PG-01
Goal
Costs & quantities
The aim is not a particular figure but a cost forecast you can rely on. It starts with traceable quantities.
PG-05
Goal
Schedule & coordination
The aim is not a particular date but a schedule that holds. Schedule certainty comes from coordinating in good time.
PG-07
Goal
Decision certainty
The aim is to make strategic and design decisions early, comparably, and traceably. Structured use and massing foundations, option comparisons, visualizations, and documented approvals show the consequences of a decision while the project can still be changed.
PG-09
Goal
Permit certainty
The aim is that the building permit application and official evidence pass without surprises. Requirements for parcels, traffic, parking, accessibility, fire protection, and existing trees are made visible in the model early and checked continuously, as is the evidence for funding.
PG-10
Goal
Design certainty
The aim is a design that meets the client's needs, is internally consistent, and is ready for construction. Design reviews, evidence of fire, acoustic, and thermal protection, fall protection, and checked details make quality repeatably verifiable across all phases.
PG-03
Goal
Verifiable sustainability
The aim is to check energy, material, and life-cycle targets directly against the current design status. Building simulation and life-cycle assessment need the same foundations as cost planning and design.
PG-06
Boundary condition
Working with existing buildings
This framework condition determines which existing-condition information is procured: spatial reference and terrain only; those plus the building mass and structural shell; or structural shell, fit-out, and MEP.
PG-02
Boundary condition
Use & fit-out standard
This framework condition determines which uses the building accommodates and which fit-out standard applies to which spaces. It is the basis for designing spaces to suit their use and for checking the agreed requirements traceably.
PG-40
Boundary condition
Flexibility / service life
This framework condition sets the design service life and how far structure, fit-out, and building services are separated. It drives storey heights, the structural grid, and installation zones.
PG-39
Boundary condition
Accessibility
This framework condition sets how far the building is accessible beyond the legal minimum under SIA 500: adaptable or wheelchair-accessible throughout. It drives doors, spaces, and circulation.
PG-37
Boundary condition
Indoor climate
This framework condition sets whether spaces are only heated, also cooled, or controlled for temperature and humidity. It drives the room types with their target values, the building services, and with them plant areas, shafts, and storey heights.
PG-36
Boundary condition
Certification
This framework condition sets whether the building receives a label such as Minergie-ECO, SNBS Building Construction, or DGNB/SGNI. The label sets minimum levels for the energy standard, the greenhouse gas target, and sound insulation.
PG-34
Boundary condition
Energy standard
This framework condition sets whether the building meets the legal minimum or reaches a standard such as Minergie, Minergie-P, or Minergie-A. The standard drives exterior walls, roofs, windows, and the airtightness of the envelope.
PG-35
Boundary condition
Greenhouse gas target
This framework condition sets the limit for grey energy and greenhouse gas emissions from construction, separate from operational energy. The target drives material choice for every component type.
PG-38
Boundary condition
Sound insulation
This framework condition sets whether the minimum requirements under SIA 181 apply, or increased or special requirements. It drives partitions, slabs, and doors between dwellings or units.
PG-33
Boundary condition
Earthquake
This framework condition sets the structure class under SIA 261 and, in a renovation, how far the existing structure is upgraded under SIA 269/8. It matters mainly when the client raises it or decides the degree of upgrading.
PG-11
Boundary condition
Construction method & prefabrication
This framework condition determines whether the construction method remains open, is designed conventionally, or targets a high degree of prefabrication in timber, steel, or concrete. This choice determines when contractors must be involved, interfaces resolved, and shop, production, and assembly information provided.
PG-12
Boundary condition
Security / critical infrastructure
This framework condition determines how strictly information and building security are handled for critical infrastructure: which CDEs are allowed and whether security-critical areas and building security measures must be managed and checked on a model basis.
PG-08
Boundary condition
Procurement strategy
This framework condition determines the procurement route: engaging designers directly, a competition, design-build, or IPD. Each route places different demands on foundations, models, and bids.
PG-41
Boundary condition
Construction during operation
This framework condition sets whether the building stays in use during construction. It drives phasing, temporary measures, decant space, and site logistics with separate routes for operation and construction.
PG-04
Boundary condition
Facility management
This framework condition determines who operates the building and with which systems: space and equipment lists, managed objects in the 3D model, or a COBie import. That decision determines which information must be handed over at the end of the project.
PG-13
Boundary condition
Dwelling mix
The room counts on offer decide which household sizes the building can house. The number per dwelling type follows in the room programme.
PG-14
Boundary condition
Financing
The form of financing decides whether dwellings are let, sold on their own, or held together with the building. Access, ancillary rooms, and the interface to sale or letting depend on it.
PG-16
Boundary condition
Workplace model
The workplace model and the number of workstations determine the office area, the desk-sharing ratio, and the need for retreat and meeting rooms.
PG-17
Boundary condition
School levels
The school level and the number of learners determine classrooms, specialist rooms, break areas, and escape routes.
PG-21
Boundary condition
Product range
The product range and the sales area determine refrigeration, deliveries, storage, and hygiene requirements.
PG-22
Boundary condition
Service model
The service model and the number of seats and meals determine kitchen, serving, storage, and dining room.
PG-19
Boundary condition
Room mix
The room mix decides which guests the house can take in. The number of rooms and beds determines floor area, bathrooms, and housekeeping effort.
PG-20
Boundary condition
Hall sizes
Hall sizes and the number of audience places determine foyer, escape routes, toilets, and cloakroom. They also decide whether parallel events and splitting the hall are possible.
PG-23
Boundary condition
Seating
The seating decides hall shape, chair storage, escape route widths, and how quickly the hall is reset.
PG-24
Boundary condition
Level of care
The level of care and the number of beds, treatment places, and operating theatres determine wards, diagnostics, building services, and logistics.
PG-25
Boundary condition
Process
The process and the output determine hall height, loads, material flow, and the number of workstations.
PG-26
Boundary condition
Storage type
The storage type and the number of pallet places determine hall height, racking, docks, and conveyor systems.
PG-27
Boundary condition
Hall type
The hall type and the number of courts, water areas, and spectator places determine spans, divisibility, changing rooms, and escape routes.
PG-29
Boundary condition
Laboratory type
Wet and dry labs differ in water and drainage connections, ventilation, and surfaces.
PG-28
Boundary condition
Safety level
The biosafety level (BSL) and the number of lab workstations and fume hoods determine access, ventilation, pressure cascades, and wastewater.
PG-42
Boundary condition
Fume hood density
Fume hood density determines extract airflow, shafts, and how deep the lab workstations are.
PG-30
Boundary condition
Availability class
The availability class according to EN 50600 and the IT load determine redundancy of power and cooling, plant areas, and maintenance routes.
PG-31
Boundary condition
Mode of transport
The mode of transport and peak-hour passengers determine platform lengths, waiting areas, passenger flows, access, and escape routes.
PG-32
Boundary condition
Vehicle mix
The vehicle mix and the number of parking spaces determine ramps, aisles, charging infrastructure, and fire protection.
PG-15
Boundary condition
Refit frequency
How often spaces, equipment, and installations are refitted decides how current the as-built data must be in operation. The more often the building is refitted, the more facility management use cases are preselected.
PG-18
Boundary condition
Fit-out state at handover
The fit-out state at handover sets where the base build ends and the tenant fit-out begins. Cost interfaces and building services per tenant unit depend on it.
USE-TE
Use
Building services
Rooms for building services, energy and utility connections.
USE-WH
Use
Housing
Permanent residence of households. Reference quantity: number of dwellings.
USE-WR
Use
Work
Office and administrative work by staff. Reference quantity: number of workstations.
USE-BI
Use
Education
Teaching and learning of pupils and students, for example in schools and universities. Reference quantity: number of pupils or students.
USE-VK
Use
Retail
Sale of goods to customers. Reference quantity: sales area (m²).
USE-GA
Use
Food service
Preparing and serving food and drink to guests. Reference quantity: number of seats, meals served.
USE-BH
Use
Accommodation
Temporary overnight stay of guests, for example in hotels. Reference quantity: number of rooms.
USE-VS
Use
Assembly and culture
Gathering of audiences for events, culture and worship. Reference quantity: number of audience places.
USE-HE
Use
Healthcare
Examination, treatment and care of patients. Reference quantity: number of beds.
USE-PR
Use
Production
Manufacturing and processing of goods. Reference quantity: output per year.
USE-LO
Use
Warehousing and logistics
Storage, handling and distribution of goods. Reference quantity: number of pallet places.
USE-SP
Use
Sport
Individual and team sports, for example in halls, pools and facilities. Reference quantity: number of courts or hall units.
USE-LA
Use
Laboratory and research
Experimental research and analysis. Reference quantity: number of lab workstations.
USE-RZ
Use
Data centre
Operation of IT infrastructure. Reference quantity: IT load (MW).
USE-VE
Use
Passenger transport
Handling of travellers and their waiting time, for example in station halls, terminals and waiting areas. Reference quantity: passengers per peak hour.
USE-PK
Use
Parking
Parking of vehicles, for example in multi-storey car parks, garages and parking spaces. Reference quantity: number of parking spaces.
USE-ER
Use
Circulation
Gross volume of horizontal and vertical circulation.
USE-KL
Use
Basement
Gross volume of the basement with compartments and circulation.
BES-OWNER-CDE
Use case
Procure the CDE through the client
Procure the common data environment directly through the client so that control of the data and project access remain intact in the event of insolvency or dispute. Delegate its administration to the project lead.
BES-EXISTING-SITE
Use case
Procure the spatial reference and terrain
Procure the spatial reference and terrain as a binding design basis so that every discipline model uses the same coordinates, elevations, and parcel information.
BES-EXISTING-POINT-CLOUD
Use case
Capture the existing building as a point cloud
Capture the built condition early as a georeferenced point cloud without rebuilding a complete existing-condition model before the concept direction is clear.
BES-DESIGNER-PROCUREMENT
Use case
Procure a design team with professional and digital expertise
Procure planning services against the required capabilities, results, and data deliveries instead of ordering BIM wholesale as an additional working method.
BES-EXISTING-STRUCTURE
Use case
Model the building and structural shell for the chosen concept
Once the concept direction is clear, the client orders a georeferenced existing-condition model of the building and structural shell, limited to the areas relevant to the concept, so that conversion, deconstruction, or extension rest on checked existing-condition information and no unnecessary areas are paid for.
BES-EXISTING-BUILDING-MEP
Use case
Procure the existing structural shell, fit-out, and MEP model
Procure a coordinated existing-condition model of the structural shell, fit-out, and MEP so that conversion and change of use rely on known components, equipment, and networks.
BES-EXISTING-CIRCULARITY
Use case
Procure existing-condition information for circularity
Procure circularity information as a targeted extension of the existing-condition model so that reuse, remediation, and recovery can be assessed early.
BES-ROOM-PROGRAM
Use case
Formulate the room programme for designer procurement and competition
Define rooms and their requirements in a structured form as part of the order so that every designer works from the same stable data basis from day one.
BES-FUNCTIONAL-BRIEF
Use case
Clarify operational and functional foundations through test planning
Test operations, functions, and areas spatially before procurement without predetermining the later building solution.
BES-CONCRETE-TENDER
Use case
Provide the basis for the concrete tender
The client orders from the structural design team a model with verifiable concrete quantities and the tender-relevant information on concrete grade, reinforcement, and surface, so that the specification for concrete and reinforced concrete works is based on the same quantities as the design.
BES-FLOORING-TENDER
Use case
Provide the basis for the flooring tender
The client orders from the architecture team a room-by-room flooring schedule with covering type, area, and perimeter from the model, so that quantities in the specification match the design and do not have to be determined again from drawings.
BES-FIRESTOP-TENDER
Use case
Provide the basis for the firestop tender
The client orders from the design team a checked firestop schedule with an unambiguous link to each opening, so that firestops are tendered with real quantities and types instead of as a percentage of construction cost.
BES-ELEMENT-TENDER
Use case
Prepare the tender from component types and quantities
The client orders from the design team a trade-structured tender whose items trace back to component types and model quantities, so that offers can be compared with the cost calculation and post-calculation needs no new quantity take-off.
BES-ABSTRACTBIM-COMP
Use case
Evaluate competition entries with a room model
Evaluate competition entries comparably with minimal modelling effort and focus detailed development on one aspect that is critical to the brief.
BES-DESIGN-BUILD
Use case
Procure design-build services with a binding offer
Procure design and construction together on a functionally clarified basis and compare the proposed solution, scope, and offer price consistently.
BES-WINDOW-TENDER
Use case
Provide the basis for the window tender
The client orders from the architecture team a verifiable window schedule from the model so that the window tender contains complete quantities and requirements and queries and variations are avoided.
BES-DOOR-TENDER
Use case
Provide the basis for the door tender
The client orders from the architecture team a verifiable door schedule from the model so that the door tender contains complete quantities and requirements and queries and variations are avoided.
BES-IPD
Use case
Procure IPD services against a functional base reference and reference costs
Procure design and construction under an IPD model against a shared functional base reference and market-indexed reference costs, tie fees to that reference, and settle outperformance against it after project completion.
BES-DRYWALL-TENDER
Use case
Provide the basis for the drywall tender
The client orders from the architecture team a verifiable overview of types, quantities, and reinforcements for non-load-bearing interior walls, so that the drywall tender contains complete quantities and fire and acoustic requirements and variations during construction are avoided.
BES-SEISMIC-MEP
Use case
Tender installation suspensions as a separate trade
Tender suspension of building services early as a separate trade so that design, coordination, and installation are clearly owned by one specialist contractor.
BES-TIMBER-CONTRACTOR
Use case
Procure the timber contractor early
The client procures a timber contractor after the study or preliminary design and involves it in the design, so that the construction is designed only once and to suit the contractor's production and assembly system.
DES-FURNITURE
Use case
Plan the furnishing and procure the furniture
Represent furniture in the model so that options, furniture schedules, and spatial requirements can be coordinated early and reused reliably for procurement.
BES-ELEVATOR-EARLY
Use case
Tender the elevator installation early
The client tenders the elevator installation early, once the building permit has been granted, and so obtains binding shaft and installation parameters before floor plans, structure, and foundations are developed further, avoiding late redesign.
BES-MASONRY-TENDER
Use case
Provide the basis for the masonry tender
The client orders from the architecture team a verifiable overview of masonry wall types and quantities, so that the masonry tender contains correct net areas and fire and acoustic requirements and variations are avoided.
BES-STEELWORK-TENDER
Use case
Provide the basis for steelwork tendering
The client orders from the design team a steelwork component schedule with locations and principal dimensions from the model, so that the steelwork tender has verifiable quantities without paying twice for shop design.
DES-DRYWALL-REINF
Use case
Plan drywall reinforcement
Plan reinforcement for wall-mounted fixtures explicitly so it can be tendered and installed before drywall partitions are closed.
BES-TILING-TENDER
Use case
Provide the basis for the tiling tender
The client orders from the architecture team a room-by-room quantity overview of floor and wall tiling from the model, so that tendering and invoice checking rest on the same traceable quantity basis.
CON-ROOM-LABEL
Use case
Manage fit-out room by room with a checklist
Keep the fit-out steps for each room in a shared checklist so that trades work to a takt and the status of every room is visible on site.
BES-PAINTING-TENDER
Use case
Provide the basis for the painting tender
The client orders from the architecture team a room-by-room quantity overview of painting areas from the model, so that tendering and invoice checking rest on the same traceable quantity basis.
CON-REINF-EXEC
Use case
Reinforcement execution from model
Prepare reinforcement and edge strips from the formwork and reinforcement model for construction execution.
BES-PLAN-BOX
Use case
Procure plan and model stations
Make current drawings, models, and project data directly usable on every active storey, at the place of work.
CON-FASTEN-SUSP
Use case
Fastening and suspension from model
Plan fastenings and suspensions on the basis of the coordinated structural and MEP models so that they do not have to be improvised on site.
BES-SITE-WLAN
Use case
Procure temporary site Wi-Fi
Procure temporary Wi-Fi amplifiers so that tablets reach the project platform in every work area, including basements without mobile reception.
CON-PRECAST-ORDER
Use case
Precast concrete parts ordering from model
Provide precast concrete parts from the structural model for ordering and delivery planning.
BES-ICE-SESSION
Use case
Order an ICE session
Order an ICE session (Integrated Concurrent Engineering) as a targeted way of working to cut the latency of decisions. It is not a coordination meeting under a new name and only pays off on extremely large or extremely urgent projects.
CON-SHL-BWP
Use case
Create formwork and reinforcement plans
Derive formwork and reinforcement plans for concrete execution from the structural model.
CON-ROBOT-LAYOUT
Use case
Set out the fit-out robotically on the structural slab
Derive the layout file for robotic slab marking directly from the architecture model and print it on the structural slab - so fit-out can start without manual layout errors.
CON-PROGRESS-DOC
Use case
Document construction progress with 360° captures
Record construction progress on a route repeated every week and compare it with the schedule.
CON-FINAL-MEASUREMENT
Use case
Determine final quantities for contractor accounts from the model
Derive final quantities from the updated construction model so that contractors' final accounts can be checked and approved faster.
CON-DEFECT-MGMT
Use case
Capture and manage defects with room QR codes
Capture defects directly at the affected location using a room QR code so that each report is assigned unambiguously without searching a drawing or navigating through an app.
DES-ELEMENT-COST-EARLY
Use case
Calculate element-based costs in early project phases
Combine component quantities and early unit rates into a traceable cost forecast while constructions and build-ups are not yet fully defined.
DES-ABSTRACTBIM-BPS
Use case
Derive the basis for heating demand verification to SIA 380/1 from the model
Derive the basis for heating demand verification to SIA 380/1 from the architecture model without manually remodelling the thermal envelope.
DES-ELEMENT-COST-LATE
Use case
Calculate element-based costs in late project phases
Develop the early forecast into a detailed cost calculation using calculated component types, refined quantities, and type-specific unit rates.
DES-APT-SCHEDULE
Use case
Prepare apartment schedule
Derive the apartment schedule from gross volumes and net spaces and update it reliably when the design changes.
DES-URBAN-MASS
Use case
Create the urban design mass study
Model and evaluate gross volumes by storey so that urban design options and metrics can be compared directly.
DES-PARCELS
Use case
Make the affected parcels visible
Represent parcels relevant to building law in the model so that boundaries, easements, and cadastral references remain verifiable at all times.
DES-MODEL-VIS
Use case
Create visualizations from the model
Create visualizations manually or with generative AI from a fit-for-purpose geometric basis without overloading the design and construction models with purely visual detail.
DES-CEILING-MIRROR
Use case
Coordinate suspended ceilings
Represent suspended ceilings in the model from early room assignment through construction-ready layer modelling so that fit-out and MEP can be coordinated reliably.
DES-FACADE
Use case
Maintain the facade in the model
Maintain the building envelope in the model - simple build-ups as a multi-layer component, complex build-ups with individually modelled facade layers.
DES-LIGHTING-COORD
Use case
Coordinate lighting concept and fixture design
Deliberately bring together the lighting concept, architecture, and technical fixture design so the approved design intent is implemented correctly in the electrical or lighting designer's model.
DES-BASIC-PIPING
Use case
Coordinate drainage and wastewater early
Coordinate drainage and wastewater early in the model - before clashes in risers and below the base slab trigger costly design changes.
DES-FLOORING
Use case
Plan floor build-ups
Model floor build-ups as areas so finish, subfloor, joints, and quantities can be evaluated reliably for execution.
DES-LAYOUT
Use case
Plan the layout with schematic floor plans
Model the layout with spaces only and derive schematic floor plans - change walls with few clicks.
HOV-FM-MIN
Use case
Hand over minimal operational data as lists
Deliver space, door, and window lists plus FM-relevant building services as structured data at handover to the operator - without full 3D plant modelling.
DES-DOOR
Use case
Derive the basis for door planning
Derive the door-design basis from the model so that door schedules and discipline coordination do not rely on scattered individual details.
HOV-FM-3D
Use case
Hand over managed objects in the 3D model
Agree with the operator which objects they actually manage - and hand over only those with the agreed master data and documents in the 3D model.
DES-PARKING
Use case
Verify parking spaces
Represent and evaluate parking spaces in the model so that parking verification can be kept aligned with the design and traffic study.
DES-UNDERFLOOR-HEATING
Use case
Provide the basis for underfloor heating
Bring together space, floor-build-up, and heating-load information early for underfloor-heating design.
HOV-COBIE
Use case
Hand over operational data in COBie format
Hand over operationally relevant master data so that the operator can check it in the target system and import it using the open COBie format.
HOV-NATIVE
Use case
Hand over native models for long-term use
Package and check native discipline models so that they can still be opened, exported, and, where required, maintained years later.
HOV-PRODUCT-PASS-GTIN
Use case
Link the product passport via GTIN
Link product-passport information unambiguously to installed product types by GTIN without duplicating the complete manufacturer data in the model.
DES-GFA
Use case
Determine storey floor areas
Derive floor areas from the space model so that planning-law and economic metrics remain aligned with the design state.
DES-SANITARY-FIXTURE-COORD
Use case
Coordinate sanitary fixtures
Coordinate sanitary fixtures jointly, from first placement through to detailed plumbing design, so that connections and service linings match the approved locations and dimensions.
HOV-PRODUCT-PASS-SERIAL
Use case
Link the product passport via serial number
Assign product-passport information to an individual installed product by GTIN (Global Trade Item Number) and serial number, keeping its individual life cycle traceable.
DES-MATERIAL-PASS
Use case
Create the material passport for urban mining
Anchor materials, detachability, and reuse potential in the model - so building material passports and LCAs are possible without manual re-entry.
DES-KV
Use case
Determine the construction volume
Derive construction volume from gross volume, net spaces, and air spaces so material use can be compared already in early phases.
DES-LCA
Use case
Calculate the life-cycle assessment
Carry component quantities, materials, and product class so LCA and grey energy via KBOB are possible without parallel quantity lists: early via the product class, later refined by the calculated type.
DES-USAGE-AGREEMENT
Use case
Visualize the structural usage agreement room by room
Record usage and structural requirements from the usage agreement per space in the model and derive readable visualizations from them.
DES-MEP-USAGE-AGREEMENT
Use case
Visualize the MEP usage agreement room by room
Record agreed room conditions and usage assumptions in the model and present them in readable thematic plans.
DES-SIA416
Use case
Verify areas to SIA 416
SIA 416 area verification from the space model - derive the area class from the standardized room use.
DES-D0165
Use case
Verify areas to SIA D0165
Derive the SIA D0165 area verification from the space model so that area classes and uses can be evaluated and checked traceably.
DES-PLANNING-INTERFACE
Use case
Visualize design interfaces
Carry design responsibility per component in the model and colour it - forgotten parts at design interfaces become visible.
DES-EBKP-H
Use case
Calculate the eBKP-H classification
Derive eBKP-H codes for major architecture and MEP positions from a few model properties - instead of classifying by hand.
OPR-SIGNAGE-ROOM
Use case
Maintain signage room numbers
Maintain and update signage room numbers in operation - separate from the technical planning room number.
DES-DRAWINGS
Use case
Derive plans from the model
Derive drawings from the 3D model and use them to check that geometry and components are complete and consistent with the design.
OPR-FM-ARCH
Use case
Maintain IFC models during alterations
Extract an alteration area from the approved overall IFC model in a controlled manner and reinsert it after completion - without gaps, duplicates, or conflicting model revisions.
DES-FIRE-CONCEPT
Use case
Create the fire protection requirements model
Keep the approved fire protection concept as a requirements model instead of a fire protection plan, so requirements are assigned unambiguously to the components and can be checked when the design changes.
OPR-FM-PC
Use case
FM with a classified point cloud
Capture the completed asset as a classified point cloud and use it directly for FM processes - without maintaining a complete existing-condition model.
DES-PHYSICS
Use case
Create the building physics requirements model
Translate the approved building physics concept into a spatially assigned requirements model so sound and thermal insulation can be checked unambiguously and continuously in the architecture model.
OPR-FIRESTOP-MAINT
Use case
Manage firestops in operation
Permanently identify, inspect, and update firestops during alterations so that the required fire resistance is maintained in operation.
DES-PERMIT
Use case
Prepare the building permit application
Compile the building permit application from the coordinated design state so that forms, evidence, and permit drawings are complete and consistent.
