes if there are no fire doors between vertical and horizontal escape routes, for example in office and school buildings up to 900 m² gross floor area, or if several rooms are accessed directly from the vertical escape route. Hose reels in safety stairwells are not allowed. VKF-18-15-006 Rule Uniform arrangement, open placement or cabinet without weakening the fire resistance With similar floor plans and room layouts, extinguishers are arranged as uniformly as possible. They stand in the open or in separate cabinets; recessed cabinets must not weaken the fire resistance of compartment-forming walls. VKF-18-15-007 Rule Extinguishers: walking line to the nearest device at most 40 m Extinguishers are distributed so that a fire can be fought at any point; the walking line to the nearest extinguisher is at most 40 m. In areas with particular fire hazards, additional devices are installed at suitable places. VKF-18-15-008 Rule Hose reels: valve of at least DN 32, form-stable hose up to 40 m with nozzle A hose reel consists of a shut-off valve with a connection of at least DN 32, a movable connection to the swivelling reel, and a form-stable rubber hose with a shut-off nozzle for jet and spray. In special cases, such as agricultural buildings, an equivalent device may replace the reel. VKF-18-15-009 Rule Hose-reel supply line: at least DN 32 in RF1, 3 bar static pressure, 16 l/min The supply line to a hose reel is at least DN 32 and made of materials of reaction-to-fire group RF1; combustible pipes are laid under plaster with fire resistance EI 30 or equally protected. A static pressure of 3 bar prevails at the hose reel and the flow is at least 16 l/min. VKF-18-15-010 Rule High-rise buildings: fire-fighting risers with interior hydrants (at least DN 80) or pressure-boosting connection High-rise buildings are equipped with fire-fighting installations such as wet or dry risers, hose reels with interior hydrants (supply line at least DN 80) or pressure-boosting connections. The requirements are set case by case with the fire protection authority. VKF-18-15-011 Rule Dry and cooling extinguishing systems: scope, subdivision, sizing and pressure relief The scope of special dry and cooling extinguishing systems is limited to individual rooms, areas and equipment. Arrangement and sizing ensure effective cooling or extinguishing effect; pressure-relief openings are installed and large areas are subdivided. VKF-18-15-012 Rule Safety of people with dry extinguishing systems: pre-warning, self-closing doors, danger sign Dry extinguishing systems get warning and delay devices if flooding can endanger people. The pre-warning time between the alarm signal and release of the agent is long enough to leave the flooding zone safely from any point. VKF-18-15-013 Rule Release of special extinguishing systems automatic or manual, with signal and internal alarm Cooling or extinguishing agent can be released automatically or by hand. Systems with automatic release can also be operated by hand. VKF-18-15-014 Rule Instruction, project, acceptance, periodic inspection and maintenance Persons responsible for a business instruct staff in the handling of extinguishers and special systems. Projects for dry and cooling extinguishing systems are submitted for approval before construction starts when required, and the systems are accepted and inspected periodically. VKF-20-15-001 Rule Fire alarm system by occupancy and use, special buildings on request Depending on occupancy and use, buildings, installations or fire compartments are equipped with an adequately sized fire alarm system. It can be required for early alerting of rescue forces, for early activation of fire protection and building services systems, and in large and complex buildings. VKF-20-15-002 Rule Industry, commerce, offices: monitoring when compartments are exceeded, smouldering fires or ban on water For industrial, commercial and office buildings the fire protection authority can require monitoring if the permitted compartment sizes are exceeded and the system makes sense for the current use, if slowly developing fires such as smouldering fires are expected, or if water must not be used as extinguishing agent. VKF-20-15-003 Rule Accommodation: fire alarm system with full monitoring by category, number of storeys and persons In accommodation of category a a fire alarm system with full monitoring is required. VKF-20-15-004 Rule Shops: manual call points added to the sprinkler system; large occupancy on request In shops the sprinkler system is supplemented with manual call points; in sub-areas or individual rooms a fire alarm system is installed where needed to activate technical fire protection equipment. For rooms with large occupancy the fire protection authority can require a fire alarm system. VKF-20-15-005 Rule Monitoring extent: full monitoring, partial