DES-SOUND-SIA181
Use case
Derive SIA 181 sound insulation requirements from room use
Set the noise load and noise sensitivity of every room and derive the sound insulation requirement of every separating element from them, so missing or too low requirements between usage units show up before the tender.
DES-WALL-REQUIREMENTS
Use case
Combine wall requirements from discipline reports
Combine fire protection and building physics requirements for each wall to create unambiguous requirement profiles and suitable wall types.
OPR-BUILDING-PERFORMANCE
Use case
Optimize building operation during the first years
Support building operation during the first years with actual use and measurement data so deviations from the operating concept are identified and effective optimizations are demonstrated.
DES-MEP-SCHEM
Use case
Develop MEP schematics
Develop MEP system and riser schematics and formally approve them before construction.
DES-FIRE-MATRIX
Use case
Develop the fire cause-and-effect matrix
Formally approve the fire cause-and-effect matrix for detectors, dampers, actuators, and suppression equipment before construction.
COM-QR-STAKEHOLDER-INFO
Use case
Digital resident information
Keep residents informed continuously via letter or notice with a QR code about measures and site installation, so those affected can inform themselves instead of guessing or complaining.
DES-TRAFFIC
Use case
Check the requirements from the traffic study
Continuously check traffic study requirements against the model - parking and turning radii stay aligned with the planning status.
COM-STAKEHOLDER-DIALOG
Use case
Neighbourhood and stakeholder dialogue
Involve affected neighbours and authority representatives in a structured way before submission, so objections surface early rather than only in the formal objection procedure.
DES-UVP
Use case
Develop the environmental impact report
Prepare the environmental impact assessment from the current design state so that impacts can be demonstrated consistently to authorities and in the building application.
QAS-URBAN-AR
Use case
Assess the urban design on site with augmented reality
Assess the volume model and the planned trees on site with AR glasses, so urban design decisions are not taken on a figure-ground plan that omits the third dimension and the vegetation volume.
QAS-COORD-ZONE
Use case
Plan coordination zones
Define coordination zones in the model and assign them to meetings so that not every model has to be checked against every other model.
DES-HUMUS
Use case
Determine topsoil quantities
Represent topsoil as a layer that can be designed, so that stripping, reinstatement, and surplus quantities can be evaluated for cost and construction sequencing.
QAS-EARLY-COORD
Use case
Coordinate architecture and building services early
Align concept and feasibility early in the model - comparable to a sketch design, without execution detail.
DES-TERRAIN
Use case
Check the terrain and the building connections
Represent the designed terrain in the model so that connections, drainage, and height references to the building can be checked.
QAS-MEP-DETAIL
Use case
Architecture - building services coordination in late design stages
Coordinate building services in construction-ready detail from the building-design phase onward so that clashes, connections, and spatial conditions can be checked before construction.
QAS-ARCH-STRUCT-ADOPT
Use case
Adopt structural design in the architecture model
Adopt the coordinated dimensions of the coarse structural components in the architecture model while no detailed structural model exists yet.
QAS-EXCL-ZONE
Use case
Define exclusion zones
Keep the structural engineer's binding exclusion zones as planning boundaries so that architecture and building services leave those volumes clear.
DES-ARCH-MEP-COORD
Use case
Coordinate architecture and building services
Coordinate MEP routes, equipment, and space requirements with architecture and update both discipline models consistently.
QAS-ARCH-STRUCT-COORD
Use case
Coordinate architecture and structure
Coordinate load-bearing components between the architecture and structural models so that geometric deviations are detected before construction and do not have to be maintained twice.
DES-EMBED-REINF
Use case
Coordinate embeds and architectural components with reinforcement
Coordinate embeds and cast-in architectural components with reinforcement before concrete placement and maintain them as binding objects in the formwork and reinforcement model.
DES-STRUCT-MEP-OPENINGS
Use case
Adopt MEP openings in the structural model
Coordinate MEP opening requirements with structural engineering and, once approved, adopt them as binding openings in the structural model.
QAS-SPECIAL-ROOM-USER
Use case
Align special rooms with the users
Sketch special rooms roughly in the model and coordinate them with future users before accurate modelling begins in the overall model. The aim is to obtain the decisions that give planning certainty.
DES-COMPLEX-ASSEMBLY
Use case
Plan complex assemblies and intermediate states
Visualize and assess assembly options and temporary construction states with simplified models before they cause conflicts on site.
DES-STRUCT-MASONRY
Use case
Adopt main-contractor masonry in the structural model
Coordinate non-load-bearing interior masonry walls executed by the main contractor with structural engineering and adopt them as binding objects in the structural model.
QAS-DET-REF
Use case
Locate standard details in the model and check for gaps
Locate in the 3D model where each standard detail applies and check that everything is detailed, before gaps only show up during execution.
QAS-OUTLET-USER
Use case
Obtain user approval for outlet types
Coordinate recurring outlet types and their typical locations with users so electrical design is based on clear decisions without requiring approval for every individual outlet.
DES-CRIT-INSERT
Use case
Keep critical areas as an insert model
Do not develop security-critical areas in the federated overall model; keep them in a separate insert model with restricted access.
QAS-DECISION-VIS
Use case
Visualize decisions and their impacts
Visualizations help design teams make decisions and their impacts spatially understandable and reach binding decisions in good time.
QAS-FIRE
Use case
Check fire resistance on components
Automatically check the architecture model against the approved fire protection requirements model so deviations become visible after every relevant design change.
QAS-ACOUSTIC
Use case
Check sound and thermal insulation on components
Automatically check the architecture model against the approved building physics requirements model so sound and thermal insulation deviations become visible after every relevant design change.
QAS-ELEMENT-PERF
Use case
Check component types against performance requirements
Check wall, slab, window, and door component types against the performance requirements that follow from the chosen framework conditions, so every type demonstrably meets what was ordered.
QAS-INSTALL-PATH
Use case
Verify installation access paths
Carry the installation access paths to be kept clear in the model and prove that equipment can be brought in - before large plant or components force alterations and deconstruction.
QAS-MAINT-SPACE
Use case
Verify maintenance spaces
Maintain clear maintenance spaces in the model and prove them clash-free - before plant becomes unmaintainable.
QAS-VORSATZ
Use case
Verify the area requirement of facing shells
Account for the space required by service linings in the model and verify their impact on floor area - before wet rooms become too small, trigger redesign, or impair lettability.
QAS-DESIGN-REVIEW
Use case
Carry out the design review at the end of the phase
Design review at the end of each project phase - check planning quality and maturity, record open points, and document release for the next phase.
QAS-FURNISHABILITY
Use case
Verify furnishability
Prove furnishability of interior rooms so clients can decide and approve without being able to read plans.
QAS-TREE-PRESERVE
Use case
Verify tree stock to be preserved
Represent trees to be preserved in the model with their crowns and root zones and check for conflicts before construction work puts the existing trees or the permit at risk.
QAS-ROOM-PROGRAM
Use case
Reconcile the room programme with the model
Continuously reconcile the ordered room programme with the model - so it is always clear whether the ordered rooms are still fulfilled.
LAN-SPONGE-CITY
Use case
Verify the sponge-city principle
Model root space, infiltration, and retention in the outdoor area so rainwater stays on site instead of flowing into the sewer, and trees receive a root volume that sustains them over their standing life.
QAS-COST-INTERFACE
Use case
Visualize cost interfaces between base building and tenant fit-out
Before tendering and after every contract change, check that the cost bearers in the model match the split between base building and tenant fit-out agreed in the lease.
QAS-CONSTRAINT
Use case
Check the design against planning-relevant constraints
Make binding external requirements visible early in the model and check the design against them - before options become locked in.
QAS-AWARD-INTERFACE
Use case
Visualize award interfaces
Before each tender is sent out, check that every component is assigned to exactly one procurement package of the agreed breakdown - forgotten parts and overlaps at contractor interfaces become visible.
QAS-HAZMAT-CHECK
Use case
Plan measures for hazardous-material findings
Assign hazardous-material findings to the affected existing components and use them as a basis for planning remediation, deconstruction, and protection measures.
QAS-ACCESS-SIA500
Use case
Verify accessibility to SIA 500
Make deviations from the accessible route visible before the permit submission, instead of discovering them only during the permit procedure.
QAS-SITE-LOGISTICS
Use case
Check site logistics across the construction phases
Plan site logistics volumetrically and keep them current across phases - before ramps, slopes, and space needs surprise on site.
QAS-DAYLIGHT
Use case
Verify daylight provision using glazed areas
Calculate the effective glazed area for each space from the architectural model so that spaces with insufficient daylight are identified before the permit submission.
QAS-FALL-PROTECTION
Use case
Assess fall protection
Fall-protection systems are safety-critical components and require particular care in planning and coordination. Their location, height, connections, and continuous coverage must therefore be assessed spatially at an early stage.
QAS-COST-PLAUS
Use case
Component cost plausibility check
Check the designer's unit prices against schema.pragmaticbim.ch and the cost database - by product class and type.
QAS-CONTRACTOR-DESIGN
Use case
Verify shop and installation design
Verify shop and installation design against the agreed design-relevant interfaces without remodelling the contractor's solution in detail in the architecture model.
QAS-ELEMENT-COST-POSTCALC
Use case
Post-calculate component costs and feed unit rates back
After award and after the final account, check the unit rates of the cost calculation against award and actual costs per component type and keep the checked benchmarks for future projects.
QAS-BENCHMARK
Use case
Benchmark a project against comparable building tasks
Compare a project or its variants with comparable building tasks by indicators, so that deviations from the usual become visible.
QAS-FUND
Use case
Check and verify funding
Identify eligible measures early and maintain traceable evidence through to payment.
QAS-USAGE-AGREEMENT
Use case
Compare usage-agreement requirements with actual values
Compare agreed requirements and verified design values for each space so that structural and MEP deviations become visible before approval.
QAS-BUILD-SEC
Use case
Verify building security measures
Check the architecture model against the approved security concept so that security zones, protection data, and burglary resistance remain traceable.
QAS-FUNCTIONAL-ACCEPTANCE
Use case
Verify building functions at handover
Check the completed solution against the agreed usage scenarios so that building handover records not only visible defects but also confirms the functions the client ordered.
PROJECT
Element
Project
Establishes the shared organizational frame of reference so that discipline models and their content can be assigned unambiguously to the same construction project.
SITE
Element
Planning perimeter
Defines the shared project area so that buildings, property references, and external works can be coordinated consistently in space.
BUILDING
Element
Building
Structures the construction project into clearly identifiable building volumes so that discipline models, storeys, and evaluations can be coordinated by building.
STOREY
Element
Storey
Establishes the shared vertical structure so that spaces and components can be assigned to the same building level across all discipline models.
SURVEY-REF
Element
Survey reference point
Provides a binding position and height reference so that discipline models align correctly and can be set out accurately on site.
SPACE-GROSS
Element
Gross volumes
Provides a consistent basis for massing studies, area and volume evaluations, and urban design decisions.
SPACE-INT
Element
Interior spaces
Links the room programme, area verification, and discipline planning so that use, sizing, and technical requirements can be coordinated for each space.
SPACE-EXT
Element
Exterior spaces
Makes usable exterior areas measurable for area verification, use planning, and coordination between the building and its surroundings.
SPACE-ELEVATOR
Element
Lift
Enables the occupied area to be assigned by storey so that area verification can be maintained correctly.
SPACE-AIR
Element
Air spaces
Prevents non-occupiable volumes from being counted as floor area while providing a spatial reference for building services.
SPACE-PARK
Element
Parking spaces
Enables traceable parking verification and reliable area and traffic planning from the building design phase onward.
SPACE-VORSATZ
Element
Wall lining (usable space)
Makes space and floor-area loss verifiable early so that rooms, especially sanitary spaces, can be sized adequately.
ARC-WALL-EXT
Element
Exterior wall
Exterior walls provide the basis for area and quantity take-off, building physics, and facade coordination.
ARC-SLAB-BALCONY
Element
Balcony
Makes exterior space, the structural concept, and the building envelope jointly verifiable early on and supports reliable permitting and cost decisions.
ARC-SLAB-BASE
Element
Base slab
Makes the building support and load transfer into the ground spatially verifiable early and provides design certainty for basements, waterproofing, and excavation.
ARC-SLAB-FLOOR
Element
Floor slab
Defines the load-bearing separation between storeys early and provides design certainty for room heights, structure, and building services.
ARC-ROOF-FLAT
Element
Flat roof
Makes the structural concept and building enclosure spatially verifiable early and provides design certainty for levels, build-ups, and permitting.
ARC-FOOTING
Element
Footing
Makes the space and location required to transfer loads into the ground verifiable early and prevents conflicts with basements, services, and excavation.
ARC-WALL-INT
Element
Non-load-bearing interior wall
Makes the spatial layout reliably verifiable early on and provides the basis for fire, acoustic, and interior-fit-out coordination.
ARC-WALL-INT-LB
Element
Load-bearing interior wall
Makes load transfer and space separation jointly verifiable early on and provides a reliable basis for structural, fire, and acoustic coordination.
ARC-COLUMN
Element
Column
Makes point load transfers spatially verifiable early and prevents conflicts with the spatial layout, facade, and building services.
ARC-ROOF-PITCH
Element
Pitched roof
Makes the roof form and structural concept spatially verifiable early on and supports reliable permitting and coordination decisions.
ARC-STAIR
Element
Stair
Rough stair geometry for design, coordination, and quantity take-off.
ARC-BEAM
Element
Beam / girder
Makes load-transfer zones visible early and prevents conflicts between the structure, spatial concept, and building services.
ARC-RAILING
Element
Fall protection / railing
Simplified geometry for spatial planning and assessment of permanent and temporary fall protection.
ARC-WINDOW-EXT
Element
Exterior window
Ensures daylight, ventilation, and views and provides a verifiable basis for facade and building-physics design.
ARC-DOOR-EXT
Element
Exterior door
Ensures functional building access and provides the basis for escape-route, facade, and building-physics design.
ARC-OPENING-VOID
Element
Opening / recess (architecture)
Secures the required routes for services and installations and prevents uncoordinated penetrations between architecture, structure, and building services.
ARC-WINDOW-INT
Element
Interior window
Ensures daylight transfer between interior spaces and provides a verifiable basis for spatial and acoustic design.
ARC-DOOR-INT
Element
Interior door / inspection hatch
Ensures functional connections between spaces and provides the basis for escape-route, fire, and acoustic design.
ARC-SHADING
Element
Shading device
Makes external sun protection visible in the model so location, type, and shading are recorded for facade planning and thermal simulation.
ARC-FIRE-ACOUSTIC-SEAL
Element
Firestop / acoustic seal
Separates the installed seal from the opening and makes its type, performance, and quantity verifiable for tendering, construction, and operation.
ARC-CEILING
Element
Suspended ceiling
Ensures coordinated room heights, ceiling design, and building services.
ARC-FLOOR-COV
Element
Interior floor build-up
Provides a reliable basis for level coordination, joint design, tendering, and quantity take-off for interior finishes. Modelled in every room from tendering on; before that and in operation, the floor finish sits on the interior space.
ARC-FLOOR-COV-EXT
Element
Exterior floor covering
Makes exterior finishes verifiable in detail design for quantities, joints, and tendering. Early planning without a modelled covering: FloorCovering (AOF) on the exterior space.
ARC-WALL-CLAD-EXT
Element
Facade cladding
Enables separate design and quantity take-off of the facade surface and improves coordination with connections and openings.
ARC-ROOF-DRAIN
Element
Tapered insulation / roof build-up
Shows early how much build-up height the roof and balcony fall requires. The building height is then fixed for the permit, and pipes in the foundation can be connected to the outlets.
ARC-ROOF-OVERFLOW
Element
Emergency overflow
Shows early where and at what level water leaves the roof when outlets are blocked, so the parapet, facade, waterproofing upstand, and structural load assumptions can be coordinated.
FURN
Element
Furniture
Reveals early whether spaces can actually be furnished for their intended use and are adequately sized.
ARC-FURN-BUILTIN
Element
Built-in furniture / kitchen
Shows early how much space the kitchen and built-in cabinets need and where the connections sit. Shop and installation design can check dimensions and connections against this.
ARC-WALL-CLAD
Element
Interior wall cladding
Enables room-specific design and quantity take-off of surface finishes for tendering and interior-fit-out coordination.
ARC-DRYWALL-REINF
Element
Drywall reinforcement zone
Makes required fixing support spatially checkable before tendering and construction and prevents subsequent daywork.
STR-EXCL-ZONE
Element
Exclusion zone
Keeps required structural volumes clear and prevents costly clashes with architecture and building services.
STR-OPENING-VOID
Element
Opening / recess (structural)
Transfers approved voids into the structural model as binding information so that clashes are avoided and penetrations can be built as planned.
MEP-PROV-VOID
Element
Provision for void
Reserves penetrations in time so structure and building services can be coordinated without later core drilling.
LAN-TREE
Element
Tree
Makes decisions on protection, removal, and new planting spatially verifiable so that the building and external works account for the tree inventory.
MEP-SCH-PIPE
Element
Pipe (schematic)
Reserves main pipework routes in the initial phase and reduces later clashes.
SURVEY-SURFACE
Element
Surface geometry
Provides existing and designed terrain so that connections to the building and earth quantities can be planned in coordination.
ARC-PARCEL
Element
Building-law parcels
Shows early which cadastral parcels the project affects and supports alignment of the planning perimeter and permitting process.
LAN-HUMUS
Element
Topsoil
Makes topsoil quantities verifiable early for cost, so that stripping, reinstatement, and surplus do not appear only at tender.
MEP-SCH-DUCT
Element
Duct (schematic)
Reserves main ventilation routes in the initial phase and reduces later clashes.
ARC-UMG-NEIGHBOR
Element
Surrounding buildings
Represents neighbouring buildings as simple volumes so objection-relevant effects (shadow, views, setbacks) can be checked and documented in the stakeholder dialogue.
MEP-SCH-TRAY
Element
Cable tray (schematic)
Reserves main electrical routes in the initial phase and reduces later clashes.
LAN-RETENTION
Element
Retention volume
Makes retention volume assignable to catchments and the sizing against heavy rain traceable.
MEP-SCH-EQUIP
Element
Plant space (schematic)
Reserves sufficient plant-room space in the initial phase and prevents conflicts with other uses.
MEP-DOWNPIPE
Element
Downpipe
Secures roof and balcony drainage by coordinating routes, connections, and slab penetrations.
ARC-SITE-LOG
Element
Site setup object
Makes the space requirements and sequence of site logistics alignable early and prevents conflicts during construction.
STR-BEAM
Element
Beam / girder detailed
Enables reliable coordination of load transfer, penetrations, and connections through to execution.
ARC-DET-REF
Element
Detail reference
Makes it spatially verifiable where standard details apply and reveals missing or conflicting detail assignments early.
STR-COLUMN
Element
Column detailed
Ensures coordinated load transfer and clash-free placement of adjacent components through to execution.
ARC-DEC-VOL
Element
Decision volume
Makes it spatially verifiable where a decision applies and whether it is still open, approved, or superseded.
ARC-INSTALL-PATH
Element
Installation access path
Ensures large equipment can be transported to its installation location without clashes.
STR-FOOTING
Element
Footing detailed
Provides a reliable basis for coordinating load transfer, excavation, and utility lines.
STR-WALL
Element
Wall detailed
Enables reliable coordination of load transfer, openings, and connections through to execution.
ARC-COORD-ZONE
Element
Coordination zone
Clearly assigns spatial review areas to coordination meetings and prevents unclear responsibilities.
STR-SLAB-FLOOR
Element
Floor slab detailed
Enables reliable coordination of load transfer, openings, and cast-in items through to execution.
ARC-CONSTRAINT
Element
Planning constraint
Makes external requirements spatially verifiable from an early stage and supports quality assurance when checking the design against protection, hazard, and permitting requirements.
STR-SLAB-BASE
Element
Base slab detailed
Ensures coordinated planning of load transfer, waterproofing, and penetrations through to execution.
ARC-MAINT-SPACE
Element
Maintenance space
Ensures plant remains permanently accessible and can be maintained without spatial conflicts.
STR-SLAB-ROOF
Element
Flat roof detailed
Ensures coordinated planning of load transfer, falls, roof build-up, and penetrations.
ARC-MOVEMENT-CLEARANCE
Element
Movement clearance
Makes the areas that must remain clear for accessibility spatially verifiable so conflicts with building elements and furniture are found before the permit submission.
ARC-TURN-RAD
Element
Turning radius
Demonstrates that vehicles can safely use the planned access routes and manoeuvring areas.
STR-STAIR
Element
Stair detailed
Ensures early coordination of the structure, level transitions, and usable flight geometry.
ARC-UMBAU-PER
Element
Alteration area
Makes planned and completed alterations spatially and chronologically traceable in the overall model.
STR-RAMP
Element
Ramp detailed
Ensures early coordination of the structure, level transitions, and required gradient.
STR-REBAR
Element
Reinforcement
Provides unambiguous steel schedules and placing information to reduce execution errors.
STR-EDGE-STRIP
Element
Edge strip
Ensures formwork terminations can be specified, coordinated, and executed unambiguously.
MEP-CHILLER
Element
Chiller
Secures cooling supply by coordinating capacity, plant footprint, and service connections early.
MEP-COOL-TOWER
Element
Cooling tower / free cooler
Secures heat rejection by coordinating capacity, location, structure, acoustics, and water management.
MEP-ELEC-GEN
Element
Backup generator
Secures standby power by coordinating capacity, location, fuel supply, and exhaust routing.
MEP-ELEC-DIST
Element
Electrical distribution board
Represents the distribution hierarchy so loads, feeders, plant space, and accessibility can be coordinated.
MEP-TRANSFORMER
Element
Transformer
Secures the required voltage level by coordinating load, plant space, cooling, and protection requirements.
MEP-UPS
Element
Uninterruptible power supply
Secures critical loads by coordinating autonomy, loads, plant space, and cooling.
MEP-BOILER
Element
Boiler / water heater
Secures heat supply by coordinating capacity, plant footprint, flue route, and service connections early.
MEP-HEAT-EX
Element
District heat substation
Clarifies thermal system separation so substation capacity, connections, and space requirements can be coordinated.
MEP-COMPRESSOR
Element
Compressed air compressor
Secures compressed-air supply by coordinating capacity, location, acoustic protection, and connections.
MEP-GAS-REG
Element
Gas pressure regulator
Clarifies the gas supply interface so pressure level, metering, safety distances, and pipe connections can be coordinated.
MEP-FAN
Element
Fan
Secures the required airflow by coordinating duty, duct connections, acoustic protection, and maintenance access.
MEP-TANK
Element
Tank / separator
Secures the required storage volume by coordinating location, structure, connections, and maintenance access.
MEP-PUMP
Element
Pump
Secures flow and pressure by coordinating duty, connections, location, and maintenance access.
MEP-UNITARY
Element
Unitary equipment / monoblock
Secures compact plant operation by coordinating footprint, service connections, and maintenance zones together.
MEP-COMMS
Element
Communications appliance
Fixes communication device locations so coverage, connectivity, power supply, and finishes can be coordinated.
MEP-COOL-BEAM
Element
Chilled ceiling / beam
Secures room conditioning and coordinates output, water connections, condensation risk, and ceiling layout.
MEP-SPACE-HEATER
Element
Radiator
Secures room heat delivery by coordinating output, connections, placement, and clearances.
MEP-AIR-TERM
Element
Air terminal / grille
Enables air-distribution verification and coordination with ceiling layout and occupied zones.
MEP-AIR-BOX
Element
Air terminal box
Enables demand-based airflow control and secures installation and maintenance space above the ceiling.
MEP-LIGHT
Element
Light fixture
Enables lighting verification and coordination of ceiling layout, power supply, and maintenance access.
MEP-OUTLET
Element
Socket / data outlet
Fixes connection points so use, service routes, and finishes can be coordinated.
MEP-SWITCH
Element
Switch
Fixes control and switching points so electrical function, finishes, and user access can be coordinated.
MEP-DAMPER
Element
Damper
Fixes air isolation and control points so airflow, fire safety, and maintenance access can be coordinated.
MEP-SANITARY
Element
Sanitary terminal
Fixes sanitary fixtures so use, water connections, drainage, and space requirements can be coordinated.
MEP-WASTE
Element
Waste terminal
Fixes drainage points so falls, pipe routes, and sanitary fixtures can be coordinated.
MEP-GAS-TERM
Element
Gas outlet
Fixes gas draw-off points so pipe routes, isolation, and appliance connections can be coordinated.
MEP-FIRE-TERM
Element
Fire suppression terminal
Enables verification of fire-suppression coverage and coordination of the required clearances.
MEP-VALVE
Element
Valve / manifold
Fixes isolation and control points to support operation, hydraulic balancing, and maintenance.
MEP-ALARM
Element
Smoke detector / alarm
Enables verification of fire detection coverage and coordinated placement with finishes and ceilings.
MEP-SENSOR
Element
Sensor
Fixes measurement points so controls, monitoring, and accessibility can be coordinated.
MEP-ACTUATOR
Element
Actuator
Makes control functions coordinable so controls, power supply, and maintenance access are secured.
ARC-DEVICE-SPACE
Element
Device space
Reserves space early for devices that drive room size, structure or connections, so special rooms can be agreed with users before devices are chosen.
MEP-ESCAPE-SIGN
Element
Escape sign
Makes exits and escape directions visible in the model so fire protection and electrical design can check marking, lighting type, and supply together.
CMP-SAN-01
Component
Wall-hung WC
WC with pre-wall installation; fixes space and position relative to the shaft for the floor plan.
CMP-SAN-02
Component
Wheelchair-accessible WC
WC with a lateral transfer area so a wheelchair-accessible bathroom can be verified in the floor plan.
CMP-SAN-03
Component
Washbasin
Single wall-mounted washbasin; shows space and water connection in the bathroom.
CMP-SAN-04
Component
Double washbasin
Washbasin with two bowls for bathrooms used by two people at once.
CMP-SAN-05
Component
Wheelchair-accessible washbasin
Washbasin with knee space and a manoeuvring area in front so it can be used from a wheelchair.
CMP-SAN-06
Component
Level-access shower
Level-access shower in a room corner; fixes the shower area and the floor drain.
CMP-SAN-07
Component
Bathtub
Wall-mounted bathtub; drives the length and width of the bathroom.
CMP-SAN-08
Component
Utility sink
Sink for laundry and utility rooms, used for pre-washing and cleaning water.
CMP-SAN-09
Component
Kitchen sink
Sink set into the worktop; sets where the water and drainage connections sit in the kitchen run.
CMP-KIT-01
Component
Single-row kitchen
Kitchen block along one wall with base units, worktop, sink and a tall cabinet.
CMP-KIT-02
Component
L-shaped kitchen
Kitchen block around a room corner with two legs, sink and a tall cabinet.
CMP-KIT-03
Component
Kitchen island
Free-standing kitchen block with worktop, accessible from all sides.
CMP-KIT-04
Component
Kitchen tall cabinet
Full-height kitchen cabinet, usually for fridge and oven; part of a kitchen block.
CMP-KIT-05
Component
Kitchen wall cabinet
Wall-hung cabinet above the worktop; part of a kitchen block.
CMP-STO-01
Component
Built-in wardrobe
Full-height built-in wardrobe against a wall for clothes and supplies.
CMP-STO-02
Component
Entrance wardrobe
Cupboard at the dwelling entrance for coats and shoes.
CMP-LAU-01
Component
Washer-dryer stack space
Space for a washing machine and tumble dryer stacked, with water, drainage and power connections.
CMP-LAU-02
Component
Washing machine space
Space for one washing machine with water, drainage and power connections.
CMP-LAU-03
Component
Tumble dryer space
Space for a tumble dryer with power and, depending on the appliance, a condensate drain.
CMP-FUR-01
Component
Shelf
Open shelf against a wall for storerooms, cellars and studies.
CMP-FUR-02
Component
Single bed
Single bed with the head against a wall; checks whether bedrooms and guest rooms can be furnished.
CMP-FUR-03
Component
Double bed
Double bed with the head against a wall and access from both sides.
CMP-FUR-04
Component
Dining table
Dining table with a chair zone on both long sides; its width follows the number of seats.
CMP-FUR-05
Component
Sofa
Sofa as the anchor piece of the living room; checks the seating area and the passage.
CMP-FUR-06
Component
Desk
Desk against a wall with a chair zone for working from home.
CMP-DOR-01
Component
Interior swing door
Single-leaf swing door between two interior rooms; its swing keeps an area clear in the room it opens into.
CMP-DOR-02
Component
Interior sliding door
Sliding door in front of the wall or in a wall pocket; saves the swing area in small rooms.
CMP-DOR-03
Component
Dwelling entrance door
Entrance door of the dwelling to the stair core or corridor, with fire, acoustic and burglary requirements.
CMP-DOR-04
Component
French window
Glazed door in the façade to the private outdoor space; provides daylight and access at once.
CMP-WIN-01
Component
Window
Window in the exterior wall; its size and sill set daylight and view.
CMP-PAS-01
Component
Passage
Doorless opening between two rooms of a dwelling, for example between kitchen and living room.
CMP-CLR-01
Component
Turning area SIA 500
Area kept clear for a 180° turn in a wheelchair; makes the SIA 500 check verifiable in the model.
CMP-CLR-02
Component
Manoeuvring area SIA 500
Area kept clear for changes of direction over 45° in a wheelchair, for example in front of doors and fixtures.
CMP-WRK-01
Component
Office workstation
Work desk with a chair zone; counts the workstations an office can take.
CMP-WRK-02
Component
Meeting table
Table with a chair zone all round; its length follows the number of seats in the meeting or conference room.
CMP-WRK-03
Component
Worktop
Fixed worktop against a wall, for example in a copy room, phone booth or nurses' station.
CMP-WRK-04
Component
Workbench
Workbench against a wall with power for workshops, training workshops and maintenance.
CMP-WRK-05
Component
Work table
Free-standing work table for assembly, packing, inspection or studio work, usable from two sides.
CMP-EDU-01
Component
Pupil desk
Two-person desk with a chair zone; counts the seats in classrooms, seminar rooms and study rooms.
CMP-EDU-02
Component
Wall board
Wall board or interactive board on the front wall; sets which way the room faces for teaching.
CMP-SEA-01
Component
Seat row with writing shelf
Fixed seat row with a writing shelf for lecture halls; its depth includes the passage to the next row.
CMP-SEA-02
Component
Chair row
Row of chairs for assembly halls, stands and waiting areas; its width follows the number of seats.
CMP-SEA-03
Component
Bench
Fixed bench against a wall for changing rooms and cloakrooms.
CMP-CNT-01
Component
Reception desk
Desk for reception and customer service, with a staff zone behind and a visitor zone in front.
CMP-CNT-02
Component
Checkout counter
Checkout point in retail with a customer zone in front and a staff zone behind.
CMP-CNT-03
Component
Service counter
Counter for a bar, buffet, kiosk or cloakroom, with a queue in front and a service zone behind.
CMP-STO-03
Component
Filing cabinet
Cabinet for files and work materials against a wall.
CMP-STO-04
Component
Free-standing shelf
Double-sided shelf in the room for libraries and retail; aisles follow from its clear areas.
CMP-STO-05
Component
Lockers
Cabinet run with lockable compartments for changing rooms, locker rooms, parcel lockers and letterboxes.
CMP-STO-06
Component
Pallet racking
Fixed pallet racking with a forklift aisle in front; sets storage capacity and hall height.
CMP-FUR-07
Component
Bistro table
Small guest table with a chair zone all round; counts the seats in cafeterias, restaurants and bars.
CMP-KIT-06
Component
Commercial cooking line
Cooking line of a commercial kitchen with ranges and appliances under the hood; appliances as a black box.
CMP-KIT-07
Component
Dishwashing line
Dishwashing installation with in- and outfeed tables and dishwasher for a commercial kitchen; appliances as a black box.
CMP-SAN-10
Component
Urinal
Wall-hung urinal. Axis spacing to neighbouring urinals is in the fixture spacing matrix.
CMP-SAN-11
Component
Washbasin row
Washbasin top with several bowls for public toilets, changing rooms and shower rooms.
CMP-SAN-12
Component
Shower position
Wall-mounted shower position in a row; for shower rooms in sports, workplaces and hospitality.
CMP-LAB-01
Component
Wall lab bench
Lab bench against a wall with services and a sink; sets the laboratory axes.
CMP-LAB-02
Component
Island lab bench
Double-sided lab bench in the room, with services from above or from the floor.
CMP-LAB-03
Component
Fume cupboard
Fume cupboard for work with hazardous substances, with its own exhaust; modelled as a black box.
CMP-LAB-04
Component
Safety cabinet
Fire-resistant, ventilated cabinet for chemicals and hazardous substances.
CMP-MED-01
Component
Care bed
Care bed with the head against a wall, a care zone on both sides and bed transport at the foot.
CMP-MED-02
Component
Examination couch
Couch for examination and treatment, accessible from one long side and the head end.
CMP-DOR-05
Component
Interior double door
Double or leaf-and-a-half interior door for bed transport, goods and large flows of people.
CMP-DOR-06
Component
Exterior door
Door in the façade for the building entrance, a side entrance or access to plant rooms.
CMP-DOR-07
Component
Gate
Sectional or roller gate in the façade for vehicles and goods.
CMP-DEV-01
Component
Operating table space
Operating table with a zone for the surgical team all round; sets the minimum size of the operating theatre.
CMP-DEV-02
Component
Medical device space
Space for a mobile or fixed medical device, for example an anaesthesia or monitoring unit.
CMP-DEV-03
Component
Imaging device space
Space for an X-ray, CT or MR device with its patient table; drives room size, radiation shielding and load.
CMP-DEV-04
Component
Machine space
Space for a production or workshop machine with its operating and service zone.
CMP-DEV-05
Component
Server rack
Rack for servers and network with an operating aisle in front and a service aisle behind.
CMP-DEV-06
Component
Cooling appliance space
Space for a laboratory or medicine fridge and freezer against a wall.
CMP-PLT-01
Component
Heat generator
Boiler or heat pump in the heating plant room with a service zone in front.
CMP-PLT-02
Component
Storage tank
Hot water or buffer tank in the plant room.
CMP-PLT-03
Component
Chiller
Chiller in the cooling plant room with a service zone along its long side.
CMP-PLT-04
Component
Air handling unit
Air handling unit in the ventilation plant room; its service side needs room for filter changes.
CMP-PLT-05
Component
Pump
Pump or pump set, for example for sprinklers, pressure boosting or heating.
CMP-PLT-06
Component
Main switchboard
Main switchboard against a wall with an operating aisle in front.
CMP-PLT-07
Component
Distribution board
Sub-distribution or meter board against a wall, for example in the meter or communications room.
CMP-PLT-08
Component
Transformer
Transformer in the substation with its operating and installation side.
CMP-PLT-09
Component
Standby generator
Standby generator with a service zone all round, supply and exhaust air and flue.
CMP-PLT-10
Component
UPS unit
Uninterruptible power supply with battery cabinet in the electrical or server room.
CMP-ELE-01
Component
Socket outlet
Wall socket outlet for plugging in appliances in the room.
CMP-ELE-02
Component
Outdoor socket outlet
Splash-proof socket outlet with a hinged cover for outdoor spaces.
CMP-ELE-03
Component
Light switch
Wall switch for the room lighting, usually next to the entrance.
BMP-STEEL
Product class
Steel beam
Horizontal load-bearing member of steel spanning between supports and carrying floor or roof loads into columns and walls. Fabricated in the workshop and erected as a downstand or upstand girder with bolted or welded connections.
CCP-METAL-SHEET
Product class
Metal sheet ceiling
Visible ceiling lining from metal sheets or strips below the load-bearing slab, with a plain or perforated surface. Clipped or screwed onto a suspended metal substructure, with acoustic fleece and insulation laid in the cavity where required.
CLP-STEEL
Product class
Steel column
Vertical load-bearing member of steel transferring floor and roof loads to the structure below. Fabricated in the workshop as rolled, welded, or hollow section and erected on site with bolted or welded connections.
DCP-WOOD
Product class
Wood door system
Door assembly with a leaf of solid timber or wood-based board in a matching frame, closing an access opening in a wall or partition.
FaCP-CERAMIC-VENTILATED
Product class
Ventilated ceramic tile system
Non-load-bearing weather protection layer of ceramic, porcelain, or stoneware tiles and panels set in front of the load-bearing exterior wall. The units are fixed visibly or concealed onto a metal sub-frame so that a continuous ventilated cavity remains between insulation and cladding.
FCP-SUBFLOOR
Product class
Subfloor / leveling layer
Load-distributing and levelling layer between the structural slab and the visible floor finish. Placed as a bonded, floating, or heated screed on separation and impact-sound layers, levelled and cured until ready to receive the covering.
FDP-RAFT
Product class
Raft / base slab foundation
Continuous load-bearing plate under the building footprint that spreads column, wall, and slab loads evenly into the subsoil. Cast in place on a levelling layer with insulation and sealing beneath, reinforced across the full area and locally thickened under concentrated loads.
MTP-ELEC-SOCKET
Product class
Socket outlet
Provides a fixed connection point for supplying electrical power to appliances and equipment at the point of use. Mounted surface or flush in wall, floor, or furniture and connected to a final circuit of the electrical distribution, with earthing and overcurrent protection provided by the supplying board.
MUP-ELEC-TRANSFORMER
Product class
Transformer
Converts the incoming medium-voltage supply to the low-voltage level required for building distribution and feeds the main distribution board.
RAP-BALUSTER
Product class
Metal baluster railing
Fall protection with vertical metal balusters between posts and handrail, closing the edge of floors, stairs, and balconies. Prefabricated frames are anchored to slab edges, treads, or parapets and finished by galvanizing or coating.
RCP-FLAT-BITUMEN
Product class
Built-up / bitumen flat roof
Weatherproofing build-up for flat and low-slope roofs in which several bitumen sheets form the water-bearing layer above the structural deck. The plies are torch-welded or hot-bonded over the insulation with overlapping seams, with separation and protection layers below and above.
SFP-CRANE
Product class
Crane
The lifting machine itself, including mast or carrier, jib or boom, cab, and counterweight. The volume it can reach, the ground it stands on, and a cast foundation are separate concepts.
SRP-STEEL
Product class
Steel stair
Stair flight of steel for vertical circulation between levels, including landings and fixings to the surrounding structure. Stringers, treads of plate or grating, and landings are prefabricated, lifted into place, and bolted or welded to walls and slabs.
SSP-INSITU
Product class
In-situ concrete slab
Load-bearing horizontal element cast in place from reinforced concrete, spanning between walls, beams, or columns. Formwork, reinforcement, and pouring are carried out on site, producing a jointless monolithic plate.
SWP-ORTBETON
Product class
In-situ concrete wall
Load-bearing or non-load-bearing wall cast in place from concrete or reinforced concrete. Formwork, reinforcement, and pouring are carried out on site, producing jointless monolithic wall panels.
WCP-SEAMLESS-COATING
Product class
Seamless wall coating
Visible interior wall finish from a jointless mineral or synthetic coating on a prepared substrate of plaster, concrete, or board. Applied wet in one or more coats and troweled or sprayed to the required surface quality, including primer and levelling layers.
WICP-WOOD
Product class
Wood window system
Window unit with frame and sash from solid or laminated timber, closing a wall or roof opening with an insulating glazing infill. Delivered as a factory-glazed and pre-finished unit, set into the reveal, fixed and sealed against the adjoining construction on the inside and the outside.
BMP-TIMBER
Product class
Timber beam
Horizontal load-bearing member of solid, glued laminated, or engineered timber spanning between supports. Prefabricated to length and connected on site with steel fasteners and beam hangers.
CCP-GYPSUM-BOARD
Product class
Gypsum board ceiling
Closed, jointless-looking ceiling surface from gypsum boards, either fixed directly to the slab or suspended in front of it. Screwed onto a metal or timber substructure, with taped and filled joints ready for painting, and with access panels where services must remain reachable.
CLP-TIMBER
Product class
Timber column
Vertical load-bearing member of solid, glued laminated, or engineered timber transferring floor and roof loads downwards. Prefabricated to length and erected dry on site with steel connectors.
DCP-METAL
Product class
Metal door system
Door assembly with leaf and frame of steel or other metal, usually a sheet-metal shell with an insulating or stiffening core, closing an access opening.
FaCP-NATURAL-STONE-VENTILATED
Product class
Ventilated natural stone cladding
Non-load-bearing cladding of natural stone slabs or stone-faced cassettes carried in front of the load-bearing exterior wall. The slabs are held by undercut or dowel anchors on an adjustable, thermally separated metal sub-frame, with insulation and ventilated cavity behind the stone.
FCP-SEAMLESS-RESIN
Product class
Seamless resin floor
Jointless wearing surface applied in liquid form onto a prepared screed and cured in place. Primer, resin coats, and optional aggregate broadcast or sealer are rolled, poured, or troweled and continue without joints into coving at the walls.
FDP-STRIP
Product class
Strip footing foundation
Continuous footing running below load-bearing walls or lines of columns, spreading linear loads onto a wider bearing area in the soil. Excavated as a trench down to frost-free depth and cast in place in reinforced or plain concrete, with starter bars for the wall above.
MTP-ELEC-LIGHT
Product class
Light fixture
Converts electrical power into light and delivers the illuminance and light quality required for the activities in the space. Mounted surface, recessed, suspended, or on a track and connected to a lighting circuit, with control by switches, dimmers, or presence and daylight sensors.
MUP-ELEC-MAIN-DIST-BOARD
Product class
Main distribution board
Receives the incoming supply and distributes it to sub-distribution boards and main loads, providing the protection, switching, isolation, and metering points at building or site entry.
RAP-GLASS-FRAMED
Product class
Framed laminated glass railing
Fall protection with laminated safety glass infill held in a metal frame or clamping channel. Panes are cut to size in the factory and glazed into the frame, which is anchored to the slab edge or parapet.
RCP-FLAT-SINGLE-PLY
Product class
Single-ply membrane flat roof
Weatherproofing build-up for flat and low-slope roofs in which a single synthetic sheet forms the water-bearing layer above the insulation. The membrane is loose-laid and ballasted, mechanically fixed, or fully adhered, with seams hot-air welded or taped into a continuous skin.
SFP-CRANE-SWING
Product class
Crane swing envelope
Operational envelope of a crane: jib or boom radius, slewing sector, and hook height. Logistics and safety workflows test what the crane covers, independent of the machine that produces the envelope.
SRP-TIMBER
Product class
Timber stair
Stair flight of solid or engineered timber for vertical circulation between levels. Stringers, treads, and risers are prefabricated in the workshop, fitted on site, and finished with a surface treatment.
SSP-PREFAB-CONC
Product class
Prefabricated concrete slab
Load-bearing horizontal element assembled from factory-made concrete units such as hollow-core, double-tee, or flat slab elements. Elements are delivered ready to install, set on the supporting structure, and joined with grouted joints or a structural concrete topping.
SWP-MASONRY
Product class
Masonry wall
Load-bearing or non-load-bearing wall laid on site from brick, block, or natural stone units in mortar. Includes monolithic insulating block systems that combine structure and thermal insulation in a single layer.
WCP-WALLPAPER
Product class
Wallpaper
Thin decorative interior wall covering from paper, non-woven, or vinyl roll goods on a smooth, filled substrate. Adhered over the full surface in strips with butt or overlapping joints, including substrate preparation and lining paper where required.
WICP-WOOD-METAL
Product class
Wood - metal composite window
Window unit with a timber frame on the room side and a metal cover shell on the weather side, closing a facade opening with an insulating glazing infill. Frame and cover profiles are combined and glazed in the factory, then set into the reveal, anchored and sealed against the adjoining construction.
BMP-RC
Product class
Reinforced concrete beam
Horizontal load-bearing member of reinforced concrete acting as downstand or upstand beam within a concrete floor structure. Cast in place with formwork and reinforcement, or set as a precast element and connected monolithically.
CCP-MINERAL-FIBRE
Product class
Mineral-fibre acoustic ceiling
Sound-absorbing ceiling lining from mineral-fibre tiles or boards below the load-bearing slab. Laid into or clipped onto a suspended grid or rail substructure as demountable panels, with edge profiles and cut-outs for luminaires and air outlets.
CLP-RC
Product class
Reinforced concrete column
Vertical load-bearing member of reinforced concrete transferring floor and roof loads to the foundation. Either cast in place with formwork and reinforcement or delivered as a precast element and grouted into position.
DCP-WOOD-METAL
Product class
Wood - metal composite door
Door assembly with timber leaf and frame on the room side and a metal cover shell or metal-faced composite profile on the weather side, closing an access opening in the building envelope.
FaCP-METAL-SHEET-STANDING-SEAM
Product class
Metal sheet standing-seam facade
Non-load-bearing metal skin of profiled sheet or standing-seam bands in aluminium, steel, copper, or zinc in front of the exterior wall. The bands are seamed or clipped onto a ventilated timber or metal sub-frame using sliding clips that accommodate thermal movement.
FCP-CARPET
Product class
Textile carpet
Textile wearing surface on a prepared screed or subfloor, delivering a soft, sound-absorbing walking surface. Supplied as broadloom or tiles and fully adhered, tackified, or loose-laid on the levelled substrate, with seams and edge profiles closed.
FDP-PAD
Product class
Pad / isolated footing
Isolated footing beneath a single column or concentrated load point that spreads the point load onto a sufficient bearing area. Formed and cast in place as a reinforced concrete block, often stepped or tapered, with anchors or starter bars for the column connection.
MTP-ELEC-SWITCH
Product class
Switch
Allows users to switch or dim lighting and power circuits locally in the served space. Mounted surface or flush in the wall at a defined height and wired into the circuit or connected as a control input to the building automation.
MUP-ELEC-SUB-DIST-BOARD
Product class
Sub-distribution board
Distributes power within a floor, zone, or tenancy and provides protection and switching for the final circuits it serves.
RAP-GLASS-POINT
Product class
Point-fixed structural glass railing
Fall protection as an all-glass balustrade in which the laminated safety glass panes are themselves the load-bearing element, without vertical posts. Panes are set on point fixings or clamped in a base channel anchored to the slab edge, with a top rail where required.
RCP-FLAT-LIQUID
Product class
Liquid-applied flat roof
Seamless weatherproofing layer for flat and low-slope roofs, applied in liquid form onto the prepared substrate and cured in place. Resin is rolled, brushed, or sprayed in several coats, usually with an embedded reinforcing fleece, and continues without joints over upstands and penetrations.
SFP-CRANE-PAD
Product class
Crane set-up pad
Temporary bearing surface a mobile or crawler crane stands on, including outrigger pads and load-spreading. Checked for ground bearing.
SRP-RC
Product class
Reinforced concrete stair
Stair flight of reinforced concrete for vertical circulation, usually part of the fire-separated escape route. Cast in place with formwork and reinforcement or delivered as a precast flight and set on acoustic bearings that interrupt structure-borne sound.
SSP-STEEL-COMPOSITE
Product class
Steel deck / composite slab
Load-bearing horizontal element in which profiled steel decking or steel beams act together with a concrete slab. The steel deck is laid as permanent formwork on the steel frame and connected by shear studs to the concrete cast on top.
SWP-RAMMED-EARTH
Product class
Rammed earth wall
Load-bearing or non-load-bearing wall from compacted, untreated earth material placed in formwork. Solid, monolithic construction without additional cladding.
WCP-NATURAL-STONE
Product class
Natural stone wall cladding
Hard-wearing interior wall cladding from natural stone slabs or tiles on a load-bearing wall or lining. Set in adhesive or mortar for thin formats, or mechanically anchored with a cavity for large and heavy slabs, including jointing and edge details.
WICP-PVC
Product class
Plastic / PVC window system
Window unit with multi-chamber plastic frame and sash profiles and an insulating glazing infill, closing a wall opening. Profiles are welded and internally reinforced in the factory, glazed and fitted with hardware, then set into the reveal, anchored and sealed on both faces.
BMP-OTH
Product class
Other or unknown beam
Placeholder for beams whose material or product type is not yet fixed at tender stage, and for composite or masonry beams outside the listed types. Span, loads, and required fire resistance must be stated separately.
CCP-WOOD
Product class
Wood ceiling lining
Visible ceiling lining from solid wood or wood-based panels, boards, or slats below the load-bearing slab. Mechanically fixed on battens or a suspended substructure, with visible or concealed fastenings and acoustic fleece behind perforated or slatted surfaces.
CLP-OTH
Product class
Other or unknown column
Placeholder for columns whose material or product type is not yet fixed at tender stage, and for composite or masonry columns outside the listed types. Structural function, loads, and required fire resistance must be stated separately.