monitoring over whole fire compartments Fire alarm systems should be designed as full monitoring and then cover entire buildings and installations, except expressly exempted rooms separated with fire resistance. VKF-20-15-006 Rule Areas that may be exempted from monitoring Exemptions are possible, among others, for installation shafts that are inaccessible or free of ignition hazards, wet rooms without combustible stock, lift shafts with a separate machine room, residential areas separated as a fire compartment, cold rooms up to 50, 200 or 600 m² depending on insulation and... VKF-20-15-007 Rule Fire-brigade control and indicating unit at a safe, easily accessible location Fire-brigade control and indicating units of systems with more than one detector zone stand at a safe location that is easily accessible for the fire brigade, in the escape route or at the fire-brigade access. The operating-state indication is in the immediate vicinity, and unobstructed access is ensured. VKF-20-15-008 Rule Alerting: internal and external alarm, delays of at most 3 and 5 minutes Every response triggers an internal and an external alarm; the external one goes directly to the public fire alarm receiving point. Switch-offs and faults are signalled visually and audibly and forwarded to a permanently staffed point. VKF-20-15-009 Rule Fire-mode controls: activation of fire protection equipment, documented and tested The fire alarm system can trigger fire doors and shutters, smoke and heat exhaust systems, transport systems and ventilation systems. For selective fire-mode controls the trigger is as a rule not by manual call points, which is considered in the fire protection concept. VKF-20-15-010 Rule Fire alarm control panel: safe location, monitored compartment, several panels in a room with EI 30 Fire alarm control panels and remote indicating panels stand at a safe, easily accessible location; the fire compartment of the panel is monitored. VKF-20-15-011 Rule Detector zones: fire location clearly identifiable, vertical shafts combined The entire monitored area is divided into detector zones so that the fire location is shown quickly and unambiguously. Vertical escape routes, light, lift and installation shafts and tower-like structures form one common detector zone. VKF-20-15-012 Rule Manual call points in escape routes and hazardous areas, clearly visible, mounting height about 1.5 m Manual call points are fitted clearly visibly in escape routes, for example at exits, passages, vertical escape routes and extinguishers, and in particularly hazardous areas. VKF-20-15-013 Rule Room indicator lamps at entrances to monitored rooms, at least 1.7 m above floor So that the fire brigade can quickly locate the fire, indicator lamps are installed at entrances to monitored rooms and at raised floors and hollow ceilings, at least 1.7 m above floor. VKF-20-15-014 Rule Special applications: detectors for high rooms, inaccessible places and special environments with consent Detectors for special applications are used where point detectors are unsuitable or only partly suitable because of environmental influences or room conditions, for example outdoors, in cable tunnels, high halls, inaccessible voids, fume cupboards, silos or heritage buildings. VKF-20-15-015 Rule Specialist firm, documentation, switch-off, project, acceptance, inspection and review after 15 years Fire alarm systems are planned, installed and maintained by VKF-recognised specialist firms, with components covered by a declaration of performance or VKF technical information. Orientation plans at the fire-brigade access and a logbook at the control panel are kept. VKF-19-15-001 Rule Sprinkler system by occupancy and use, creditable against fire resistance and compartment size Depending on occupancy and use, buildings, installations or fire compartments are equipped with an adequately sized sprinkler system. It can be taken into account when setting the fire resistance of structures and compartment-forming walls and floors and the permitted compartment size. VKF-19-15-002 Rule Industry, commerce, offices: sprinklers for exceeded compartments, fast fires, hazardous substances or high fire load For industrial, commercial and office buildings the fire protection authority can require a sprinkler system if the permitted compartment sizes are exceeded and the system makes sense for the use, if fast-developing fires are expected, the ignition hazard is high, hazardous substances are handled or stored, or the... VKF-19-15-003 Rule Shops above 2,400 m² compartment area: sprinklers including adjoining storage and service rooms Shops with more than 2,400 m² compartment area, including the adjoining storage and service rooms, are protected by sprinkler systems and supplemented with manual call points. Not yet checkable: the model does not show use, occupancy, number