DCP-PVC
Product class
Plastic / PVC door system
Door assembly with plastic frame and leaf profiles, usually multi-chamber sections with internal reinforcement and a panel or glazed infill, closing an access opening.
FaCP-METAL-COMPOSITE-PANEL
Product class
Metal composite facade panel (ACP)
Non-load-bearing facade skin of factory-made sandwich panels with metal faces and a bonded core, hung in front of the insulated exterior wall. The panels are folded into cassettes or trays and mechanically fixed to an aligned metal sub-frame, with defined joints and cavity ventilation.
FCP-LVT
Product class
Vinyl / LVT floor
Resilient wearing surface from vinyl sheet or tile on a prepared screed, delivering a hard-wearing and easily cleaned walking surface. Laid fully adhered or as a click system floating on the levelled substrate, with seams welded or sealed where watertightness is required.
FDP-PILE
Product class
Driven / bored pile foundation
Deep foundation that carries building loads through weak upper soil layers into load-bearing strata by skin friction and end bearing. Piles are driven as precast units or bored and concreted in place, then tied together by pile caps or ground beams that receive the structure above.
MTP-DATA-DATA-OUTLET
Product class
Data outlet
Provides the user-side connection point of the structured cabling and makes network and telecom services available in the space. Mounted surface or flush in wall, floor tank, or furniture and terminated on horizontal cabling running back to the floor distributor, with every port individually identified.
MUP-ELEC-UPS
Product class
Uninterruptible power supply
Bridges supply interruptions and voltage disturbances for critical loads by switching over to stored energy without interruption.
RAP-PERFORATED-METAL
Product class
Perforated or expanded metal railing
Fall protection with perforated sheet or expanded metal infill panels in a metal frame. The prefabricated panels are set into the frame, which is anchored to the slab edge or parapet and then galvanized or coated.
RCP-METAL-SHEET
Product class
Metal sheet roof
Weatherproof outer roof skin from formed metal sheet, fixed on battens, purlins, or boarding above a separation and ventilation layer. Panels are joined by standing seams, clips, or profiled overlaps that allow thermal movement, with flashings at eaves, verges, and penetrations.
SFP-CRANE-FOUNDATION
Product class
Crane foundation
Cast or precast base that holds a tower crane, with anchors or a central ballast block. Removed or left according to the dismantling concept.
SRP-OTH
Product class
Other or unknown stair
Placeholder for stairs whose material or product type is not yet fixed at tender stage, and for stone or composite stairs outside the listed types. Geometry, use, and fire and acoustic requirements must be stated separately.
SSP-TIMBER
Product class
Timber slab / deck
Load-bearing horizontal element with a primary structure of timber joists, ribs, or wood-based panels, usually with sheathing and a separating floor build-up above. Prefabricated as joist or rib-deck modules, set on walls or beams on site, and completed with acoustic layers and ballast fill.
SWP-BLT
Product class
Lightweight concrete panel (BLT) wall
Load-bearing or non-load-bearing wall from prefabricated lightweight-concrete blocks or storey-height panels. Factory-produced and set in place on site, with lower dead load than normal-weight concrete.
WCP-ARTIFICIAL-STONE
Product class
Artificial stone wall cladding
Interior wall cladding from engineered or agglomerate stone slabs with an industrially produced, uniform appearance. Adhered to a levelled substrate or mechanically fixed for large formats, with narrow joints and prefabricated cut-outs and edge profiles.
WICP-STEEL
Product class
Steel window system
Window unit with slender steel frame and sash profiles and a glazed infill, closing an opening in a wall or partition. Profiles are welded or screwed into frames in the workshop, coated, glazed and fitted with hardware, then anchored in the opening and sealed against the adjoining construction.
CCP-SYNTHETIC
Product class
Synthetic ceiling lining
Lightweight ceiling lining from plastic, textile, or synthetic panels or a tensioned membrane below the load-bearing slab. Stretched into perimeter edge profiles or fixed onto a light suspended substructure, with sealed penetrations for luminaires and air outlets.
DCP-GLASS
Product class
Glazed door system
Door assembly whose leaf consists mainly of glass, either frameless with clamped fittings or in a narrow metal frame, operating as a hinged, sliding, or automatic leaf within a glazed screen.
FaCP-TIMBER-VENTILATED
Product class
Timber ventilated facade system
Non-load-bearing timber cladding of boards, slats, or wood-based panels mounted in front of the insulated exterior wall. Fixing is by visible or concealed fasteners onto a battened sub-frame that ensures rear ventilation and all-round drying of the cladding.
FCP-LINOLIUM
Product class
Linoleum
Resilient wearing surface from linoleum on a prepared screed, delivering a hard-wearing walking surface from largely renewable raw materials. Laid as sheet or tile fully adhered onto the levelled substrate, with welded or sealed seams and matching skirting details.
FDP-MICRO-PILE
Product class
Micropile / ground improvement
Small-diameter pile or soil treatment that raises the bearing capacity of the ground or transfers loads on sites with restricted access. Installed with small drilling rigs using grouted steel tendons, injections, or soil replacement, where necessary working from inside existing buildings.
MTP-DATA-WIFI-AP
Product class
WiFi access point
Provides wireless network coverage in the served space and links mobile devices to the cabled network. Mounted on ceiling or wall, normally fed by a single data cable that also carries the power supply, and managed centrally by a controller.
MUP-ELEC-GENERATOR
Product class
Backup generator
Generates electricity on site when the mains supply fails and feeds safety and selected standby loads until normal supply returns.
RAP-CABLE-MESH
Product class
Cable or mesh infill railing
Fall protection with tensioned stainless steel cables or woven mesh infill spanning between posts. Posts are anchored to the structure and the infill is tensioned against them on site, so the posts must be designed for the tension forces.
RCP-TILE-CLAY
Product class
Clay tile roof
Outer roof skin from small-format fired clay units laid in overlapping courses as the rain-shedding surface of a pitched roof. Tiles are hung on battens above counter-battens and an underlay that drains incidental water, and are individually fixed or clipped in exposed areas.
SFP-CONTAINER
Product class
Site container
Standard site container placed for temporary use. Use a more specific concept when the function is known: office, break room, sanitary facility, or lockable store.
SSP-CLT
Product class
Cross-laminated timber (CLT) slab
Load-bearing horizontal element formed by solid mass timber plates that span in one or two directions. Plates are cut to size in the factory including openings and service routes, lifted into position, and screwed along the panel joints.
SWP-PREFAB-CONC
Product class
Prefabricated concrete wall
Load-bearing or non-load-bearing wall from prefabricated concrete elements. Factory-produced, erected and connected on site.
WCP-CERAMIC-TILE
Product class
Ceramic / porcelain wall tile
Water-resistant interior wall finish from ceramic, porcelain, or earthenware tiles on a plastered, board, or concrete substrate. Bedded in thin-bed adhesive and grouted, with a bonded sealing layer, movement joints, and sealed connections in wet zones.
WICP-ALUMINIUM
Product class
Aluminium window system
Window unit with thermally separated aluminium frame and sash profiles and an insulating glazing infill, closing a facade opening. Profiles are cut, joined, and glazed in the factory, then set into the reveal, anchored to the structure and sealed against the adjoining construction.
CCP-METAL-PANEL
Product class
Metal panel ceiling
Ceiling system from linear metal panels or lamellas below the load-bearing slab, with plain or perforated faces and open or closed joints. Clipped onto carrier rails of a suspended substructure, individually demountable, with acoustic fleece and insulation in the cavity where required.
DCP-GATE
Product class
Gate / industrial door
Large-format closure of a vehicle or goods opening, as a sectional, rolling, sliding, folding, or up-and-over leaf with guide tracks and a weight compensation system.
FaCP-FIBER-CEMENT-BOARD
Product class
Fibre-cement board facade
Non-load-bearing mineral board cladding of fibre-cement or reinforced cement panels in front of the insulated exterior wall. The boards are cut to size and riveted, screwed, or concealed-fixed to a metal or timber sub-frame with a ventilated cavity and a defined joint pattern.
FCP-NATURAL-STONE
Product class
Natural stone flooring
Wearing surface from quarried stone slabs or tiles on a prepared substrate, delivering a heavy and highly durable walking surface. Laid in a mortar bed or thin-bed adhesive on the screed, jointed, and finished by grinding, honing, or sealing.
FDP-RETAINING
Product class
Basement / retaining foundation wall
Below-grade wall that carries vertical building loads and at the same time resists earth and water pressure from the surrounding ground. Built as in-situ reinforced concrete, prefabricated elements, or an excavation-support wall left in place, completed on the earth side with sealing, insulation, and drainage.
MTP-DATA-SENSOR-ACTUATOR
Product class
Sensor / actuator (KNX / BACnet)
Captures room conditions or user input and converts automation commands into switching or positioning action on the served equipment.
MUP-DATA-PATCH-PANEL
Product class
Patch panel
Terminates the structured cabling of a distribution area and allows individual links to be cross-connected to active equipment with patch cords.
RAP-TIMBER
Product class
Timber railing
Fall protection with posts, rails, and infill of timber, forming the guarding element at floors, stairs, and balconies. Prefabricated timber parts are fixed to the structure with steel connectors and given a surface treatment matched to the exposure.
RCP-TILE-CONCRETE
Product class
Concrete tile roof
Outer roof skin from small-format concrete or fibre-cement units laid in overlapping courses on a pitched roof. Units are hung on battens above counter-battens and an underlay and are fixed or clipped where wind uplift requires it.
SFP-WHEEL-WASH
Product class
Wheel wash
Installation that cleans vehicle tyres and chassis before they leave the site, so public roads stay free of mud. Includes the basin or spray frame, water feed, and sludge collection at the exit.
SSP-HBV
Product class
Timber - concrete composite slab (HBV)
Load-bearing horizontal element combining a timber plate or rib structure with a concrete topping that takes the compression forces. Both layers are joined shear-resistant by notches, screws, or connectors, with the concrete cast on site or supplied as a prefabricated composite element.
SWP-STEEL
Product class
Steel frame wall
Load-bearing or non-load-bearing wall with a primary steel structure of sections or studs and sheathing or infill layers. Prefabricated frames are erected on site, with insulation and lining added layer by layer.
WCP-WOOD-PANEL
Product class
Wood wall panel
Interior wall cladding from solid wood or wood-based panels, boards, or slats in front of the load-bearing wall. Mechanically fixed on battens or a substructure, with a cavity for insulation, acoustic backing, or services, and with visible or concealed fastenings.
WICP-SPECIAL
Product class
Special transparent opening
Light-transmitting opening product that closes an opening without a conventional frame and sash, for example a glass block field, a translucent panel field, a fixed light, or a glazed hatch.
CCP-METAL-GRID
Product class
Metal grid ceiling
Suspended ceiling from a visible metal grid with removable lay-in tiles or open grid cells below the load-bearing slab. Grid profiles are hung from the slab on adjustable hangers, and tiles are laid in without fixings so that every field can be removed individually.
DCP-SPECIAL
Product class
Special door system
Purpose-made door product for an access opening with requirements beyond a standard leaf and frame, for example a revolving entrance, an airtight or pressure-resistant door, a high-performance acoustic door, a shielding door, or a shopfront entrance assembly.
FaCP-RENDER-ETICS-WDVS
Product class
Render / ETICS facade system
Non-load-bearing bonded external insulation and render system applied directly onto the load-bearing exterior wall without a ventilated cavity. Insulation boards are adhesive-bonded and mechanically anchored to the substrate and then covered with a reinforced base coat with embedded mesh and a finishing render.
FCP-ARTIFICIAL-STONE
Product class
Artificial stone flooring
Wearing surface from cast or agglomerate stone slabs and tiles on a prepared substrate, delivering a stone-like walking surface with consistent format and appearance. Laid in a mortar bed or thin-bed adhesive, jointed, and ground or sealed on site where required.
FDP-WATERPROOF
Product class
Foundation waterproofing / tanking
Sealing system that keeps ground moisture, seeping water, and pressing water away from the buried parts of the building. Executed either as a bonded or loose-laid membrane on slab and wall surfaces or as watertight concrete construction with sealed joints and penetrations.
MTP-VENT-AIR-VALVE
Product class
Supply / extract air valve or diffuser
Delivers supply air to the room or removes extract air from it and distributes the air flow so that draught-free conditions and the required air quality are achieved.
MUP-DATA-NETWORK-SWITCH
Product class
Network switch / rack
Forwards data traffic between the connected end devices and the network backbone and, where required, supplies terminal devices with power over the same cabling.
RAP-PARAPET-SOLID
Product class
Solid parapet
Fall protection formed by a solid concrete or masonry parapet with a coping, taking over the guarding function without a separate railing. Built together with the surrounding structure as cast-in-place concrete, precast element, or masonry, and closed on top by a coping that sheds water.
RCP-SLATE
Product class
Natural slate roof
Outer roof skin from split natural stone plates laid in overlapping courses as the rain-shedding surface of a pitched roof. Slates are nailed or hooked onto boarding or battens over an underlay, with course pattern and headlap set by pitch and exposure.
SFP-FENCE
Product class
Site fence
Hoarding or mesh fence on temporary posts that marks the site boundary, controls access, and screens the works. Gates in the fence are a separate concept.
SSP-HOLZ-LEHM
Product class
Timber - clay slab / deck
Load-bearing horizontal element with timber joists or a timber frame and a heavy clay infill or topping between or above the timber members. Produced as prefabricated panels or filled on site, with the moist clay compacted and dried before the floor build-up follows.
SWP-TIMBER
Product class
Timber frame wall
Load-bearing or non-load-bearing wall with a primary structure of solid timber, glued laminated timber, or engineered wood panels. Prefabricated as frame, stud, or solid timber elements and assembled on site.
WCP-TEXTILE
Product class
Textile wall covering
Soft interior wall covering from textile or fabric surfaces, usually with a sound-absorbing backing layer. Either adhered to the substrate over the full surface or stretched into edge profiles as a fabric-covered element on a substructure.
WICP-SKYLIGHT
Product class
Roof window / skylight
Glazed opening element set into a roof surface, as a pitched roof window, flat-roof dome, or rooflight band with fixed or operable leaves. Delivered as a factory-glazed unit and mounted on an upstand kerb or in the rafter field, connected to the roof waterproofing and vapour barrier with collars and metal flashings.
CCP-OTH
Product class
Other / unknown ceiling covering
Placeholder for ceiling coverings whose product type is not yet fixed or not classified at tender stage. Functional requirements on suspension height, access to services in the ceiling void, room acoustics, fire behaviour, and cleanability must be stated separately.
DCP-OTH
Product class
Other / unknown door
Placeholder for door products whose material, system, and operating type are not yet fixed or not classified at tender stage. Functional requirements for access, operation, separating duty, and connection to the adjoining construction must be stated separately.
FaCP-SYNTHETIC-VENTILATED
Product class
Synthetic ventilated facade panel
Non-load-bearing cladding of synthetic panels such as laminates, plastics, or fibre-reinforced composites hung in front of the insulated exterior wall.
FCP-CERAMIC-TILE
Product class
Ceramic / porcelain tile floor
Wearing surface from fired ceramic tiles on a prepared substrate, delivering a hard, water-resistant, and abrasion-resistant walking surface. Set in thin-bed adhesive on the screed, with grouted joints, movement joints, and a bonded waterproofing layer in wet areas.
FDP-DRAINAGE
Product class
Foundation drainage and protection
System that collects and leads away water from the ground around the foundation and protects the sealing from mechanical damage. Comprises perforated drain pipes in a filter-stable gravel bed, protection and filter layers or drainage composites on the wall, and inspection and discharge points.
MTP-VENT-GRILLE
Product class
Grille
Lets air pass between rooms or between room and duct without active regulation and secures the intended air path for ventilation and pressure balance. Fitted into a wall, door, ceiling, or duct opening as a fixed grille or linear slot, without moving control elements.
MUP-DATA-SERVER
Product class
Server
Provides computing and storage capacity for building-related applications such as automation, access control, or media services. Delivered as rack-mounted hardware in a communications or server room with secured power supply, network connection, and cooling, and commissioned together with the applications it hosts.
RAP-HANDRAIL
Product class
Handrail only
Handrail without infill, giving guidance and support along stairs, ramps, and corridors where no fall protection infill is required. Mounted on brackets to the wall or on posts, with a continuously graspable profile and ends returned to the wall.
RCP-WOOD-SHINGLE
Product class
Wood shingle / shake roof
Outer roof skin from sawn or split timber shingles, shakes, or boards laid in overlapping courses on a pitched roof. Shingles are nailed onto open battens or boarding over a rear-ventilated cavity so that the covering can dry out on both faces.
SFP-GATE
Product class
Gate
Opening in the site enclosure for vehicles or people, including sliding, swing, or barrier gates, with the locking that belongs to the gate itself.
SSP-LIGHTWEIGHT
Product class
Lightweight slab system
Horizontal deck or platform with a light, non-monolithic primary structure of profiles, ribs, or panels carrying limited loads. Assembled on site from prefabricated parts and fixed to the supporting structure, normally without a heavy topping.
SWP-LEICHTBAU
Product class
Lightweight construction wall
Non-load-bearing or lightly loaded wall from a framed or panelised lightweight structure with insulation and sheathing on one or both sides. Built up on site from individual parts rather than monolithically.
WCP-SYNTHETIC-PANEL
Product class
Synthetic wall panel
Robust interior wall cladding from plastic, laminate, or composite panels with a closed, impact-resistant surface. Adhered to a levelled substrate or mechanically fixed on a substructure, with sealed or profiled joints and protective edge and corner details.
WICP-FACADE-UNIT
Product class
Facade glazing unit
Glazed field of a facade system that acts as the window opening, with fixed panes and integrated opening lights or ventilation flaps within a mullion-transom or unitised grid.
FaCP-BIPV-INTEGRATED
Product class
Building-integrated photovoltaic facade
Non-load-bearing facade cladding that additionally generates electricity, with photovoltaic cells integrated into the visible outer layer of the wall build-up.
FCP-PARQUET
Product class
Parquet / engineered wood floor
Wearing surface from solid or multi-layer timber elements on a prepared substrate, delivering a warm walking surface with a renewable wear layer. Laid fully adhered, nailed, or floating on the screed, then sanded and sealed or oiled on site.
FDP-OTH
Product class
Other / unknown foundation
Placeholder for foundation products whose system is not yet fixed or not classified at tender stage. Functional requirements such as bearing capacity, settlement limits, groundwater conditions, and sealing must be stated separately.
MTP-HEAT-RADIATOR
Product class
Radiator
Transfers heat from the heating water into the room by radiation and convection and covers the heat loss of the space. Mounted on the wall or in a floor channel, usually below windows, and connected to flow and return of the heating distribution with shut-off, drain, and a thermostatic control valve.
MUP-VENT-AHU
Product class
Air handling unit / monoblock
Conditions outdoor and extract air for a ventilation zone by filtering, heat recovery, heating, cooling, and where required humidity treatment, and moves the supply and extract air volumes.
RAP-OTH
Product class
Other or unknown railing
Placeholder for railings whose product type is not yet fixed at tender stage, and for special guarding systems outside the listed types. Guarding function, horizontal loads, and infill requirements must be stated separately.
RCP-GREEN-EXTENSIVE
Product class
Extensive green roof
Vegetated covering build-up above a waterproofed flat or low-slope deck, in which a thin substrate layer carries drought-tolerant planting. Root barrier, drainage and filter layers, substrate, and vegetation are laid loose on the membrane and act at the same time as its protection and ballast.
SFP-CANOPY
Product class
Protective canopy
Covered walkway along the public side of the site, with a deck that catches debris and a clear passage underneath. It is not a work scaffold and not the site fence.
SSP-OTH
Product class
Other / unknown slab separator
Placeholder for slab products whose construction type is not yet fixed or not classified at tender stage. Functional requirements such as span, imposed load, fire resistance, and acoustic performance must be stated separately.
SWP-CURTAIN-WALL
Product class
Curtain wall / facade system
Non-load-bearing exterior wall enclosure as a self-supporting system in front of the building structure, with glazed and/or panel infill fields. Carries its own vertical loads and transfers wind loads into the building structure.
WCP-PAINT
Product class
Interior paint finish
Thin-layer visible interior wall finish from paint or coating on plaster, board, or concrete substrates. Applied wet by brush, roller, or spray in primer and finish coats, including substrate preparation, filling, and sanding to the agreed surface quality.
WICP-OTH
Product class
Other / unknown window
Placeholder for window products whose frame material, system, and opening type are not yet fixed or not classified at tender stage. Functional requirements for the opening, the glazing, the operation, and the connection to the adjoining construction must be stated separately.
FaCP-PREFAB-MODULAR-TIMBER
Product class
Prefabricated modular timber facade system
Non-load-bearing facade module manufactured in the factory as a timber-framed element with insulation, air-tight layer, cladding, and often windows already fitted.
FCP-LAMINATE
Product class
Laminate flooring
Wearing surface from board elements with a printed, resin-impregnated decorative top layer on a wood-based core. Laid floating with click joints on an impact-sound and separation underlay over the screed, with perimeter expansion gaps and skirtings.
MTP-HEAT-UFH-MANIFOLD
Product class
Underfloor heating manifold
Distributes heating water to the individual loops of a surface heating system and returns it to the distribution, so that every loop can be shut off and balanced separately.
MUP-VENT-FAN
Product class
Fan
Moves supply, extract, or transfer air through a duct or shaft section and overcomes its flow resistance so that the required air volume is maintained.
RCP-GREEN-INTENSIVE
Product class
Intensive green roof
Vegetated and usable covering build-up above a waterproofed deck, with a deep substrate layer that carries lawn, shrubs, or trees. Root barrier, drainage and water-storage layers, substrate, planting, and paths or terraces are built up on the membrane, usually with irrigation.
SFP-STORAGE
Product class
Storage area
Marked outdoor surface, or a covered but open bay, for pallets, formwork, reinforcement, and similar bulk material. Not a room and not a container.
SWP-ELEMENT-WALL
Product class
Drywall / element partition wall
Non-load-bearing interior wall from drywall, stud-framed, or modular element systems with metal or timber studs and board sheathing. Assembled on site from prefabricated parts, with cavity insulation and integrated services where required.
WCP-OTH
Product class
Other / unknown wall covering
Placeholder for interior wall coverings whose product type is not yet fixed or not classified at tender stage. Functional requirements on surface quality, mechanical loading, moisture behaviour, acoustics, and fire behaviour must be stated separately.
FaCP-PREFAB-MODULAR-METAL
Product class
Prefabricated modular metal facade system
Non-load-bearing facade module assembled in the factory from metal frames with integrated insulation and a finished cladding face. The units are set storey-high in front of the primary structure and anchored on brackets that allow adjustment and thermal separation, with gasketed or sealed joints between modules.
FCP-RAISED-FLOOR
Product class
Raised / access floor
Elevated floor construction that forms a continuous accessible cavity between the structural slab and the walking level. Removable panels rest on height-adjustable pedestals or on a self-supporting cavity build-up and carry the final finish, applied in the factory or laid separately.
MTP-HEAT-FAN-COIL
Product class
Fan coil (heating mode)
Heats room air by drawing it with a fan over a heat exchanger fed from the heating distribution and returning it to the space, so that heat loads are covered with a short response time.
MUP-HEAT-BOILER
Product class
Boiler
Generates heat for space heating or process use and transfers it to the heating circuit at the required flow temperature and flow rate.
RCP-PV-ROOF
Product class
Roof-mounted photovoltaic system
Electricity-generating module array carried by the roof surface, either mounted on a frame above the existing covering or replacing it as the weatherproof layer.
SFP-STORE
Product class
Site store
Enclosed and lockable room or fitted container used as the site magazine. Distinct from an open storage yard and from a container whose function is not specified.
SWP-OTH
Product class
Other / unknown wall separator
Placeholder for wall products whose construction type is not yet fixed or not classified at tender stage. Functional requirements must be stated separately.
FaCP-EXTERIOR-PAINT-COATING
Product class
Exterior paint / protective coating finish
Non-load-bearing coating applied thinly and directly onto the facade substrate, acting as protective and decorative surface rather than as a separate cladding layer.
FCP-OTH
Product class
Other / unknown floor covering
Placeholder for floor covering products whose system type is not yet fixed or not classified at tender stage. Functional requirements such as wear class, slip resistance, impact-sound reduction, moisture exposure, and cleanability must be stated separately.
MTP-COOL-FAN-COIL
Product class
Fan coil (cooling mode)
Cools and dehumidifies room air by drawing it with a fan over a chilled-water or direct-expansion coil and returning it to the space, covering internal and solar cooling loads.
MUP-HEAT-HEAT-PUMP
Product class
Heat pump
Raises heat taken from air, ground, water, or waste heat to a usable temperature for the heating circuit and, in reversible operation, also supplies cooling.
RCP-OTH
Product class
Other / unknown roof covering
Placeholder for roof covering products whose system type is not yet fixed or not classified at tender stage. Functional requirements such as watertightness, admissible roof pitch, thermal performance, walkability, and fire behaviour must be stated separately.
SFP-TRANSFER
Product class
Transfer area
Designated handling point for unloading, reloading, and short-term set-down between transport and the place of use. Includes the space the handling equipment needs, not the storage yard itself.
FaCP-RETROFIT-OVERCLADDING
Product class
Retrofit overcladding system (composite)
Non-load-bearing overlay built over a retained existing facade, adding insulation and a new weather-protecting surface without removing the old wall.
MTP-COOL-CHILLED-CEILING
Product class
Chilled ceiling / beam
Removes heat from the room through cooled surfaces at ceiling level, largely without noise and draught, working purely by radiation and convection or supported by primary air.
MUP-HEAT-DISTRICT-HEAT-SUBSTATION
Product class
District heat substation
Transfers heat from the external supply network to the building heating and hot water circuits, separates the primary and secondary sides hydraulically, and controls the secondary flow temperature.
SFP-BUFFER
Product class
Intermediate storage
Marked area where delivered material waits before it is installed or moved on. It is not the open storage yard, not the lockable store, and not the point where vehicles are unloaded.
FaCP-HPL-PANEL
Product class
HPL / compact laminate facade panel
Non-load-bearing rainscreen cladding of compact high-pressure laminate boards in front of the insulated exterior wall. The boards are fixed with visible rivets or screws, or with concealed rear fixings, to a metal or timber sub-frame that keeps an open ventilated cavity and permits panel movement.
MTP-FW-TAP
Product class
Tap / faucet
Delivers drinking water at the draw-off point in the required quantity and temperature and lets users open, close, and mix the flow. Mounted on the sanitary fixture, on the wall, or on the worktop and connected to cold and hot water pipework with shut-off and, where required, backflow protection.
MUP-COOL-CHILLER
Product class
Chiller
Removes heat from the chilled water or refrigerant circuit and rejects it to the ambient air or a recooling circuit, holding the supply temperature required by the cooling consumers.
SFP-OFFICE
Product class
Site office
Container or temporary building fitted as an office, with workstations, meeting space, and document storage for the site team. Not a break room and not sanitary accommodation.
FaCP-BRICK-SLIP
Product class
Brick slip / tile-hung ventilated facade
Non-load-bearing cladding with a masonry appearance from thin brick slips or small-format tiles in front of the insulated exterior wall, without any load transfer from the building.
MTP-FW-SHOWER
Product class
Shower
Delivers mixed warm water as a spray for body cleaning and lets users set temperature and flow at the point of use. Mounted on wall or ceiling as an exposed or concealed set and connected to cold and hot water pipework and to the shower waste, with a mixer and protection against scalding.
MUP-COOL-FREE-COOLER
Product class
Free cooler
Rejects heat from a water circuit directly to the outdoor air and supplies cooling without mechanical refrigeration whenever outdoor conditions allow, or serves as recooler for a chiller.
SFP-BREAK-ROOM
Product class
Break room
Furnished rest space for workers, with seating and a place to eat. It is neither the site office nor the sanitary unit.
FaCP-OTHER
Product class
Other / unknown facade covering
Placeholder for facade coverings whose product or system type is not yet fixed at tender stage or cannot be classified. Functional requirements such as weather protection, thermal performance, reaction to fire, substrate and fixing principle, and expected service life must be stated separately in the specification.
MTP-FW-WC-FLUSH
Product class
WC flush valve
Releases a measured volume of water to rinse the WC pan and refills the cistern or flush line after every operation.
MUP-FW-PRESSURE-BOOSTER
Product class
Pressure booster
Raises the pressure of the potable water supply so that the required flow pressure is available at all consumers, including upper floors and remote draw-off points.
SFP-SANITARY
Product class
Sanitary facility
Sanitary containers or cabins with WC, washbasins, and where required showers, connected to site water and drainage. Not a break room and not an office.
MTP-WW-FLOOR-DRAIN
Product class
Floor drain
Collects water from the floor surface and discharges it into the waste water pipework, so that the floor stays free of standing water. Set into the floor build-up flush with the finished surface and connected to the waste branch with a water trap and a sealed connection to the floor waterproofing.
MUP-FW-WATER-HEATER
Product class
Water heater / DHW boiler
Heats potable water to the required temperature and holds a reserve so that peak draw-off demand is covered at the taps.
SFP-HAUL-ROAD
Product class
Haul road
Built-up or paved route that carries delivery and site vehicles between the entrance, storage, and the works. Turning places and ramps are separate concepts.
MTP-WW-WC-OUTLET
Product class
WC outlet
Takes the discharge from the WC pan into the waste water pipework and seals the joint between fixture and pipe against water and odour. Formed as a horizontal or vertical connection through wall or floor, with a connector bend or sleeve fitted to the fixture outlet and aligned with the fixed pipe position.
MUP-WW-LIFTING-STATION
Product class
Lifting station
Collects wastewater from drainage points below the backflow level and pumps it above that level into the gravity drain.
SFP-RAMP
Product class
Ramp
Inclined temporary structure or earth ramp that lets vehicles or people change level, for example into an excavation or up to a loading point. Not a haul road and not a turning area.
MTP-WW-SINK-DRAIN
Product class
Sink drain
Drains used water from a sink, basin, or appliance into the waste water pipework and keeps odour from entering the room. Fitted to the fixture outlet with a waste set and water trap and connected to the waste branch, with an additional connection for appliance hoses where required.
MUP-WW-GREASE-SEPARATOR
Product class
Grease separator
Retains grease and oil carried in kitchen or process wastewater before discharge into the public sewer and thereby protects downstream pipes and plant from deposits.
SFP-TURNING
Product class
Turning area
Paved or reinforced surface whose geometry allows delivery vehicles to turn, including the swept path of the design vehicle. It is not the haul road that leads to it and not a ramp.
MTP-SM-GAS-OUTLET
Product class
Gas outlet valve
Forms the draw-off point for gas at the appliance and allows the supply to be shut off manually at the point of use. Mounted on the wall or inside furniture and connected to the gas pipework, with a shut-off device and a tested connection to the appliance by rigid pipe or approved hose.
MUP-SM-COMPRESSOR
Product class
Compressed air compressor
Generates compressed air at the pressure and quality required by the connected consumers and maintains supply from a receiver against fluctuating demand.
SFP-PARKING
Product class
Parking area
Marked area where cars, vans, and site vehicles stand while they are not loading or turning. Distinct from the haul road, the turning area, and the transfer point.
MTP-SM-SPRINKLER-HEAD
Product class
Sprinkler head
Detects heat at ceiling level, opens automatically, and discharges extinguishing water over the protected floor area so that a fire is controlled at its origin.
MUP-SM-GAS-REGULATOR
Product class
Gas pressure regulator
Reduces the gas pressure of the supply line to the operating pressure of the building installation, keeps it constant under varying demand, records the quantity taken, and shuts off the supply in case of a fault.
SFP-SKIP-BAY
Product class
Skip bay
Reinforced bay where skips are placed, filled, and collected, with access for the skip lorry. Not general open storage and not the transfer area for construction materials.
MTP-SM-HOSE-REEL
Product class
Hose reel
Provides a permanently charged water draw-off point with hose and nozzle so that occupants or the fire brigade can fight a fire by hand. Installed as a recessed or surface cabinet in the wall and connected to the fire water pipework through a shut-off valve, with the hose held on a reel ready for immediate use.
MUP-SM-FIRE-PUMP
Product class
Fire pump
Supplies the sprinkler or hydrant network with firefighting water at the required pressure and flow rate as soon as demand is detected, and holds the network pressurised in standby.
SFP-SILO
Product class
Silo
Erected silo with filling and discharge, standing on a prepared base and feeding a mixer or pump. The silo is the storage vessel; the mixing plant and the pump are separate objects.
MTP-FIRE-FIRE-DAMPER
Product class
Fire damper
Closes the duct penetration at a fire compartment boundary in case of fire and prevents fire and smoke from spreading into the adjoining compartment.
SFP-BATCH-PLANT
Product class
Concrete batching plant
Mixer, aggregate bins, cement feed, and controls of an on-site batching plant. It produces the concrete.
MTP-FIRE-FIRE-DAMPER-ACTUATOR
Product class
Fire damper actuator
Drives the damper blade into its safe position on alarm or loss of power and reports the reached position back to the control system, so that closing can be triggered and verified remotely.
SFP-PUMP
Product class
Concrete pump
Truck-mounted or stationary pump with its set-up position and the boom envelope used to reach the pour. Distinct from the batching plant that produces the concrete.
MTP-FIRE-SMOKE-DETECTOR
Product class
Smoke detector
Monitors the air in the room or void for smoke and raises the alarm that starts evacuation and the linked fire control functions. Mounted on the ceiling or inside the monitored void on a base carrying the loop wiring, with each detector individually addressed so that it can be located from the alarm panel.
SFP-HOIST
Product class
Construction hoist
Mast-guided hoist or material lift tied to the structure, with landings at the served levels. Not a crane and not scaffolding.
SFP-SCAFFOLD
Product class
Scaffold
Frame or system scaffold with platforms, guardrails, and ties to the building. It is a work platform, not a protective canopy over the public footway and not the site fence.
SFP-POWER-DIST
Product class
Site power distribution board
Site distribution cabinet with outlets, protection, and sub-distribution for cranes, containers, and tools. The water connection is a separate concept.
SFP-WATER-CONN
Product class
Site water connection
Connection to the public or a temporary water supply, with meter, stop valve, and distribution to sanitary units, the wheel wash, and the concrete plant. Counterpart of the site power distribution board.
SFP-OTH
Product class
Other / unknown site facility
Placeholder for site facilities whose type is not yet fixed or not covered by a specific concept. State the function separately.
UT-WH-01
Room type
Dwelling
Gross volume of a dwelling. The room count follows the Swiss count; the half room is the kitchen.
RT-WH-01
Room type
Residential entry
Entry space within a dwelling unit.
RT-WH-02
Room type
Hallway
Circulation passage within a dwelling unit.
UT-WH-15
Room type
1.5-room dwelling
Gross volume of a 1.5-room dwelling. Living room and kitchen, with no separate bedroom.
UT-WH-25
Room type
2.5-room dwelling
Gross volume of a 2.5-room dwelling, with one bedroom.
RT-WH-03
Room type
Living room
Room for daily living and relaxation.
RT-WH-04
Room type
Dining room
Room for eating meals.
UT-WH-35
Room type
3.5-room dwelling
Gross volume of a 3.5-room dwelling, with two bedrooms.
RT-WH-05
Room type
Kitchen
Room for food preparation.
UT-WH-45
Room type
4.5-room dwelling
Gross volume of a 4.5-room dwelling, with three bedrooms.
RT-WH-06
Room type
Bedroom
Room primarily used for sleeping.
UT-WH-55
Room type
5.5-room dwelling
Gross volume of a 5.5-room dwelling, with three bedrooms and one dining room.
RT-WH-07
Room type
Bathroom
Room with bath, shower, or personal hygiene fixtures.
UT-WR-01
Room type
Office suite
Gross volume of a lettable office suite.
RT-WH-08
Room type
Home study
Residential room for study or home office work.
UT-BH-01
Room type
Single room
Gross volume of a hotel room for one person, with a private bathroom.
RT-WH-09
Room type
Guest room
Room for overnight guests.
UT-BH-02
Room type
Double room
Gross volume of a hotel room for two people, with a private bathroom.
UT-BH-03
Room type
Suite
Gross volume of a suite with a bedroom, a separate living room, and a private bathroom.
RT-WH-10
Room type
Stairwell
Vertical circulation between storeys.
RT-WH-11
Room type
Waste room
Room for collecting and setting out household waste.
RT-WH-12
Room type
Lobby
Shared entrance hall of the building.
UT-CO-01
Room type
Shop
Gross volume of a lettable shop.
RT-WH-13
Room type
Elevator lobby
Landing in front of the lift on a storey.
UT-KL-01
Room type
Basement
Gross volume of the basement.
RT-WH-14
Room type
Mail room
Room for receiving and distributing mail.
UT-ER-01
Room type
Vertical circulation
Gross volume of the vertical circulation.
RT-WH-15
Room type
Balcony
Open exterior space attached to the dwelling.
UT-ER-02
Room type
Horizontal circulation
Gross volume of the horizontal circulation.
UT-PK-01
Room type
Parking garage
Gross volume of a parking garage.
RT-WH-16
Room type
Street
Public access in front of the building.
RT-WH-17
Room type
Laundry room
Laundry room within a dwelling unit.
RT-WH-18
Room type
Communal laundry
Shared laundry for several dwellings, distinct from the laundry inside one dwelling.
RT-WH-19
Room type
Caretaker's cupboard
Caretaker storage for cleaning and maintenance.
RT-WH-20
Room type
Corridor
Shared circulation outside the dwelling units.
RT-WH-21
Room type
Cellar compartment
Assigned cellar storage compartment for a dwelling.
RT-WH-22
Room type
Interior bicycle parking
Bicycle parking space inside the building.
RT-WH-23
Room type
Interior car parking
Car parking space inside the building, typically in the basement garage.
RT-WH-25
Room type
Garden area
Garden area for staying outdoors and for upkeep.
RT-WH-26
Room type
Playground
Outdoor play area.
RT-WH-27
Room type
Escape balcony
Balcony used as a second means of escape.
RT-WH-28
Room type
Utility room
Room for domestic utilities and equipment.
RT-WH-29
Room type
Residential closet
Small storage within a dwelling unit.
RT-WH-30
Room type
Apartment unit
Generic residential unit space when not subdivided further.
RT-WH-31
Room type
Terrace
Exterior paved or decked platform.
RT-WH-32
Room type
Courtyard
Courtyard or patio.
RT-WH-33
Room type
Roof terrace
Occupiable flat-roof area intended for outdoor use.
RT-WH-34
Room type
Exterior car parking
Exterior parking space for passenger cars.
RT-WH-35
Room type
Exterior bicycle parking
Exterior parking space for bicycles.
RT-WH-36
Room type
Loggia
Recessed open outdoor room inside the building volume, distinct from a projecting balcony.
RT-WH-37
Room type
Winter garden
Closed glazed living room, distinct from open outdoor platforms such as balcony, terrace, and patio.
RT-WR-01
Room type
Office
Enclosed office for individual or shared desk work.
RT-WR-02
Room type
Open-plan office
Open office landscape without full-height partitions.
RT-WR-03
Room type
Meeting room
Room for small group meetings.
RT-WR-04
Room type
Conference room
Room for formal meetings and presentations.
RT-WR-05
Room type
Break room
Informal staff rest and refreshment space.
RT-WR-06
Room type
Reception
Visitor reception and waiting area.
RT-CI-01
Room type
Vestibule
Transition space between exterior and interior.
RT-CI-02
Room type
Airlock
Enclosed lock or airlock for controlled passage between zones.
RT-CI-03
Room type
Ramp
Inclined accessible circulation route.
RT-HY-01
Room type
Male toilet
Toilet room for male use.
RT-HY-02
Room type
Female toilet
Toilet room for female use.
RT-HY-03
Room type
Accessible toilet
Wheelchair-accessible toilet room.
RT-HY-04
Room type
Unisex toilet
Toilet room for mixed or all-gender use.
RT-HY-05
Room type
Shower room
Room with shower facilities.
RT-HY-06
Room type
Changing room
Room for changing clothes.
RT-HY-07
Room type
Locker room
Room with personal lockers.
RT-HE-01
Room type
Patient room
Room for inpatient care and recovery.
RT-HE-02
Room type
Recovery room
Room for post-procedure recovery.
RT-HE-03
Room type
Treatment room
Room for outpatient treatment.
RT-HE-04
Room type
Operating theatre
Room for surgical procedures.
RT-HE-05
Room type
Procedure room
Room for minor medical procedures.
RT-HE-06
Room type
Examination room
Room for clinical examination.
RT-HE-07
Room type
Imaging room
Room for diagnostic imaging.
RT-HE-08
Room type
Medical laboratory
Laboratory for medical analysis.
RT-HE-09
Room type
Waiting room
Room for patients and visitors to wait.
RT-HE-10
Room type
Nurses station
Central nursing and monitoring workspace.
RT-ED-01
Room type
Classroom
Room for school or group instruction.
RT-ED-02
Room type
Lecture hall
Room with fixed seating for lectures.
RT-ED-03
Room type
Seminar room
Room for seminars and workshops.
RT-ED-04
Room type
Computer room
Room with computer workstations for teaching.
RT-ED-05
Room type
Library room
Room for reading and library use.
RT-ED-06
Room type
Study room
Room for self-directed study.
RT-ED-07
Room type
Training workshop
Room for practical skills training.
RT-ED-08
Room type
Assembly hall
Large assembly hall for events.
RT-ED-09
Room type
Art studio
Room for visual arts instruction and practice.
RT-ED-10
Room type
Science laboratory
Laboratory for science teaching.
RT-CO-01
Room type
Cafeteria
Self-service dining space.
RT-CO-02
Room type
Restaurant
Full-service dining space.
RT-CO-03
Room type
Bar
Room for beverage service.
RT-CO-04
Room type
Food court
Shared dining area with multiple vendors.
RT-CO-05
Room type
Retail space
Room for displaying and selling goods.
RT-CO-06
Room type
Sales floor
Open retail sales area.
RT-CO-07
Room type
Kiosk
Small retail or service counter space.
RT-CO-08
Room type
Customer service area
Area for customer assistance and service.
RT-CO-09
Room type
Exhibition space
Room for displays and exhibitions.
RT-CO-11
Room type
Commercial kitchen
Kitchen for commercial food preparation.
RT-CO-10
Room type
Hotel room
Guest accommodation room.
RT-CO-12
Room type
Dishwashing area
Room for returning, washing, and preparing dishes.
RT-IN-01
Room type
Workshop
Room for manual fabrication and repair.
RT-IN-02
Room type
Production hall
Hall for manufacturing processes.
RT-IN-03
Room type
Assembly area
Area for product assembly.
RT-IN-04
Room type
Packaging area
Area for packaging goods.
RT-IN-05
Room type
Clean room
Controlled-environment production room.
RT-IN-06
Room type
Warehouse
Room or hall for goods storage.
RT-IN-07
Room type
Loading dock
Area for loading and unloading goods.
RT-IN-08
Room type
Quality control room
Room for inspection and quality testing.
RT-IN-09
Room type
Maintenance bay
Bay for equipment maintenance.
RT-IN-10
Room type
Covered yard
Covered exterior work or storage yard.
RT-TE-01
Room type
HVAC plant room
Room for heating, ventilation, and cooling plant.
RT-TE-02
Room type
Pump room
Room for pumps and fluid handling.
RT-TE-03
Room type
Boiler room
Room for boilers and heat generation.
RT-TE-04
Room type
Chiller room
Room for chillers and cooling plant.
RT-TE-05
Room type
Sprinkler room
Room for fire suppression equipment.
RT-TE-06
Room type
Electrical room
Room for electrical distribution equipment.
RT-TE-07
Room type
Server room
Room for IT and network equipment.
RT-TE-08
Room type
Generator room
Room for backup power generation.
RT-TE-09
Room type
Transformer room
Room for electrical transformers.
RT-TE-10
Room type
Communications room
Room for telecom and low-voltage systems.
RT-TE-11
Room type
Meter room
Room for utility metering equipment.
RT-ST-01
Room type
General storage
Room for general material storage.
RT-ST-02
Room type
Supply room
Room for consumable supplies.
RT-ST-03
Room type
Equipment storage
Storage for tools and equipment.
RT-ST-04
Room type
Unloading storage
Temporary storage at delivery point.
RT-ST-05
Room type
Archive room
Room for document and record archives.
RT-ST-06
Room type
Cold storage
Refrigerated storage room.
RT-ST-07
Room type
Laboratory store
Storage for laboratory materials and consumables.
RT-ST-08
Room type
Chemical store
Storage for chemicals.
RT-ST-09
Room type
Hazardous materials store
Storage for hazardous materials.
RT-ST-10
Room type
Sample storage
Storage for laboratory or material samples.
RT-VO-01
Room type
Shaft
Vertical service or circulation shaft.
RT-VO-02
Room type
Riser
Vertical building services riser.
RT-VO-03
Room type
Plenum
Ceiling or floor service void.
RT-VO-04
Room type
Mechanical void
Non-accessible mechanical void.
RT-VO-05
Room type
Air space
Non-occupiable air volume in the model.
RT-PK-01
Room type
Interior truck parking
Interior parking space for trucks.
RT-PK-02
Room type
Interior motorcycle parking
Interior parking space for motorcycles.
RT-OU-01
Room type
Maintenance roof
Walkable flat-roof area accessible only for facility management and inspection.
RT-OU-02
Room type
Technical plant pad
Flat-roof or outdoor pad reserved for building-services equipment and plant.
RT-OU-03
Room type
Green roof
Vegetated flat-roof area modelled as outdoor space.
RT-OU-04
Room type
Pool area
Outdoor pool or water feature area.
RT-OU-05
Room type
Retention area
Multi-purpose area with temporary, planned water retention during heavy rainfall.
RT-OU-06
Room type
Covered walkway
Covered exterior pedestrian route.
RT-OU-07
Room type
Portico
Covered exterior entrance structure.
RT-OU-08
Room type
Exterior stair
Open or external stair for outdoor vertical circulation.
RT-PK-03
Room type
Exterior truck parking
Exterior parking space for trucks.
RT-PK-04
Room type
Exterior motorcycle parking
Exterior parking space for motorcycles.
RT-WH-38
Room type
Drying room
Room for drying laundry, distinct from the wash room.
RT-ST-11
Room type
Stroller room
Store for strollers and mobility aids off the lobby, off the escape route.
RT-ST-12
Room type
Parcel room
Parcel locker room, distinct from the mail room and from personal lockers.
RT-WH-39
Room type
Waste chute
Vertical chute for transferring household waste to a central collection point.
RT-WH-40
Room type
Exterior waste collection area
Outdoor area for collecting and presenting bagged household waste.
RT-WH-41
Room type
Underground waste container
Outdoor space allocated to an underground household-waste collection container.
RT-WH-42
Room type
Garden shed
Enclosed outdoor storage room for garden tools and household goods.
RT-WH-43
Room type
Community office
Shared office for residents working outside their dwelling.
RT-WH-44
Room type
Exterior mailbox and parcel locker area
Outdoor area allocated to mailboxes and parcel lockers.
RT-CO-13
Room type
Stage
Area for performances, including its backstage zone.
RT-CO-14
Room type
Spectator stand
Tiered seating or standing area for spectators.
RT-CO-15
Room type
Cloakroom
Room for depositing visitors' coats and bags.
RT-CO-16
Room type
Sports hall
Hall for indoor sports and physical education.
RT-CI-04
Room type
Platform
Platform for boarding and alighting trains, trams, or buses.
RT-CI-05
Room type
Ticket hall
Hall with ticket counters and machines for passenger transport.
RT-TE-12
Room type
Control room
Staffed room for monitoring and operating building or IT systems.
RT-WR-07
Room type
Copy room
Shared room for printing, copying, and office supplies.
RT-CO-17
Room type
Pickup point
Counter or area where customers collect goods ordered or bought in advance.
RT-CI-06
Room type
Service lift
Lift for goods, staff, and service routes, separate from public lifts.
RT-CI-07
Room type
Bed lift
Lift sized for transporting patients in beds.
RT-LA-01
Room type
Chemical waste room
Room for collecting and setting out chemical laboratory waste, separate from other waste.
RT-LA-02
Room type
Biological waste room
Room for collecting and setting out biological laboratory waste, separate from other waste.
RT-LA-03
Room type
Radioactive waste room
Room for collecting radioactive laboratory waste and letting it decay, separate from other waste.