of storeys and compartment size per fire compartment. VKF-19-15-004 Rule Car parks and garages: sprinklers from 4,800, 2,400 or 9,600 m² and for compact parking above 50 vehicles Underground garages need sprinklers from 4,800 m² compartment area per storey, multi-storey ones with open connections from 2,400 m². Closed above-ground garages need them from 4,800 m², partly open ones (enclosure with 25 % non-closable openings) from 9,600 m² per storey. VKF-19-15-005 Rule Rooms with large occupancy: sprinklers on request In buildings and installations with rooms of large occupancy the fire protection authority can require sprinkler systems. Not yet checkable: the model does not show use, occupancy, number of storeys and compartment size per fire compartment. VKF-19-15-006 Rule Protected extent: full protection, partial protection over whole compartments, annexes and canopies Sprinkler systems should be designed as full protection and cover entire buildings and installations, except expressly exempted rooms separated with fire resistance. Partial protection covers at least one whole fire compartment. VKF-19-15-007 Rule Permitted exceptions from sprinkler protection Sprinklers can be omitted, among others, in wet rooms without combustible stock, technical rooms with low fire hazard as a separate compartment, small rooms up to 4 m², cold rooms up to 50, 200 or 600 m² depending on insulation and separation, crawl spaces without fire load, vertical escape routes separated with... VKF-19-15-008 Rule Water unsuitable: substitute measures with equivalent protection in the fire protection concept Where water is not a suitable extinguishing agent, for example for silos with swelling contents, industrial furnaces and baths with increased hazard, substances that form combustible gases with water, or other endangered areas, substitute measures with equivalent protection are taken in agreement with the fire... VKF-19-15-009 Rule Sprinkler control room: separate compartment of at least EI 30, between 1st upper floor and 1st basement, secured access Sprinkler control rooms are located in separate fire compartments with the fire resistance of the use-related compartmentation, at least EI 30, with EI 30 doors. VKF-19-15-010 Rule Water supply: reliable, connection to public network or own supply, nominal operating time 45 to 90 minutes The sprinkler system requires a powerful, reliable water supply with the required connection capacity and pressure. It is connected to the public network in principle; if its capacity including the reserve for the fire brigade is insufficient, an own, combined or independent supply is needed. VKF-19-15-011 Rule Alerting and control: undelayed internal and external alarm via the fire alarm system Every response triggers an internal and an external alarm without delay; the external one goes via a VKF-recognised fire alarm system to the public fire alarm receiving point. Faults are signalled visually and audibly and forwarded to a permanently staffed point. VKF-19-15-012 Rule Shut-off valves only in the sprinkler control room; tested components All plant parts are made of suitable materials and withstand the stresses; only sprinkler components with a declaration of performance or VKF technical information are used. Additives in the extinguishing water need a water-protection approval in addition to the fire protection one. VKF-19-15-013 Rule Specialist firm, documentation, switch-off, project, acceptance, inspection and general overhaul Sprinkler systems are planned, installed and maintained by VKF-recognised specialist firms and adapted on changes, extensions or changes of use. The control room holds the system documentation and a logbook, the fire-brigade access holds orientation plans. VKF-24-15-001 Rule Heating plant: safe operation, verified products and permanent marking Heating plant is built and installed so that it operates safely and damage in case of a fault stays limited; all parts withstand the thermal, chemical and mechanical stresses. VKF-24-15-002 Rule Ban on installing heat generators in escape routes, explosion-hazard rooms and rooms with high fire load Heat generators must not be installed in escape routes, in rooms and zones with fire or explosion hazard, or in rooms with large and very large fire load. Not yet checkable: the model does not show nominal heat output, fuel, type of installation and fire resistance of the boiler room. VKF-24-15-003 Rule Single-family houses and flats: solid-fuel firing units in a room with EI 30 For liquid and gaseous fuels the construction and finish of the installation room are unrestricted. VKF-24-15-004 Rule Boiler room in buildings with several compartments: EI 30 up to 70 kW, EI 60 above, doors EI 30 Firing units stand in separate boiler rooms. Their fire resistance depends on the total nominal heat output: up to 