RT-WH-45
Room type
Shared compost
Outdoor area where residents compost organic waste together.
RT-WR-08
Room type
Phone booth
Soundproofed booth for one person's phone calls and online meetings.
RT-HY-08
Room type
Teachers' toilet
Toilet room for teachers, separate from pupils and students.
RT-HY-09
Room type
Students' toilet
Toilet room for pupils and students, separate from teachers.
RT-HY-10
Room type
Visitor toilet
Toilet room for visitors and customers, separate from staff.
RT-HY-11
Room type
Staff toilet
Toilet room for staff, separate from customers.
RT-CO-18
Room type
Swimming hall
Hall with a pool for training, school swimming, and recreation.
RT-OU-09
Room type
Children's pool
Shallow outdoor pool where children get used to the water.
US-WH-18
Scenario
Arriving home
Residents and visitors announce themselves at the building entrance. The reception method determines personal contact, visual confirmation, and access control.
US-GA-06
Scenario
Reaching the dining rooms
Guests reach the dining rooms while food and tableware move between kitchen and service. The access arrangement determines step-free access and separation of guest and service routes.
US-RZ-06
Scenario
Reaching the IT rooms
Staff and hardware reach the IT rooms under control. The access arrangement determines access control, transport loads, and security zones.
US-LA-06
Scenario
Reaching the laboratory
Researchers, samples, and supplies reach the laboratory floors. The access arrangement determines access control, hazardous goods transport, and separation of people and material routes.
US-LO-06
Scenario
Reaching the warehouse
Goods and staff move between the dock and storage floors. The access arrangement determines loads, handling time, and separation of people and goods routes.
US-VE-06
Scenario
Reaching the platform
Passengers travel from the hall to the platform with luggage, pushchairs, or wheelchairs. The access arrangement determines transfer time, step-free access, and passenger flow.
US-VS-08
Scenario
Reaching the hall
Audiences reach the hall within a short time and leave together, and stage equipment must reach other floors. The access arrangement determines crowd flow, escape routes, and separation of audience and deliveries.
US-BH-06
Scenario
Reaching the room
Guests reach their rooms with luggage while staff move linen and supplies between floors. The access arrangement determines step-free access, quiet, and separation of guest and service routes.
US-GE-01
Scenario
Reaching the unit
Users travel from the building entrance to their unit. The access arrangement determines routes, step-free access, and area demand.
US-PR-06
Scenario
Reaching production
Staff and materials reach the production floors. The access arrangement determines loads, material flow, and separation of people and goods routes.
US-HE-08
Scenario
Reaching the ward
Patients are moved in beds between ward, diagnostics, and surgery while visitors and supplies use the same floors. The access arrangement determines bed transport, hygiene, and separation of routes.
US-VK-06
Scenario
Reaching the sales floor
Customers reach the sales floor with bags or trolleys, and stock must reach the store room. The access arrangement determines step-free access and separation of customer and goods routes.
US-HE-01
Scenario
Arriving and waiting
Patients and accompanying people arrive and wait for care. The calling system determines waiting area, travel, and privacy.
US-BH-01
Scenario
Checking in
Guests arrive and gain access to their accommodation. The process determines reception area, staffing, and wayfinding.
US-VE-01
Scenario
Boarding and alighting
Passengers board and alight trains, trams, or buses at short intervals. The platform layout determines transfer routes, waiting zones, and passenger flow.
US-LA-01
Scenario
Running experiments
Researchers carry out tests, measurements, and analyses. The laboratory type determines ventilation, media supply, and safety level.
US-GA-01
Scenario
Serving guests
Guests order and consume food and drink. The service concept determines movement, dwell time, and dining area.
US-PR-01
Scenario
Manufacturing and assembly
Products are made in series or as one-offs. The manufacturing concept determines hall size, crane runways, and material flow.
US-SP-01
Scenario
Training indoors
Clubs, schools, and individuals train ball sports, gymnastics, or fitness. The hall determines the sports, divisibility, and booking.
US-WR-01
Scenario
Focused work
Staff perform tasks that require sustained concentration. The workplace concept determines quiet, privacy, and area demand.
US-WH-13
Scenario
Parking the car
Residents arrive by car. The parking place decides the route from the car to the dwelling and whether the site needs parking space.
US-RZ-01
Scenario
Operating servers
IT systems run around the clock. The arrangement of IT rooms determines availability, loads, and expandability.
US-GE-02
Scenario
Using the toilets
Users and visitors need toilets during their stay, including wheelchair users. The split determines number, area, privacy between user groups, and how flexibly the toilets can be used.
US-BI-01
Scenario
Teaching and learning
Learners and teachers regularly work in groups. The teaching format determines room size, furniture, and adaptability.
US-VS-01
Scenario
Attending events
Audiences attend concerts, lectures, or assemblies. The hall concept determines seating, flexibility, and room height.
US-LO-01
Scenario
Receiving goods
Trucks deliver goods in fixed time slots. The number of doors and the receiving area determine waiting times and yard traffic.
US-VK-01
Scenario
Displaying and selling goods
Customers browse goods, choose, and pay. The retail concept determines area, product display, and staffing.
US-GE-03
Scenario
Disposing of waste
Users and the operation take their waste away regularly. The collection point and the separated fractions determine walking distance, area, and ventilation.
US-VS-02
Scenario
Visiting exhibitions
Visitors view objects or works over a longer time. The exhibition concept determines room sequence, light, and security.
US-VE-02
Scenario
Buying tickets
Passengers buy tickets and ask for information. Staffed counters determine staffing, area, and waiting zones.
US-BH-02
Scenario
Staying overnight
Guests sleep and stay temporarily in the accommodation. The room concept determines privacy, equipment, and area.
US-VK-02
Scenario
Advising customers
Customers need advice, service, or a complaint handled away from the checkout. A dedicated area determines discretion, waiting time, and sales floor area.
US-LA-02
Scenario
Storing samples and supplies
Samples, reagents, and consumables are kept until use. Storage conditions determine temperature, access, and traceability.
US-PR-02
Scenario
Checking quality
Parts and products are checked before delivery. The test environment determines indoor climate, vibration protection, and proximity to production.
US-SP-02
Scenario
Swimming
Swimmers train, learn to swim, or relax in the water. Location and water depth determine the enclosure, plant area, and supervision.
US-BI-02
Scenario
Independent learning
Learners work alone or in small groups outside lessons. The location determines quiet, supervision, and accessibility.
US-GA-02
Scenario
Preparing food
Staff prepare food for guests. Production scale determines kitchen area, equipment, and goods flow.
US-RZ-02
Scenario
Securing power supply
Servers need uninterrupted power. The supply concept determines redundancy, plant area, and fire compartments.
US-HE-02
Scenario
Examining and consulting
Professionals examine and consult patients. Room allocation determines transfers, privacy, and utilization.
US-WH-12
Scenario
Parking the bicycle
Residents park their bicycles every day. The place decides whether bicycles stand sheltered indoors or outdoors, and how far the dwelling is.
US-LO-02
Scenario
Storing goods
Goods stay in stock for days to months. The storage type determines room height, temperature, and fire protection.
US-WR-02
Scenario
Collaborating
Teams regularly work together. The location determines whether collaboration happens in the work area or in a separate room.
US-VE-03
Scenario
Waiting for departure
Passengers wait before departure, sometimes with luggage or children. Sheltered waiting areas determine comfort, weather protection, and area.
US-BH-03
Scenario
Using bathroom facilities
Guests wash and care for themselves during their stay. Allocation determines privacy, travel, and room area.
US-WR-03
Scenario
Holding meetings
Staff and visitors meet for planned discussions. Group size determines the type and number of rooms.
US-GE-04
Scenario
Disposing of organic waste
Users and the operation regularly take food and green waste away, separately from other waste. The collection point determines odour, cooling, and how often it is collected.
US-LA-03
Scenario
Handling hazardous substances
Chemicals and hazardous substances are delivered, stored, and disposed of. Separate stores determine fire compartments, ventilation, and routes through the building.
US-GA-03
Scenario
Serving drinks
Staff prepare and serve drinks. The service point determines travel and separation between production and guest areas.
US-VS-03
Scenario
Spending time in the foyer
Audiences gather before the start and during the interval. The foyer offer determines dwell quality, catering, and area.
US-WH-20
Scenario
Storing the stroller
Households park strollers and mobility aids every day. The place decides whether they block the dwelling or shared circulation.
US-LO-03
Scenario
Picking and packing
Orders are picked and made ready for shipping. Picking determines routes, workstations, and buffer areas.
US-PR-03
Scenario
Delivering materials
Raw materials and semi-finished goods arrive by truck. Delivery determines yard area, stock levels, and routes to production.
US-HE-03
Scenario
Providing treatment
Patients receive procedures of varying complexity. The procedure determines room type, support, and safety zones.
US-BI-03
Scenario
Practical learning
Learners carry out experiments or creative and manual work. The activity determines equipment, safety, and area demand.
US-RZ-03
Scenario
Cooling servers
Servers give off heat continuously. The cooling concept determines cooling capacity, waste-heat use, and plant area.
US-SP-03
Scenario
Changing and showering
Athletes change before and after training. Separate changing rooms determine booking, gender separation, and hygiene.
US-VK-03
Scenario
Delivering stock for sale
Stock arrives daily or weekly and is held until sale. Delivery determines delivery times, storage area, and separation from customer routes.
US-RZ-09
Scenario
Using waste heat
Servers give off heat that would otherwise be lost at the heat rejection. Using that waste heat determines the boiler room, the connection, and the building's heat demand.
US-WR-04
Scenario
Receiving visitors
External visitors come to the workplace. The reception point determines wayfinding, access control, and the route to work areas.
US-BI-04
Scenario
Spending breaks
Learners spend breaks together. The location determines supervision, noise, and the use of indoor and outdoor areas.
US-HE-04
Scenario
Performing diagnostics
Professionals produce diagnostic images or analyse samples. The method determines specialist rooms, travel, and technical equipment.
US-LO-04
Scenario
Maintaining vehicles and equipment
Forklifts and delivery vehicles are charged, serviced, and repaired. Dedicated maintenance areas determine downtime and workshop needs.
US-PR-04
Scenario
Packing and shipping finished goods
Finished products are packed, staged, and collected. Shipping determines buffer areas and the separation of inbound and outbound goods.
US-BH-04
Scenario
Having breakfast
Guests have breakfast during their stay. The provision determines dining space, travel, and operating hours.
US-VS-04
Scenario
Checking coats
Visitors leave coats and bags before the event. The type of storage determines security, staffing, and queues in the foyer.
US-LA-07
Scenario
Changing in the laboratory
Staff put on protective clothing before entering the laboratory zone. The location determines contamination protection and routes in laboratory clothing.
US-VK-04
Scenario
Taking breaks in retail
Retail staff work in shifts and need breaks away from customers. Staff rooms determine rest, hygiene, and ancillary area.
US-WH-22
Scenario
Sleeping
Residents sleep in the dwelling every night. A separate room or part of the living room decides the room count, the area, and how far sleep stays undisturbed by the rest of the home.
US-SP-04
Scenario
Storing sports equipment
Mats, goals, and apparatus are put away after training. The location of the store determines set-up time and usable hall area.
US-VE-04
Scenario
Transferring
Passengers change between lines and modes. Connecting routes determine transfer time, accessibility, and crowding.
US-GA-04
Scenario
Delivering and storing goods
Goods are regularly delivered and stored before processing. Logistics determine delivery routes, storage area, and separation from guests.
US-VS-05
Scenario
Preparing performances
Performers change, wash, rehearse, and wait for their appearance, apart from the audience. The backstage determines workflows, privacy, and stage operation.
US-HE-05
Scenario
Observing and caring
Patients remain under observation after treatment or overnight. Length of stay determines privacy, monitoring, and care routes.
US-RZ-04
Scenario
Monitoring operations
Staff monitor the systems and respond to faults. A staffed control room determines response time, workstations, and access control.
US-LA-05
Scenario
Evaluating results
Researchers analyse data and write reports outside the lab. Separate write-up spaces determine lab area, safety, and team exchange.
US-VE-05
Scenario
Leaving luggage
Passengers leave luggage for a few hours. The storage offer determines security, area, and staffing.
US-GA-05
Scenario
Washing dishes
Used dishes are returned and washed during service. The location determines return routes, noise, and separation of clean and used items.
US-BI-05
Scenario
Eating and drinking
Learners and staff eat during the education day. The provision determines travel, dwell time, and additional area.
US-WH-01
Scenario
Cooking and eating
Residents cook and eat together every day. A room of its own or part of the living room changes the room count, the area, and how far cooking shapes the living space.
US-WR-05
Scenario
Taking breaks
Staff take breaks and eat during the working day. The provision determines social contact, travel, and additional area.
US-PR-05
Scenario
Changing shifts
Staff put on and take off work clothes before and after each shift. Changing rooms determine hygiene, gender separation, and routes to production.
US-VK-05
Scenario
Collecting purchased goods
Customers collect goods ordered online or bulky purchases. Collection determines waiting time, proximity to stock, and car access.
US-LO-05
Scenario
Dispatching goods
Trucks collect picked goods and wait until departure. Truck bays determine yard area, weather protection, and noise.
US-SP-05
Scenario
Watching competitions
Spectators watch games and competitions on site. A stand determines spectator numbers, escape routes, and hall volume.
US-BH-05
Scenario
Servicing rooms
Rooms are regularly cleaned and supplied with consumables. The service point determines travel, storage, and operations.
US-WH-02
Scenario
Working from home
Residents sometimes work from home. A room of its own decides quiet and area, and whether small dwellings are suitable.
US-RZ-05
Scenario
Delivering hardware
Servers and spare parts are delivered, unpacked, and installed. Delivery determines transport routes, door sizes, and security zones.
US-VK-07
Scenario
Changing in retail
Retail staff put on work clothes and take off private clothes before the shift, away from customers. The location determines routes in work clothes and the number of changing rooms.
US-WR-06
Scenario
Copying and printing
Staff print, copy, and fetch office supplies several times a day. A dedicated room determines noise, emissions, and routes within the office zone.
US-VS-06
Scenario
Storing equipment
Stage elements, seating, and exhibition material are stored between events. The storage location determines changeover time, transport routes, and area in the building.
US-HE-06
Scenario
Moving medical goods
Materials and samples are supplied, used, and removed. Logistics determine storage, travel, and separation of clean and used goods.
US-BI-06
Scenario
Preparing lessons
Teachers prepare lessons, mark work, and coordinate between classes. The workplace determines quiet, exchange among staff, and area demand.
US-HE-07
Scenario
Visiting
Relatives and friends visit patients during their stay. The visiting location determines privacy, disruption of care, and routes through the ward.
US-LA-09
Scenario
Disposing of special waste
Researchers take hazardous laboratory waste away separately from other waste. The kind determines ventilation, shielding, and the route out of the building.
US-WH-03
Scenario
Overnight guests
Visitors stay overnight now and then. A bed of their own decides whether guests sleep apart from the household.
US-WR-07
Scenario
Housing servers
The organization runs its own servers and network equipment. The location of IT determines plant area, cooling, and availability.
US-VS-07
Scenario
Supplying events
Technical equipment, set construction, and catering are delivered before each event and collected afterwards. Delivery determines set-up time, backstage routes, and yard area.
US-LA-08
Scenario
Emergency power
Experiments, refrigerated samples, and fume cupboards have to keep running during a power cut. Emergency power determines whether a dedicated generator is needed, and with it the plant area and the fire compartment.
US-WH-06
Scenario
Support at home
Residents who need support live on their own and receive home-care visits. A step-free route decides whether both reach the dwelling and the rooms they need.
US-WH-09
Scenario
Doing laundry
Households do laundry regularly. The choice decides whether each dwelling has its own machines or the way leads to a communal laundry.
US-WH-19
Scenario
Drying laundry
Households dry laundry regularly. The place decides where moisture and equipment sit, in the dwelling or shared in the building.
US-WH-10
Scenario
Storing household goods
Households store things they rarely use. The place decides what takes space in the dwelling and what is kept outside it.
US-WH-05
Scenario
Delivering mail
Mail is delivered and collected daily. The place decides where it is kept safe and how far it is from the dwelling.
US-WH-14
Scenario
Receiving a parcel
Parcels arrive even when no one is home. The handover point decides whether they can wait in a safe place.
US-WH-07
Scenario
Living outdoors
Residents spend time outdoors without leaving home. A private outdoor space by the living room decides direct access to the outside.
US-WH-17
Scenario
Outdoor play
Children play outdoors near home. The choice decides whether the site offers a play area.
US-WH-08
Scenario
Cleaning of common areas
Shared rooms are cleaned regularly. The choice decides whether the building needs space for cleaning supplies.
ANS
Document
Elevations
Building elevations as the geometric and visual planning basis. They act as a completeness check against the IFC model - facade, openings, and junctions must be readable on the drawing.
APH
Document
Heating execution drawings
Heating-system execution drawings with the routes, circuits, dimensions, and connections required for construction.
BGD
Document
Building permit dossier
Complete building application submitted to the permitting authority, including forms, plans, reports, concepts, and project-specific evidence.
BGA
Document
Permit plans architecture
Architecture permit plans for the building application. Floor plans, sections, and elevations in the representation required by the authority.
BGE
Document
Permit plans electrical
Electrical permit plans for the building application. Representation of the electrical systems in the form required by the authority.
BGH
Document
Permit plans heating
Heating permit plans for the building application. Representation of the heating systems in the form required by the authority.
BGK
Document
Permit plans cooling
Cooling permit plans for the building application. Representation of the cooling systems in the form required by the authority.
BGC
Document
Permit plans air conditioning
Air-conditioning permit plans for the building application. Representation of the air-conditioning systems in the form required by the authority.
BGL
Document
Permit plans ventilation
Ventilation permit plans for the building application. Representation of the ventilation systems in the form required by the authority.
BGS
Document
Permit plans plumbing
Plumbing permit plans for the building application. Representation of the plumbing systems in the form required by the authority.
BPK
Document
Building physics component catalogue
Building physics component catalogue with values for the envelope and separating components. Basis for verification, variants, and coordination with architecture and specialists.
CRQ
Document
Change requests
Change orders and variations. They prevent unplanned extra cost by coupling variations directly to the affected milestones and containers (project, site, building, storey).
BWP
Document
Reinforcement plans
Reinforcement plans for concrete execution. They make bars, layers, and positions readable for site.
BBO
Document
Flooring schedule
Room list by covering type, area, and perimeter as a verifiable basis for the flooring tender. The figures come from the interior spaces, not from a separate quantity take-off.
BDG
Document
Geotechnical report
Geotechnical report with subsoil, bearing capacity, and geotechnical recommendations. It complements the terrain survey and position reference as the basis for foundations, excavation, and strategy choice.
BSM
Document
Fire cause-and-effect matrix
Fire cause-and-effect matrix for detectors, dampers, actuators, and suppression equipment. It ensures the safety matrix is formally approved before construction.
BSK
Document
Fire protection concept
Fire protection concept with protection goals, compartments, and required fire-resistance classes. Binding basis for the fire plan, model values, and permit.
BSP
Document
Fire protection plan
Fire protection plan with compartments, escape routes, and fire resistance of the governing components. It supports alignment with the fire concept and permit documents.
DET
Document
Details
Standard and execution details as the geometric planning basis. They close the gap between model and construction and act as a completeness check where the IFC model is not held at detail depth.
FEN
Document
Window schedule
Schedule of windows with window number, type, and dimensions as the basis for tender, coordination, and handover to operation.
FMR
Document
Funding report
Report on a construction project's funding applications with the associated measures, check results, contributions, and evidence. Basis for tracking from application through to payment.
FUG
Document
Joint layouts
Coordinated layout of movement, perimeter, and bay joints in the floor build-up as a basis for underfloor heating and construction.
GLD
Document
Terrain survey
Terrain survey with position and height reference in LV95 and control points. Binding spatial basis for all discipline models; complemented by the geotechnical report.
GRD
Document
Floor plans
Storey floor plans as the geometric and visual planning basis, typically at scale 1:50. They act as a completeness check against the IFC model - the model is validated via IDS, the plans show whether the status is complete and readable.
GRS
Document
Floor plans, schematic
Schematic storey floor plans in early phases, often at scale 1:200 or 1:100. Placing a grey or black area behind the spaces allows floor plans to be produced without drawing the walls.
IGR
Document
IPD base reference
Contract-ready functional base reference with market-indexed reference costs as the basis for IPD award, fee calculation, and bonus settlement.
KBE
Document
Cost calculation
The cost calculation refines and details the cost estimate in line with the advanced technical design status and the more precise element-based quantity basis.
KVA
Document
Cost estimate
The cost estimate is based on the technical design status and element-based quantities. The cost accuracy of ± 25 % indicates the confidence in the underlying assumptions, not an allowable cost deviation; contingencies and escalation must be shown separately.
LAY
Document
Robotic layout file
Storey-wise layout file derived from the architecture model for robotic printing on the structural slab. It contains the lines and short texts to set out - not as a parallel 2D drawing, but as a derivation from the model status.
LVP
Document
Planning services specification
Contract-ready description of the planning services, results, and data deliveries expected when procuring a design team.
LV
Document
Bills of quantities
Bills of quantities for tender and award.
NZK
Document
Usage concept
Usage concept with prioritized usage scenarios, verifiable acceptance criteria, and operational assumptions. Binding basis for test planning, the room programme, and acceptance of design and construction.
NVG
Document
Usage agreement MEP
MEP usage agreement. It links agreed room-by-room requirements for heating, ventilation, air conditioning, plumbing, and electrical to the technical design status.
NVT
Document
Usage agreement structure
Structural usage agreement to SIA 260. It links agreed uses, loads, and vibration requirements per space to the technical design status of the structure.
LFP
Document
Delivery plan / IDP
A management instrument of project management. It sets which information is delivered in which container, in what form, by whom, and by when.
PPL
Document
Product-passport list
List of installed products using the GTIN and, where needed, the serial number as the key to the corresponding digital product passport. The contractor or supplier maintains and updates the data.
BAP
Document
Project handbook / BEP
Project handbook and BIM execution plan as a living management and working document. It is not intended to form part of the contract but is continuously developed based on knowledge gained throughout the project.
PRT
Document
Minutes
Meeting and decision minutes are preferably maintained as one continuous, living document. Current discussion items are highlighted for easy orientation, enabling contradictions to be identified early and content from the project handbook or BEP to be addressed directly and kept up to date.
RMB
Document
Room book
Continuously maintained data container for ordered room types, planning room types, room instances, and their requirements and deviations throughout the project.
RPG
Document
Room programme
Structured list of the rooms ordered at an agreed status, with a stable technical room number, ordered room type, and groupings. Binding basis for designer procurement, competition, and comparison with the model.
RGR
Document
Daywork reports
Daywork reports for time-and-material work. They prevent unplanned extra cost by coupling daywork directly to the affected milestones and containers (project, site, building, storey).
SGG
Document
Hazardous-material report
Report of hazardous-material findings in the existing building. Component-level type and remediation urgency are taken from it into the existing-building model.
SHL
Document
Formwork plans
Formwork plans for concrete execution. They make formwork, dimensions, and junctions readable for site.
SCT
Document
Sections
Building sections as the geometric and visual planning basis. They act as a completeness check against the IFC model - heights, layers, and vertical relationships must be readable on the drawing.
GSK
Document
Building security concept
Security concept with security zones, security levels, protection goals, and required burglary resistance classes. Binding basis for model values and insert models of critical areas.
STG
Document
Riser schematics / shafts
Riser schematics and shafts for building services. They ensure vertical distribution and shafts are formally approved before construction.
SYS
Document
System and plant schematics (MEP)
MEP system and plant schematics (heating, ventilation, air conditioning, plumbing, electrical). They ensure building-services concepts are formally approved before construction.
TL
Document
Door schedule
Construction-ready schedule of all doors, gates, and inspection openings with the information required for ordering, fabrication, and installation.
UVP
Document
Environmental impact assessment
Environmental impact assessment of the project's effects on the environment and surroundings. Basis for the building application and alignment with the authority.
VKG
Document
Traffic study
Traffic study for access, parking, and effects on the surrounding network. Basis for the building application and alignment with the authority.
WHB
Document
Maintenance manuals
Asset-specific documentation for safe operation, inspection, and maintenance.