70 kW the use-related compartment value, at least EI 30; above that at least EI 60. VKF-24-15-005 Rule Boiler room with direct access from outdoors: above 1,200 kW on ground floor or lower, above 600 kW from 2nd basement Boiler rooms on the ground floor or lower for plants above 1,200 kW nominal heat output, and boiler rooms on the second basement or lower for plants above 600 kW, get direct access from outdoors. VKF-24-15-006 Rule Open installation in single-storey halls and commercial buildings with low fire load In single-storey halls and multi-storey industrial and commercial buildings with use-related compartments, firing units of any output may stand openly if operation requires it, the clearances are kept and the fire load in the room is low. VKF-24-15-007 Rule Ventilation and combustion air: supply from outdoors, openings not closable Room-air-dependent firing units stand only in ventilated rooms, and combustion air must be supplied from outdoors. Combustion-air openings must not be closed unless a safety device allows operation only with the closure open. VKF-24-15-008 Rule Accessibility, safety devices and shut-off devices of firing units Units and flue system are easily accessible for operation, maintenance and cleaning at all times. VKF-24-15-009 Rule Base plate, floor protection and wall behind firing units in heat-resistant RF1 On combustible floor constructions firing units stand on a base plate of heat-resistant RF1, individually made units such as tiled stoves on a 0.12 m thick slab of stone, concrete or equivalent. In front of solid-fuel units lies a heat-resistant RF1 floor covering extending 0.4 m in front of the loading opening. VKF-24-15-010 Rule Clearances to combustibles: 0.1 / 0.2 / 0.4 m by surface temperature, 0.8 m and 2 m for radiation Adequate clearances apply to all combustible materials, as given in the declaration of performance or VKF technical information, otherwise 0.1 m for surface temperatures up to 100 °C, 0.2 m up to 200 °C and 0.4 m up to 400 °C. VKF-24-15-011 Rule Fireplaces, tiled stoves, pellet firing units, commercial kitchens and cookers For fireplaces the information of the declaration of performance or VKF technical information applies. Tiled and storage stoves keep 0.2 m at the sides, back and top and 0.5 m at the firing opening from combustibles and have cleaning openings. VKF-24-15-012 Rule Mobile firing units and small appliances: clearance, combustion air, no continuous heating without flue Mobile firing units such as building dryers or air heaters keep as much distance from combustibles as comparable stationary units, need sufficient combustion air and, without direct flue routing, stand only in open halls, shells or well-ventilated rooms, not openly in rooms with large occupancy. VKF-24-15-013 Rule Flue systems: system flues, suitable materials, RF1 insulation, classification and marking Flue systems and connecting pipes discharge the flue gases safely, can be cleaned and create no fire hazard. Only system flues made of heat-resistant construction products and suitable materials are used; thermal insulation is RF1. VKF-24-15-014 Rule Flue systems: connections, continuous routing and minimum height above roof Only units that in normal operation do not produce flue gases hotter than the system allows are connected; connecting pipes enter in the same storey and fire compartment. VKF-24-15-015 Rule Flue systems through compartments: EI 60 vertically, compartment value horizontally, distance to combustibles, fill-in Flue systems running vertically through several compartments have EI 60 of heat-resistant RF1 outside the installation room or sit in such a fire protection element, in single-family houses and flats EI 30; horizontally the fire resistance of the compartment applies. VKF-24-15-016 Rule Explosion flaps, flue fans and cleaning openings For fuels prone to deflagration, such as fine-grained coal or wood chips, explosion flaps belong in the flue system, in the boiler room close to the connecting pipe entry and at least the cross-section of the flue. Flue fans create positive pressure only if the system is approved for it. VKF-24-15-017 Rule Solid fuels: daily consumption in the installation room, store EI 60, at most 10 m³ in the boiler room Only a day's consumption may be stored in the installation room, shielded from the unit; larger quantities go into other rooms or outdoors. In single-family houses wood or coal up to 5 m³ is allowed in rooms of any construction. VKF-24-15-018 Rule Heating oil: up to 4,000 l small tanks or 8,000 l steel tanks in a boiler room EI 60, delivery systems not in escape routes In separate boiler rooms with EI 60, heating oil up to 4,000 l in small tanks or up to 8,000 l in steel tanks may be stored; the directive on hazardous substances applies in addition. VKF-24-15-019 Rule Operational readiness and maintenance of heating plant Owners or operators ensure that heating plant is maintained as intended and is ready for operation at all times. VKF-26-15-001 Rule Hazardous substances from 100 kg: GHS classification, protection by type and quantity, fire protection concept before construction The directive covers storage and handling of hazardous substances and preparations from 100 kg, unless other quantities are named. Substances are classified under the GHS, pyrotechnics under explosives law; diesel and heating oil count as combustible without classification. VKF-26-15-002 Rule No hazardous substances in escape routes or in front of exits; on-site overview, instruction, adaptation on change Hazardous substances must not be kept in passages or drive-throughs, in horizontal or vertical escape routes, or in front of entrances and exits. VKF-26-15-003 Rule Maximum stored quantity per fire compartment: 50 t, 200 t with fire alarm, 600 t with sprinklers (by substance class) Maximum quantities in tonnes per fire compartment depend on substance classification. For highly flammable, oxidising and self-igniting substances: 50 t without fire alarm or sprinklers, 200 t with a fire alarm, 600 t with sprinklers (2,400 t for rack storage with automatic sprinklers and foam admixture). VKF-26-15-004 Rule Rooms at fire or explosion risk: zones, pressure relief and fire compartment; storage rooms as fire compartments Rooms are classified by fire and explosion hazard and divided into zones; type, quantity, frequency and duration of combustible gases, dusts or vapours decide. VKF-26-15-005 Rule Ventilation of hazardous concentrations; fans and ignition sources in hazard zones Rooms or zones where combustible gases, vapours, mists or dusts can accumulate dangerously are ventilated naturally or artificially to a sufficient extent. Fans and their drives in explosion-hazard zones or in exhaust ducts must not become effective ignition sources. VKF-26-15-006 Rule Lightning protection: gases above 1,000 kg, combustible liquids above 2,000 l, tyre stores, large pyrotechnic stores Buildings and plant holding hazardous substances are protected against ignition by lightning. Combustible gases: up to 450 kg net no measures, up to 1,000 kg earthing or equipotential bonding of conductive parts, above that a lightning protection system. VKF-26-15-007 Rule Extinguishing equipment in hazard buildings; fire alarm, gas warning or extinguishing systems as needed In buildings and plant with rooms or zones at fire or explosion risk, suitable extinguishing equipment is installed at suitable places and in sufficient number. Where conditions require it, fire alarm systems, gas warning systems or extinguishing systems are added. VKF-26-15-008 Rule Storage concept, substance segregation in separate fire compartments and hazard signs A storage concept is drawn up for stores with hazardous substances (inventory, location, type and container, structural, technical and organisational measures). VKF-26-15-009 Rule Gas cylinders: not in escape routes, ventilated, from 200 l cylinder volume outdoors or in a separate fire compartment Gas cylinders are protected against excessive heating, mechanical damage and falling over and are not stored together with highly flammable or self-igniting substances. In escape routes they are neither connected nor stored; rooms with connected or stored cylinders are sufficiently ventilated. VKF-26-15-010 Rule Cryogenic tanks outdoors with a 5 m protected zone EI 60; liquefied petroleum gas not in basements Cryogenic tanks (vacuum-insulated tanks for deep-cooled liquefied oxidising or asphyxiant gases) stand outdoors and not in depressions. VKF-26-15-011 Rule Aerosol packs: stored apart, below 50 °C, from 100 l behind a grille, flammable ones ventilated Aerosol packs (spray cans) are stored in rooms with low fire risk, locally separated from other stored goods, and kept and used so that they do not warm above 50 °C. Above 100 l they stand behind a grille (e.g. pallet with cage frame, mesh box). VKF-26-15-012 Rule Combustible liquids: prevent spreading, vapours not into lower rooms, flash point ≤ 23 °C only in permitted containers Leaking combustible liquids must not spread (e.g. raised door thresholds, drainage channels, separators, drip trays), and their vapours must not reach lower rooms, sewers, shafts or pits. Heating devices are thermally secured; no heating with open flames or unprotected heat sources. VKF-26-15-013 Rule Storage rooms for combustible liquids: EI 30 doors, access opening at least 0.7 × 1 m with an EI 30 cover Storage rooms for combustible liquids are closed off from other rooms with EI 30 doors. Access to tank rooms is by openings of at least 0.7 × 1 m, closed with EI 30 covers. VKF-26-15-014 Rule Containers and small tanks: requirement for room or cabinet by stored quantity (25 l