WVT
Document
Maintenance contracts
Contracts for agreed asset maintenance over a defined term.
WVK
Document
Works contracts
Works contracts with contractors.
WSP
Document
Apartment schedule
Schedule per apartment with count, type, and gross and net residential area. Derived from gross volumes and net rooms and kept current when the design changes.
DBA
Document
Design-build functional tender basis
Client-side functional tender basis with requirements, indicative quantities, quality specifications, and price boundaries as the foundation for design-build awards with a binding offer price.
IFC-2X3
Regulation
Industry Foundation Classes IFC2x3 TC1
IFC-4
Regulation
Industry Foundation Classes IFC4 ADD2 TC1
IFC-4X3
Regulation
Industry Foundation Classes IFC4.3 ADD2
SIA-181
Regulation
SIA 181 Sound insulation in buildings
SIA-416
Regulation
SIA 416 Areas and volumes of buildings
SIA-500
Regulation
SIA 500 Obstacle-free buildings
VKF-14-15
Regulation
Fire protection directive 14-15 Use of building materials
VKF-15-15
Regulation
Fire protection directive 15-15 Fire safety distances, load-bearing structures, fire compartments
VKF-16-15
Regulation
Fire protection directive 16-15 Escape and rescue routes
VKF-17-15
Regulation
Fire protection directive 17-15 Escape route marking, safety lighting, safety power supply
VKF-18-15
Regulation
Fire protection directive 18-15 Fire-extinguishing equipment
VKF-19-15
Regulation
Fire protection directive 19-15 Sprinkler systems
VKF-20-15
Regulation
Fire protection directive 20-15 Fire alarm systems
VKF-21-15
Regulation
Fire protection directive 21-15 Smoke and heat exhaust systems
VKF-23-15
Regulation
Fire protection directive 23-15 Conveying systems
VKF-24-15
Regulation
Fire protection directive 24-15 Heating plant
VKF-25-15
Regulation
Fire protection directive 25-15 Ventilation systems
VKF-26-15
Regulation
Fire protection directive 26-15 Hazardous substances
WBS
Regulation
Housing evaluation system WBS
SIA-181-001
Rule
Airborne sound insulation meets the requirement
The verified airborne sound insulation of a wall, slab, door or exterior element reaches at least the required value. The acoustic consultant sets the requirement under SIA 181: between rooms from the room pair and the requirement level, for exterior elements from the exterior noise and the noise sensitivity.
VKF-16-15-001
Rule
Escape route to an exit or stair at most 50 m
From no point of an interior space may the route to the nearest exit to the outside or the nearest stair (vertical escape route) exceed 50 m. The 50 m apply only where two separate exits or stairs can be reached; otherwise the 35 m limit applies (VKF-16-15-002).
WBS-2015-001
Rule
Net living area meets the WBS minimum fit-out
The net living floor area of a dwelling (walkable floor areas from 1.50 m room height, WBS glossary) reaches at least the Grundausstattung value for the room count: 30 / 45 / 60 / 80 / 100 / 120 / 140 m² for 1 to 7 rooms. Sum the net areas of all spaces that share the same UsageUnitReference.
SIA-181-002
Rule
Impact sound level at most the permitted value
The verified impact sound level in the room below a slab does not exceed the maximum permitted value. The acoustic consultant sets the maximum under SIA 181 from the room pair and the requirement level.
VKF-16-15-002
Rule
Escape route with a single exit at most 35 m
Where only one exit to the outside or only one stair serves as vertical escape route, the route from the most remote point of an interior space is limited to 35 m. The model does not show whether a second, independent escape route exists, so the check reports routes above 35 m as a warning.
WBS-2015-002
Rule
Rooms meet the WBS minimum areas
Habitable rooms of a dwelling meet the Grundausstattung minima: main rooms at least 14 m², other rooms at least 10 m² (WBS 2015 annex). Additional area offers (bays, niches, walkable zones) count toward K16 but do not replace the room minima.
SIA-181-003
Rule
Separating elements between usage units carry a sound insulation requirement
Walls, slabs and doors between rooms of different usage units, or between a usage unit and a room outside it such as the stairwell, need an airborne sound insulation requirement under SIA 181. Without a requirement neither the acoustic verification nor the check of the elements is possible.
VKF-16-15-003
Rule
Doors on escape routes: clear width at least 0.90 m
A door that an escape route passes through needs a clear opening width of at least 0.90 m. Depending on the use, smaller sizes are allowed, for example for doors to ancillary or small rooms.
WBS-2015-003
Rule
Rooms allow varied furnishing per the WBS area module
Habitable rooms provide enough clear floor area and sensible door and window positions so the WBS area module for varied furnishing (living and sleeping without fixed use) fits. Assessment follows lead furniture such as sofa and table zones alongside Grundausstattung minima.
SIA-181-004
Rule
Rooms next to other usage units carry noise load and noise sensitivity
A room of a usage unit that adjoins a room outside its unit through a wall, slab or door needs a noise load and a noise sensitivity. Under SIA 181 the requirement of the separating element depends on both values of the room pair; if one is missing, it cannot be derived.
VKF-16-15-004
Rule
Doors on escape routes: clear height at least 2.00 m
Doors on escape routes need a clear passage height of 2.00 m; use-specific deviations are possible. The check reads the overall door height (IfcDoor.OverallHeight): if even that is below 2.00 m, the clear height is too small.
WBS-2015-004
Rule
Rooms provide WBS-compliant bed positions
Each room allows at least one bed position per the WBS bed module: single 1.00 × 2.00 m or double 1.80 × 2.00 m with 0.60 m side clearances and free door swing. How many positions fit per room follows the layout and Grundausstattung.
VKF-16-15-005
Rule
Horizontal escape routes at least 1.20 m wide
Corridors and other horizontal escape routes are at least 1.20 m wide, measured between walls or railings. A higher occupancy can require more width.
WBS-2015-005
Rule
Kitchen and dining areas meet the WBS Grundausstattung
The dwelling kitchen and dining zone allow the Grundausstattung: kitchen run in 0.60 m modules with an operating band, table module with chair zone by size (e.g. 1.6 × 1.6 m for 1 room up to 4.2 × 2.7 m for 7 rooms), and passage widths of at least 0.90 m.
VKF-16-15-006
Rule
Stairs on escape routes: width 1.20 m, winding 1.50 m
Straight stairs including landings on escape routes are at least 1.20 m wide. Winding stairs need 1.50 m and an inner tread width of at least 0.15 m.
WBS-2015-006
Rule
Sanitary rooms meet WBS count and accessibility
The dwelling provides the sanitary rooms from Grundausstattung (1 to 3 rooms by apartment size, at least 3.8 m² per sanitary module in planning). At least one sanitary room is usable without barriers per accessibility building requirements (SIA 500, paraphrased).
VKF-16-15-007
Rule
Number of stairs as vertical escape routes by floor area
A storey without sufficient ground-level exits to the outside needs at least one vertical escape route up to 900 m² of floor area and at least two above 900 m². Rooms for more than 100 people also need two vertical escape routes unless sufficient ground-level exits exist.
WBS-2015-007
Rule
Storage and kitchen areas provide WBS wardrobe modules
Storage and kitchen zones provide additional wardrobe modules from Grundausstattung (2 to 7 modules by room count, wardrobe module 0.60 × 0.60 × 1.80 m with 0.90 m front service clearance). Not yet checkable as SHACL: module count and footprints per dwelling unit and service zones are not aggregated quantities yet.
VKF-16-15-008
Rule
Room exits by occupancy
The number and width of a room's exits depend on its occupancy: up to 50 people one exit of 0.90 m; up to 100 people two of 0.90 m each; up to 200 people three of 0.90 m each or two of 0.90 m and 1.20 m; more than 200 people several of at least 1.20 m each.
WBS-2015-008
Rule
Apartment layout is adaptable after completion
Non-load-bearing interior walls of the dwelling are planned so they can be removed or added later to enable adaptable layouts. Assessment covers partitions between living spaces, not the load-bearing core.
VKF-16-15-009
Rule
Doors on escape routes open in the escape direction
Doors on escape routes open in the escape direction and can be opened quickly in that direction at any time without a key or tool. For rooms for at most 20 people the swing direction is free; the check applies only when a connected space has PeakOccupancy above 20 or no occupancy is set.
WBS-2015-009
Rule
Dwelling has private outdoor area per WBS
The dwelling has privately usable outdoor areas (balcony, terrace, garden, loggia) at least at Grundausstattung levels by room count (3 to 6 m²). Sum outdoor areas tied to the same UsageUnitReference.
VKF-15-15-001
Rule
Structure in basements at least R 60
Load-bearing elements below ground need the same fire resistance as the structure of the storeys above, and in any case R 60. Single-family houses including their basement and buildings of small dimensions are exempt.
WBS-2015-010
Rule
Transitions between living space and outdoors are high quality
Transitions between living spaces and the private outdoor area (doors, windows, sliders, level changes, weather protection) enable comfortable, safe indoor-outdoor use without disruptive barriers. Thresholds, paths, and accesses match how the outdoor area is used.
VKF-15-15-002
Rule
Fire compartment walls and slabs in basements at least EI 60
Walls and slabs forming fire compartments below ground meet the requirement of their use, and at least EI 60. The check treats every wall or slab with a stated fire resistance of class EI, REI or F as forming a compartment.
WBS-2015-011
Rule
Private storage rooms outside the dwelling are assigned
Private storage rooms outside the net dwelling floor area are clearly assigned to the dwelling unit (cellar, attic, locker), in line with Grundausstattung storage areas. Check assignment and usability via the same UsageUnitReference.
VKF-15-15-003
Rule
Openings in fire compartment walls closed by a fire-rated closure
Doors, windows and other openings in walls that form fire compartments are closed by a fire-rated closure. EI 30 is the usual requirement; where the fire load is very small (e.g. between corridor and staircase) E 30 is enough.
VKF-15-15-004
Rule
Structure: fire resistance by building height
Load-bearing elements need at least, by building height: low R 30, medium R 60, high-rise R 90. With sprinklers: low no requirement, medium R 30, high-rise R 60.
VKF-15-15-005
Rule
Floor slabs: fire resistance by building height
Floor slabs forming fire compartments need at least, by building height: low REI 30, medium REI 60, high-rise REI 90. With sprinklers: low EI 30, medium REI 30, high-rise REI 60.
VKF-15-15-006
Rule
Fire compartment walls: fire resistance by building height
Walls separating fire compartments or horizontal escape routes need at least EI 30 at low and medium height and EI 60 in high-rises (EI 30 with sprinklers). These are the lowest values of the tables; other uses partly require more.
VKF-15-15-007
Rule
Vertical escape routes: fire resistance by building height
The enclosure of staircases and other vertical escape routes needs at least: low height REI 30, medium height REI 60, high-rise REI 90. These values apply with sprinklers too; other uses partly require more.
VKF-15-15-008
Rule
Doors to staircases close automatically
Doors leading into a staircase or another vertical escape route have a door closer. Apartment doors and doors of classrooms, single offices and plant rooms are not affected.
VKF-15-15-009
Rule
Fire separation distance between buildings
Between neighbouring buildings, measured facade to facade: 5 m if both facades are RF1 materials on the outside; 7.5 m if one is combustible on the outside; 10 m if both are.
VKF-15-15-010
Rule
Office buildings: fire compartment at most 3600 m²
In office buildings a fire compartment covers at most 3600 m² without special proof. All storeys connected without fire resistance count together.
VKF-23-15-001
Rule
Lift shaft linking several fire compartments with fire resistance
Where a lift links several fire compartments, it sits in a shaft whose enclosure matches the fire resistance of the use-related compartmentation, but at least EI 30. The shaft walls run up to the roof skin; if the shaft ends below, its top closure has the same fire resistance.
VKF-23-15-002
Rule
Lift landing doors: fire resistance by location and building type
Lift landing doors are made of RF1 building materials. Where they open directly into a usage unit, they need E 30, or E 60 under a high fire load (above 1000 MJ/m² in the rooms).
VKF-23-15-003
Rule
Fire-fighting lift: shaft, lobby and landing doors
Access to the fire-fighting lift is on every floor only through lobbies. Shaft and lobbies have fire resistance EI 90, fire-resistant closures and a smoke-control pressurisation system.
VKF-15-15-011
Rule
Penetrations through compartment components: firestop of at least 30 minutes
Openings and service penetrations in walls and floors that form fire compartments are closed with fire resistance; the firestop holds for at least 30 minutes. Allowing for thermal expansion, the recess is either filled tightly with RF1 materials or closed with a VKF-recognized firestop system rated EI 30.
VKF-15-15-012
Rule
Pipes through compartment components: recognized firestop system
Where pipes pass through components that form fire compartments, a VKF-recognized firestop system is used, e.g. a fire collar.
VKF-15-15-013
Rule
Combustible pipe insulation interrupted at the penetration
Combustible thermal insulation on services is interrupted with RF1 material where the service passes through a wall or floor that forms a fire compartment. For tested and recognized components the VKF recognition applies.
VKF-15-15-014
Rule
Installation shafts over several storeys: compartment-forming, at least EI 30
Building-services lines running over several storeys are in principle routed in installation shafts that themselves form fire compartments. The shaft enclosure matches the fire resistance of the use-related compartmentation, but at least EI 30.
VKF-15-15-015
Rule
Inspection openings of installation shafts: EI 30 closure
Inspection openings in installation shafts are closed with fire-rated closures EI 30. In low and medium-height buildings RF1 inspection covers are sufficient where the shaft is subdivided or filled storey by storey.
VKF-15-15-016
Rule
Installation shafts: horizontal subdivision at every storey
In installation shafts that are closed at the top, the recesses for lines are closed with RF1 materials at every storey.
VKF-15-15-017
Rule
Installation shafts: separate flue systems and ducts with enhanced requirements
Flue systems, ventilation ducts with enhanced fire protection requirements and similar lines are separated from each other and from the other installations in the same shaft with 30 minutes of fire resistance made of RF1 materials, e.g. fire protection boards.
VKF-15-15-018
Rule
Housing: dwellings as separate fire compartments
Dwellings are built as separate fire compartments. For single-family houses including their basements and an associated granny flat, no fire resistance is required of structure, walls and floors.
VKF-15-15-019
Rule
School buildings: fire compartment at most 3600 m², special rooms separate
School operations and associated uses, as well as the gymnasium with its ancillary rooms, may each be combined in one fire compartment. Without special proof the contiguous compartment area is at most 3600 m²; it includes all storeys connected without fire resistance.
VKF-15-15-020
Rule
Accommodation: guest rooms and technical rooms as fire compartments
In accommodation facilities, guest, inmate, patient and staff rooms, operational technical rooms, examination, treatment and laboratory areas, and technical rooms are each built as fire compartments. Not yet checkable: the model does not identify fire compartments.
VKF-15-15-021
Rule
Car parks: fire compartments of 4800 m² or 2400 m²
Car parks form their own fire compartments. For underground car parks and closed above-ground car parks the permitted compartment area is 4800 m² if the car park has one storey or the storeys form separate compartments.
VKF-15-15-022
Rule
High-rise buildings: no inspection openings in safety stairwells, limit fire spread at the slab edge
In high-rise buildings, measures against fire spread are taken at every storey where the floor slab meets the external wall; they are not needed where full extinguishing-system protection is provided. Inspection openings of installation shafts are not located in safety stairwells.
VKF-15-15-023
Rule
Transformer rooms: separate fire compartment, at least EI 60
Rooms for transformers are built as separate fire compartments. Their enclosure matches the fire resistance of the use-related compartmentation, but at least EI 60.
VKF-14-15-001
Rule
High-rise buildings: external wall and cladding system made of RF1 materials
The external wall and the external wall cladding system of high-rise buildings are made of RF1 materials. Exceptions are plastic anchors, point back-anchorages of insulation and components of negligible area such as joints or seals.
VKF-14-15-002
Rule
High-rise buildings: external wall with combustible layers encapsulated on all sides K 60
Where a high-rise external wall consists of single layers containing combustible materials, it counts as RF1 as a whole if it is encapsulated on all sides with K 60 - RF1. The gaps are filled without voids with RF1 materials.
VKF-14-15-003
Rule
External wall cladding systems: reaction to fire by building height and use
The required reaction-to-fire group of external wall cladding systems rises with building height. In low buildings, RF3 materials generally suffice for other uses, while for accommodation the insulation layer stays RF1.
VKF-14-15-004
Rule
Medium height: subdivide combustible facade, fire spread at most two storeys
In medium-height buildings with combustible external wall cladding or thermal insulation, the facade is subdivided structurally so that a fire spreads at most two storeys above the storey of origin before the fire brigade attacks. The fire brigade must be able to reach the facade surfaces for firefighting.
VKF-14-15-005
Rule
Rendered external insulation with combustible insulant: fire barrier at every storey
External thermal insulation composite systems with a combustible insulant on medium-height buildings are a VKF-recognized or equivalent construction, or have a circumferential fire barrier made of an RF1 material with a melting point of at least 1000 °C and at least 0.2 m high at every storey.
VKF-14-15-006
Rule
Ventilated facades: recognized construction, substructure RF3, fixings RF2
Ventilated facades on medium-height buildings whose cladding or insulation in the ventilated cavity is combustible are VKF-recognized or equivalent constructions. On low and medium-height buildings, rod-shaped substructures made of RF3 materials suffice.
VKF-14-15-007
Rule
Double-skin facades made of RF1, no storey-spanning box windows
Storey-spanning double-skin facades are made of RF1 materials; combustible linear window profiles are allowed, and with additional measures combustible materials are possible. Storey-spanning box windows are not allowed.
VKF-14-15-008
Rule
External fabrics and films: reaction to fire, distance and position
Fabrics and films fixed on the outside are made of at least RF2 materials, on facades with an RF1 outer layer at least RF3. Combustible fabrics and films are only possible in front of facade areas without openings and fixed glazing, and keep at least 0.9 m distance in width and height from openable windows.
VKF-14-15-009
Rule
Materials with critical behaviour (cr) generally not usable indoors
Materials with critical behaviour (cr) are generally not usable inside buildings. Exceptions are cables, single-layer membrane facades and materials under a void-free covering with a minimum thickness of 0.5 mm (RF1), 3 mm (RF2) or 5 mm (RF3).
VKF-14-15-010
Rule
Vertical escape routes: reaction to fire of linings and structures
In vertical escape routes (stairwells) of low and medium-height buildings with a structural concept, walls and floors with fire resistance, wall and ceiling linings, classified systems, stretched ceilings and stair and landing structures are made of RF1 materials; floor coverings are at least RF2.
VKF-14-15-011
Rule
Horizontal escape routes: reaction to fire of linings
In horizontal escape routes of low and medium-height buildings, wall and ceiling linings and classified systems are made of RF1 materials with a structural concept and of RF2 with an extinguishing-system concept; stretched ceilings are RF1 or RF2, one group lower where more than 5 m above walkable areas.
VKF-14-15-012
Rule
Escape routes: combustible area share at most 10 %
In escape routes, the area share of combustible materials such as luminous panels, pin boards, linings or balustrade infills is at most 10 % of the stairwell floor area per storey or of the floor area of the horizontal escape route. Partial areas are at most 2 m² and keep at least 2 m distance from each other.
VKF-14-15-013
Rule
Other interior rooms: minimum reaction-to-fire requirements
In interior rooms outside escape routes, RF3 materials generally suffice in low and medium-height buildings. Exceptions: in accommodation and rooms with large occupancy, stretched ceilings are RF1 with a structural concept and RF2 with an extinguishing-system concept.
VKF-14-15-014
Rule
Interior fit-out: thin coatings and linear substructures where RF1/RF2 is required
Where RF1 is required for interior walls, floors and ceilings, combustible coatings such as paint, wallpaper or veneer up to 1.5 mm thick are allowed on the room side. Where RF1 or RF2 is required, linear substructures such as battens may be RF3, provided the visible side has a closed layer of the required group.
VKF-14-15-015
Rule
Evacuation rooms, airlocks and anterooms: assignment to escape routes
For materials, evacuation rooms count as vertical escape routes, except patient rooms and horizontal escape routes in accommodation. Airlocks count as vertical escape routes, anterooms as horizontal ones.
VKF-17-15-001
Rule
Offices, trade, schools, high-rise: escape signs and safety lighting
In office, industrial and trade buildings, school buildings, underground protective structures and high-rise buildings, exits and escape routes are marked with escape signs, and safety lighting is installed in the escape routes.
VKF-17-15-002
Rule
Accommodation: illuminated escape signs on safety lighting and safety lighting
In accommodation facilities, exits and escape routes are marked with escape signs on safety lighting, and safety lighting is installed in the escape routes. For remote accommodation facilities (e.g. mountain huts) the fire authority decides whether it is needed.
VKF-17-15-003
Rule
Car parks: safety lighting also in the room, e.g. in driving lanes
In car parks, exits and escape routes are marked with escape signs on safety lighting and the escape routes are fitted with safety lighting. The escape routes within the parking area itself, for example along the driving lanes, also get safety lighting.
VKF-17-15-004
Rule
Rooms with large occupancy, shops: signs lit continuously
In rooms with large occupancy and in shops, exits and escape routes are marked with escape signs on safety lighting. Their lighting stays on as long as people are in the room.
VKF-17-15-005
Rule
Escape signs: direction indicators, visibility and height across the escape direction
The escape direction is marked with direction indicators if it is not immediately obvious or if people unfamiliar with the premises are present, for example at changes of direction. Exits that are not immediately recognizable or are used only in emergencies are marked.
VKF-17-15-006
Rule
Escape signs: visibility not impaired, no confusing green
Decorations, advertising and other fittings do not impair the view of escape signs. Other illuminated signs, inscriptions and mirrors do not distract or cause confusion.
VKF-17-15-007
Rule
Escape signs: durable, easily recognizable, white on green
Escape signs are durable and large enough to be easily recognizable; the required size depends on the distance from which the meaning must still be clear. According to recognized standards they are rectangular or square, with white arrows and symbols on a green ground.
VKF-17-15-008
Rule
Lighting of escape signs: safety lighting, afterglow, safety power supply
Where lighting of escape signs is required, it is provided as safety lighting. Signs that are neither lit nor backlit are photoluminescent.
VKF-17-15-009
Rule
Safety lighting: at least 30 minutes, effective after 15 seconds, not switchable
Safety lighting takes effect in time when the normal lighting fails and lasts at least 30 minutes; if the general power supply fails, it is operating after 15 seconds at the latest.
VKF-17-15-010
Rule
Safety luminaires: light the floor zone and the route to the open air
In escape and rescue routes, safety lighting adequately lights in particular the floor zone and the way to the exit to the open air. Safety luminaires mounted low above the floor have an unbreakable guard.
VKF-17-15-011
Rule
Safety lighting in escape routes: at least 1 lux
The illuminance of safety lighting in escape routes is at least 1 lux. Not yet checkable: the model carries no illuminance for luminaires or escape routes.
VKF-17-15-012
Rule
Power sources for safety purposes: independent of the normal supply
A power supply for safety purposes is needed for the safety lighting of rooms, escape routes and escape signs, and for fire protection installations such as sprinkler pumps and fire-brigade lifts.
VKF-17-15-013
Rule
Safety power sources: installation room at least EI 30, separation EI 60
Power sources for safety purposes and their controls are installed in fixed positions in rooms with a low fire risk. The installation room matches the fire resistance of the structure or the fire compartments, but at least EI 30; the doors are EI 30.
VKF-17-15-014
Rule
Distribution network for safety purposes: separate circuits, functional endurance, separation
Circuits for safety purposes are laid independently of other circuits. The distribution network is protected against fire so that functional endurance matches the intended operating time of the connected consumers.
VKF-17-15-015
Rule
Acceptance test of safety lighting and safety power supply
Complex projects for safety lighting and power supply for safety purposes, including escape-route marking, are submitted for approval before construction starts when the fire authority requests it. After completion, and after major extensions and changes, the installations are accepted and the test is documented.
VKF-16-15-010
Rule
Keep escape routes clear at all times and use them only for circulation
Escape and rescue routes may serve as ordinary circulation routes but must stay clear and safely usable at all times. Outside the use unit they must not serve any other purpose, for example as storage or waiting areas.
VKF-16-15-011
Rule
Vertical escape routes lead independently to the outside and are not offset
Vertical escape routes (e.g. stair systems) lead to a safe place outside. Where there are several, they lead there independently of each other.