to over 2,000 l) and flash point For combustible liquids with a flash point up to 60 °C, per compartment: up to 25 l a room of any construction; 26 - 100 l an RF1 cabinet with collecting tray and marking; 101 - 450 l a room EI 30 with low fire risk; 451 - 2,000 l a room EI 60 without additional fire loads; above 2,000 l a room EI 90 without... VKF-26-15-015 Rule Medium-sized tanks: up to 10,000 l flash point ≤ 60 °C in a room EI 90, up to 250,000 l above that in a room EI 60 In a room EI 90 without additional fire loads, at most 10,000 l of combustible liquids with a flash point up to 60 °C may be stored; special protective measures are needed (e.g. mechanical ventilation, extinguishing system, gas detection). VKF-26-15-016 Rule Ventilation for highly flammable liquids: natural openings 20 cm² per m², artificial 3 to 5 air changes, 10 during handling Storage rooms count as sufficiently naturally ventilated when above ground with at least two opposite non-closable openings to the outside, one of them at most 0.1 m above the floor, each at least 20 cm² per m² of floor area. VKF-26-15-017 Rule Oxidising substances: from 100 kg own fire compartment EI 60, outdoors 5 m distance or screen wall EI 60 Oxidisers may be stored with other hazardous substances in the same compartment up to 100 kg in total, if 2.5 m distance to combustible materials is kept or partition walls EI 30 of RF1 are installed. VKF-26-15-018 Rule Substances with special fire behaviour: closed RF1 containers, dry, stock above need in a separate marked room Self-igniting substances are kept in closed RF1 containers excluding air, in an inert atmosphere or under regular temperature monitoring. VKF-26-15-019 Rule Open-air tyre stores: area 2,400 or 4,800 m², sections of 100 m² with 10 m spacing, 10 m to buildings Up to 1 t or less than 10 m² of storage area, no requirements apply. Stores are protected against unauthorised access, and fire protection and fire brigade intervention plans exist. VKF-26-15-020 Rule Tyre stores in buildings: on an exterior wall, EI 60 up to 60 t/600 m², above that EI 90 with sprinklers and foam Stores are on an exterior wall and have clearing openings of at least 2 × 2 m leading directly outdoors. Up to 100 m² the store may stand in the usage unit without fire-resistant separation. VKF-26-15-021 Rule Petrol pumps outside buildings with 3 m distance or an EI 60 wall without openings Petrol pumps stand outside buildings and installations and keep 3 m distance from them. The distance may be smaller if the building wall within 3 m on both sides and 1 m above the pump is EI 60 and without openings. VKF-26-15-022 Rule High-bay racking with hazardous substances: extinguishing system, 18 m storage height, ventilation, aisles as fire compartments High-bay racking is protected with automatic extinguishing systems. VKF-26-15-023 Rule Stores of pyrotechnic articles: cool and dry, locked, EI 30 doors opening in escape direction, extinguishing equipment at the entrance Pyrotechnic articles stay in their shipping and packaging units. Storage rooms are cool, dry, well ventilated and kept at as constant a temperature as possible. VKF-26-15-024 Rule Pyrotechnic stores by quantity: up to 50 kg EI 30, up to 300 kg EI 60, up to 1,000 kg on an exterior wall, above that free-standing with 20 m distance Up to 50 kg gross (temporary, at most 1 month) rooms are built EI 30 and, with low fire risk, may serve other purposes. Up to 300 kg gross, rooms EI 60 without other use are needed. VKF-26-15-025 Rule Night and short-term stores of pyrotechnic articles: RF1 containers with 5 or 10 m distance or an EI 60 screen wall The day's stock from outdoor sales is kept outside opening hours in storage rooms under 11.2.1 to 11.2.5. Fireworks of categories 1 to 3 may be stored up to 1,000 kg gross in free-standing, dedicated RF1 containers. VKF-26-15-026 Rule Sale of pyrotechnic articles in buildings: not in basements, stock at most 30 kg, sales stand not at escape routes The person responsible for sales oversees the display area from their workplace; within 2 m of the stand smoking is banned with a clearly visible sign, and a portable extinguisher (water, spray or air foam) is ready. VKF-26-15-027 Rule Outdoor sale of pyrotechnic articles: day's stock, at most 300 kg, 5 m to facades and escape exits Outdoors the stock does not exceed the day's need; outside opening hours it is kept in the night store. At most 300 kg gross are at the sales stand. VKF-26-15-028 Rule Fireworks: not inside buildings; stage pyrotechnics only in designated areas, stock at most 50 kg in a room EI 30 Fireworks for entertainment must not be set off inside buildings and installations; category 4 is reserved for commercial use by qualified persons.

Based on release v1.3.1 of the pragmaticBIM Reference

Contact

abstract ag

Imprint · Picassoplatz 4, 4052 Basel