VKF-16-15-012
Rule
Escape route within the use unit at most 35 m
Within a use unit the escape route may measure at most 35 m. If the exits do not lead directly outside or into a vertical escape route within these 35 m, a horizontal escape route is needed in between (e.g. a corridor with fire resistance or an access balcony).
VKF-16-15-013
Rule
Exit width above 200 people: 0.6 m per 100 or per 60 people
With an occupancy above 200 people, the exits together must be at least 0.6 m wide per 100 people where the route leads outside at ground level, and at least 0.6 m per 60 people where it leads over stairs. Example from the appendix: 400 people over stairs give 4.0 m total width.
VKF-16-15-014
Rule
External stairs: definition and protected external walls
A stair system counts as an external stair if less than half of its plan area is enclosed by external building walls and half of the facade portion bordering the outside is permanently open, with evenly distributed openings that cannot be closed.
VKF-16-15-015
Rule
Horizontal escape routes: lead to the vertical route, subdivided above 50 m
Horizontal escape routes lead to a vertical escape route or to a safe place outside. If they are longer than 50 m, fire separations divide them so that escape routes of similar length result.
VKF-16-15-016
Rule
Access balconies: open, made of RF1, leading to the vertical escape route
Access balconies lead to vertical escape routes and consist of RF1 materials; linear load-bearing members may be combustible. They are permanently open to the outside for at least half, with evenly distributed openings that cannot be closed.
VKF-16-15-017
Rule
Doors on rescue routes openable from outside, automatic doors suitable
Doors on rescue routes must be openable from outside by the emergency services. Automatic sliding and revolving doors are allowed on escape routes if they ensure escape at all times and are suitable for this use.
VKF-16-15-018
Rule
Buildings with small dimensions: 35 m escape route, narrower stairs
In buildings with small dimensions the escape route to a safe place outside is at most 35 m and may lead through several rooms within the use unit.
VKF-16-15-019
Rule
Housing: relaxations for separations, stairs and doors
In residential buildings of low and medium height, fire separations between horizontal and vertical escape routes may be omitted if the floor area per vertical escape route is at most 900 m², the horizontal escape routes between vertical ones are subdivided with fire resistance, and they match the vertical ones in...
VKF-16-15-020
Rule
Office, trade and industry: relaxations and door dimensions
In office buildings of low height, fire separations between horizontal and vertical escape routes may be omitted if the floor area per vertical escape route is at most 900 m², the horizontal escape routes are subdivided with fire resistance and match the vertical ones in material, fire resistance and risk of...
VKF-16-15-021
Rule
Schools and day-care centres: relaxations and short routes
In school buildings of low height, fire separations between horizontal and vertical escape routes may be omitted if the floor area per vertical escape route is at most 900 m², the horizontal escape routes are subdivided with fire resistance and match the vertical ones in material, fire resistance and risk of...
VKF-16-15-022
Rule
Stairs and ramps with large occupancy: width, steps, gradient
For shops and rooms with large occupancy, the total width of stair flights and landings follows the widest exit of the connected storeys. Stairs wider than 2.4 m are divided by handrails.
VKF-16-15-023
Rule
Record occupancy, room exits directly onto escape routes
The decisive occupancy determines the number and dimensions of escape routes and is to be recorded in writing and bindingly. Where no binding data exist (e.g. seating plans), area-based assumptions apply and may be adapted to the project.
VKF-16-15-024
Rule
Shops: circulation routes 1.2 m, main routes 1.8 m, escape streets 3.6 m
Shops must have circulation routes serving escape; where they merge, main circulation routes arise. Circulation routes are at least 1.2 m wide and main routes at least 1.8 m.
VKF-16-15-025
Rule
Seating: passage 0.45 m, at most 32 or 16 seats per row
In rooms with large occupancy, seats are arranged in rows and interrupted by aisles so that the exits can be reached as directly as possible. The free passage between rows is at least 0.45 m, and circulation routes are at least 1.2 m wide.
VKF-16-15-026
Rule
Accommodation: horizontal evacuation, hotel room doors, reception
On bed floors of accommodation [a] where sick, care-dependent or assistance-dependent people are housed, the horizontal escape routes are subdivided so that, together with the patient rooms, at least two independent fire compartments allow horizontal evacuation.
VKF-16-15-027
Rule
Car parks: airlocks or forecourts for compartments above 1200 m²
If exits of a parking area lead into a vertical escape route and the fire compartment area exceeds 1200 m², fire-resistant airlocks or forecourts are to be provided. The fire resistance of the airlocks matches that of the load-bearing structure but is at least EI 30.
VKF-16-15-028
Rule
Agriculture: two exits for stables above 200 m²
Stables with a floor area above 200 m² need at least two suitably placed, sufficiently large exits through which livestock can also be evacuated. The doors open in the escape direction.
VKF-16-15-029
Rule
High-rise buildings: safety stairwells with airlocks
In high-rise buildings, storeys above ground are served by safety stairwells. These are vertical escape routes specially protected against the entry of smoke and fire (pressurized smoke control system).
VKF-16-15-030
Rule
Atria and inner courtyards: escape routes only with smoke and heat exhaust, verified
Escape routes across atria and inner courtyards are allowed if smoke and heat exhaust systems ensure safe walkability, shown by a verification. For further fire protection requirements for buildings with atria, the appendix refers to the VKF fire protection explanation on buildings with atria and inner courtyards.
VKF-25-15-001
Rule
Air-handling units serving several ventilation sections: separate room with EI 30 and EI 30 doors
Units that serve several ventilation sections are installed in a separate room. Its enclosure matches the fire resistance of the use-related compartmentation, but at least EI 30; the doors are also EI 30.
VKF-25-15-002
Rule
Outdoor air and exhaust air: safe intake and discharge
Outdoor air is taken directly from the open so that no combustible gases or vapours are drawn in. Exhaust-air ducts discharge to the open so that escaping fire gases and flames do not endanger the surroundings and cannot reach the outdoor-air intake.
VKF-25-15-003
Rule
Filters and silencers at least RF3, filter liquid with flash point above 160 °C
Filters and silencers are made of at least RF3 materials. Filter liquids have a flash point above 160 °C.
VKF-25-15-004
Rule
Fans and air-treatment units of RF1, safety devices on air heaters
Fans (except parts of no fire-safety significance) and air-treatment units with their built-in parts (air heaters, coolers, heat recovery, humidifiers) are made of RF1 materials.
VKF-25-15-005
Rule
Smoke trigger device at the extract connection of systems serving several ventilation sections
Systems that serve several ventilation sections (fire compartments combined for ventilation purposes) have a smoke trigger device at the extract connection. When it responds, it switches the system off and closes the fire dampers.
VKF-25-15-006
Rule
Ventilation ducts of RF1, exceptions at least RF3
Ventilation ducts, ventilation ceilings and floors are made of RF1 materials. At least RF3 is enough within the fire compartment of ventilation sections in office, school and dwelling units, for ventilation ceilings and floors within one compartment, for ducts cast in concrete and for earth registers.
VKF-25-15-007
Rule
Hangers and thermal insulation of ventilation ducts
Hangers and fixings of RF1 ducts are also RF1 (except vibration dampers and the like) and hold the duct securely for the required fire resistance duration. Thermal insulation of RF1 ducts is RF1; outdoor-air ducts may use at least RF3 (cr) if covered on all sides with at least 0.5 mm of RF1.
VKF-25-15-008
Rule
Ducts without openings through other sections: EI 30 or fire dampers
Ventilation ducts that run without openings through other fire or ventilation sections, or whose outlets are on the storey above or below, are built or clad with EI 30. In airlocks and vertical escape routes the fire resistance of the use-related compartmentation applies, at least EI 30.
VKF-25-15-009
Rule
Inspection and cleaning openings; no foreign installations in ventilation ducts
Ventilation ducts are arranged and fitted with openings so that they can be inspected and cleaned. Only parts that serve the system may be installed in ventilation ducts and air-carrying shafts (except ventilation ceilings and floors).
VKF-25-15-010
Rule
Duct penetration through compartment-forming components: firestop EI 30 or RF1 filling
The recess between the ventilation duct and the compartment-forming component is, allowing for thermal expansion, either filled tightly with RF1 materials (e.g. mortar, plaster) or closed with a firestop system that reaches EI 30 in compartment-forming walls and floors.
VKF-25-15-011
Rule
Fire dampers: at least EI 30-S, actuator, thermal release, self-closing
Fire dampers prevent fire and smoke from spreading through ventilation systems and are rated at least EI 30-S. They are fixed according to the declaration of performance or VKF technical information and the manufacturer's instructions, and are accessible and inspectable from outside.
VKF-25-15-012
Rule
Fire dampers where ducts cross fire compartments and ventilation sections
Fire dampers are placed where ventilation ducts pass through fire walls and compartment-forming walls and floors, and where ducts without openings run through other ventilation sections without having the required fire resistance themselves.
VKF-25-15-013
Rule
Omitting fire dampers: permitted exceptions
Fire dampers can be omitted where fire compartments can be combined structurally into ventilation sections; in office and school buildings with a ventilation-section area up to 1,200 m²; in accommodation and residential buildings up to 600 m²; for ventilation of wet cells; with separate duct routing up to the...
VKF-25-15-014
Rule
Fire-case control: system switches off automatically on alarm, otherwise manual switch-off
Ventilation systems switch off automatically when fire detection or extinguishing systems, duct smoke detectors or the thermal release of fire dampers respond. Where such devices are missing, the systems can be switched off by hand at an easily accessible place.
VKF-25-15-015
Rule
Escape routes: no open air routing, ventilation separate or with fire dampers
Escape routes do not replace ventilation ducts for open air routing. Compartment-forming escape routes are in principle ventilated separately from other ventilation systems; otherwise fire dampers belong in the compartment-forming walls, with storey-by-storey subdivision, separate ducts or separate systems.
VKF-25-15-016
Rule
Kitchen extract: grease separators, RF1 ducts, separate plant rooms from EI 60
Kitchen extract ducts are RF1 (heat-resistant) and have a grease separator or filter near the extraction point. In residential buildings RF1 is enough for hood extract; after the hood and before heat recovery a VKF-recognised shut-off device is installed.
VKF-25-15-017
Rule
Systems with air temperature above 85 °C: RF1 ducts and safety distances
At air temperatures above 85 °C the ventilation ducts are RF1 (heat-resistant) and keep a distance to combustible material: 0.1 m up to 100 °C, 0.2 m up to 200 °C, 0.4 m up to 400 °C. With a 30-minute cladding of RF1 (heat-resistant) the distances are halved.
VKF-25-15-018
Rule
Systems for explosion-hazard areas and aggressive media
Systems for fire and explosion hazard areas have separate units and ducts; if the units stand in another area they go in their own room with the fire resistance of the compartmentation, at least EI 60.
VKF-25-15-019
Rule
Ducts with increased requirements in an installation shaft: separation EI 30
Several ventilation ducts of systems with increased requirements (clauses 4.3.1 to 4.3.3) in the same installation shaft are separated storey by storey and compartment by compartment with a 30-minute fire protection board of RF1; RF1 ducts may instead be clad individually with EI 30 of RF1.
VKF-25-15-020
Rule
Cleaning, inspection and maintenance of ventilation systems and fire dampers
Ventilation systems are cleaned and maintained so that they are always ready for operation and no fire hazard arises. Fire dampers and fire-case controls are inspected periodically.
VKF-21-15-001
Rule
Smoke and heat exhaust by use, position and fire-compartment area
Depending on occupancy, number of storeys, construction type, position and use, fire compartments must be equipped with an adequately sized smoke and heat exhaust system.
VKF-21-15-002
Rule
Systems without performance proof: system type and sizing by use
For systems without performance proof the directive sets, per use, position and area, which system type is permitted: smoke clearance with fire-brigade fans, mechanical or natural systems. Sizing follows air-change rates by room height or supply and exhaust areas as a percentage of the compartment area.
VKF-21-15-003
Rule
Vertical escape routes: exhaust opening at the top, directly outdoors
Vertical escape routes get exhaust openings at the top leading directly outdoors: in low and medium-height buildings for accommodation, large occupancy and shops, in medium-height buildings for residential, office, industrial, commercial and school buildings and car parks, unless every storey has ventilation sashes...
VKF-21-15-004
Rule
Stairwell exhaust opening: 0.5 m² free, operable from the entrance level
The free geometric ventilation area of the exhaust opening at a vertical escape route is at least 0.5 m². It can be put into operation from the entrance level, and it stays operational during a power failure.
VKF-21-15-005
Rule
Purge ventilation of vertical escape routes from three basements
Vertical escape routes of buildings with three or more basements get purge ventilation. The fire protection concept sets how many escape routes are purged; every use unit reaches the purged escape route by a safe horizontal access.
VKF-21-15-006
Rule
Systems with performance proof for large offices, occupancies, sales areas and atria
A smoke and heat exhaust system with performance proof is needed for open-connected multi-storey office compartments above 3,600 m², rooms with over 2,000 people, shops with extinguishing system from 7,200 m² (single-storey) or 3,600 m² (multi-storey), and atria with an escape route or over 2,400 m² floor area.
VKF-21-15-007
Rule
Safety stairwells: smoke-protection pressurization system with overpressure against the lock
Stair enclosures of safety stairwells that are not reached on every storey through permanently open access balconies or forecourts get a smoke-protection pressurization system. The stair enclosure holds a higher overpressure than the lock.
VKF-21-15-008
Rule
Functional integrity of plant parts for at least 30 minutes
The system follows the state of the art and is built, sized and maintained so that it is effective and ready for operation at all times.
VKF-21-15-009
Rule
Exhaust openings: highest point, on façades evenly on two opposite sides
Exhaust openings are placed so that effective smoke clearance is possible without danger to people and buildings, at the highest point of the room, for example in the roof or in the ceiling or roof zone of the façades.
VKF-21-15-010
Rule
Hot-gas fans: temperature resistance and installation room of at least EI 30
Suitable hot-gas fans are used to extract the smoke gases; they withstand at least 400 °C for the required operating time, in compartments with a water-based extinguishing system and in vertical escape routes at least 200 °C.
VKF-21-15-011
Rule
Smoke-extraction ducts and dampers: fire resistance of the crossed compartment, dampers at least EI 30
Shafts and ducts withstand the expected stresses and prevent fire and smoke spread when hot fire gases are extracted; length expansion is taken up by fixed points and compensators, and plastic anchors are not permitted for exhaust ducts.
VKF-21-15-012
Rule
Make-up air: inflow openings near the floor, matched to the exhaust openings
Installing a smoke and heat exhaust system requires that the make-up air needed for effective extraction can flow in. Inflow openings, such as façade openings, doors, gates or windows, are placed near the floor and matched to exhaust openings and extract volumes.
VKF-21-15-013
Rule
Operation and triggering: manual release at a safe location, automatic release with performance proof
Systems can be started by hand from a location that is safe in case of fire; the control points show operating, fault and out-of-service states. The fire protection authority can additionally require automatic release.
VKF-21-15-014
Rule
Power supply for safety purposes independent of the general supply
Smoke and heat exhaust systems and smoke-protection pressurization systems are connected to suitable power sources that are independent of the general power supply. Not yet checkable: the model holds no trigger and control points of the system and no power source for safety purposes.
VKF-21-15-015
Rule
Use of ventilation systems for smoke extraction only if RWA requirements are met
Ventilation and air-conditioning systems may be used for smoke and heat extraction only if the affected plant parts meet the requirements for smoke and heat exhaust systems. Not yet checkable: the model holds no smoke and heat exhaust system and no assignment of one to fire compartments.
VKF-21-15-016
Rule
Concepts: fire-brigade fans down to the 1st basement, natural systems not below ground, extraction under the ceiling
Smoke clearance with fire-brigade fans assumes response forces on site within 15 minutes of the alarm, needs inlet openings for setting up the fans in addition to the exhaust openings, and below ground is permitted only down to the 1st basement unless supply air comes from outdoors on the same level.
VKF-21-15-017
Rule
Project review, acceptance, periodic inspection and maintenance
On request of the fire protection authority, projects are submitted for approval in good time. Systems with performance proof are accepted after an installation certificate exists, as are extensions and substantial changes.
VKF-18-15-001
Rule
Extinguishers and hose reels by use and area
Buildings and installations with particular hazards are equipped with suitable, adequately sized means for first-response firefighting; number, type and arrangement depend on occupancy, construction, position, extent and use.
VKF-18-15-002
Rule
Extinguishing agent matched to fire class and room, portable extinguishers where water is unsuitable
The suitability of extinguishers and extinguishing systems depends on handling, properties and quantity of the agent; adverse side effects count. Fire classes A, B, C, D and F are distinguished.
VKF-18-15-003
Rule
Extinguishers and fire-fighting pipes clearly visible, easily accessible and marked
Extinguishers and fire-fighting pipes are clearly visible and easily accessible; where needed, markings or signs identify the location. They can be put into operation quickly and simply at any time without outside aids and used as intended.
VKF-18-15-004
Rule
Extinguishers close to room exits that serve as escape routes, or in escape routes
Within fire compartments, extinguishers are placed in the immediate vicinity of room exits that serve as escape routes, or in escape routes such as corridors and forecourts.
VKF-18-15-005
Rule
Extinguishers in vertical escape routes only under conditions, hose reels not in safety stairwells
Extinguishers may stand in vertical escape routes if there are no fire doors between vertical and horizontal escape routes, for example in office and school buildings up to 900 m² gross floor area, or if several rooms are accessed directly from the vertical escape route. Hose reels in safety stairwells are not allowed.
VKF-18-15-006
Rule
Uniform arrangement, open placement or cabinet without weakening the fire resistance
With similar floor plans and room layouts, extinguishers are arranged as uniformly as possible. They stand in the open or in separate cabinets; recessed cabinets must not weaken the fire resistance of compartment-forming walls.
VKF-18-15-007
Rule
Extinguishers: walking line to the nearest device at most 40 m
Extinguishers are distributed so that a fire can be fought at any point; the walking line to the nearest extinguisher is at most 40 m. In areas with particular fire hazards, additional devices are installed at suitable places.
VKF-18-15-008
Rule
Hose reels: valve of at least DN 32, form-stable hose up to 40 m with nozzle
A hose reel consists of a shut-off valve with a connection of at least DN 32, a movable connection to the swivelling reel, and a form-stable rubber hose with a shut-off nozzle for jet and spray. In special cases, such as agricultural buildings, an equivalent device may replace the reel.
VKF-18-15-009
Rule
Hose-reel supply line: at least DN 32 in RF1, 3 bar static pressure, 16 l/min
The supply line to a hose reel is at least DN 32 and made of materials of reaction-to-fire group RF1; combustible pipes are laid under plaster with fire resistance EI 30 or equally protected. A static pressure of 3 bar prevails at the hose reel and the flow is at least 16 l/min.
VKF-18-15-010
Rule
High-rise buildings: fire-fighting risers with interior hydrants (at least DN 80) or pressure-boosting connection
High-rise buildings are equipped with fire-fighting installations such as wet or dry risers, hose reels with interior hydrants (supply line at least DN 80) or pressure-boosting connections. The requirements are set case by case with the fire protection authority.
VKF-18-15-011
Rule
Dry and cooling extinguishing systems: scope, subdivision, sizing and pressure relief
The scope of special dry and cooling extinguishing systems is limited to individual rooms, areas and equipment. Arrangement and sizing ensure effective cooling or extinguishing effect; pressure-relief openings are installed and large areas are subdivided.
VKF-18-15-012
Rule
Safety of people with dry extinguishing systems: pre-warning, self-closing doors, danger sign
Dry extinguishing systems get warning and delay devices if flooding can endanger people. The pre-warning time between the alarm signal and release of the agent is long enough to leave the flooding zone safely from any point.
VKF-18-15-013
Rule
Release of special extinguishing systems automatic or manual, with signal and internal alarm
Cooling or extinguishing agent can be released automatically or by hand. Systems with automatic release can also be operated by hand.
VKF-18-15-014
Rule
Instruction, project, acceptance, periodic inspection and maintenance
Persons responsible for a business instruct staff in the handling of extinguishers and special systems. Projects for dry and cooling extinguishing systems are submitted for approval before construction starts when required, and the systems are accepted and inspected periodically.
VKF-20-15-001
Rule
Fire alarm system by occupancy and use, special buildings on request
Depending on occupancy and use, buildings, installations or fire compartments are equipped with an adequately sized fire alarm system. It can be required for early alerting of rescue forces, for early activation of fire protection and building services systems, and in large and complex buildings.
VKF-20-15-002
Rule
Industry, commerce, offices: monitoring when compartments are exceeded, smouldering fires or ban on water
For industrial, commercial and office buildings the fire protection authority can require monitoring if the permitted compartment sizes are exceeded and the system makes sense for the current use, if slowly developing fires such as smouldering fires are expected, or if water must not be used as extinguishing agent.
VKF-20-15-003
Rule
Accommodation: fire alarm system with full monitoring by category, number of storeys and persons
In accommodation of category a a fire alarm system with full monitoring is required.
VKF-20-15-004
Rule
Shops: manual call points added to the sprinkler system; large occupancy on request
In shops the sprinkler system is supplemented with manual call points; in sub-areas or individual rooms a fire alarm system is installed where needed to activate technical fire protection equipment. For rooms with large occupancy the fire protection authority can require a fire alarm system.
VKF-20-15-005
Rule
Monitoring extent: full monitoring, partial monitoring over whole fire compartments
Fire alarm systems should be designed as full monitoring and then cover entire buildings and installations, except expressly exempted rooms separated with fire resistance.
VKF-20-15-006
Rule
Areas that may be exempted from monitoring
Exemptions are possible, among others, for installation shafts that are inaccessible or free of ignition hazards, wet rooms without combustible stock, lift shafts with a separate machine room, residential areas separated as a fire compartment, cold rooms up to 50, 200 or 600 m² depending on insulation and...
VKF-20-15-007
Rule
Fire-brigade control and indicating unit at a safe, easily accessible location
Fire-brigade control and indicating units of systems with more than one detector zone stand at a safe location that is easily accessible for the fire brigade, in the escape route or at the fire-brigade access. The operating-state indication is in the immediate vicinity, and unobstructed access is ensured.
VKF-20-15-008
Rule
Alerting: internal and external alarm, delays of at most 3 and 5 minutes
Every response triggers an internal and an external alarm; the external one goes directly to the public fire alarm receiving point. Switch-offs and faults are signalled visually and audibly and forwarded to a permanently staffed point.
VKF-20-15-009
Rule
Fire-mode controls: activation of fire protection equipment, documented and tested
The fire alarm system can trigger fire doors and shutters, smoke and heat exhaust systems, transport systems and ventilation systems. For selective fire-mode controls the trigger is as a rule not by manual call points, which is considered in the fire protection concept.
VKF-20-15-010
Rule
Fire alarm control panel: safe location, monitored compartment, several panels in a room with EI 30
Fire alarm control panels and remote indicating panels stand at a safe, easily accessible location; the fire compartment of the panel is monitored.
VKF-20-15-011
Rule
Detector zones: fire location clearly identifiable, vertical shafts combined
The entire monitored area is divided into detector zones so that the fire location is shown quickly and unambiguously. Vertical escape routes, light, lift and installation shafts and tower-like structures form one common detector zone.
VKF-20-15-012
Rule
Manual call points in escape routes and hazardous areas, clearly visible, mounting height about 1.5 m
Manual call points are fitted clearly visibly in escape routes, for example at exits, passages, vertical escape routes and extinguishers, and in particularly hazardous areas.
VKF-20-15-013
Rule
Room indicator lamps at entrances to monitored rooms, at least 1.7 m above floor
So that the fire brigade can quickly locate the fire, indicator lamps are installed at entrances to monitored rooms and at raised floors and hollow ceilings, at least 1.7 m above floor.
VKF-20-15-014
Rule
Special applications: detectors for high rooms, inaccessible places and special environments with consent
Detectors for special applications are used where point detectors are unsuitable or only partly suitable because of environmental influences or room conditions, for example outdoors, in cable tunnels, high halls, inaccessible voids, fume cupboards, silos or heritage buildings.
VKF-20-15-015
Rule
Specialist firm, documentation, switch-off, project, acceptance, inspection and review after 15 years
Fire alarm systems are planned, installed and maintained by VKF-recognised specialist firms, with components covered by a declaration of performance or VKF technical information. Orientation plans at the fire-brigade access and a logbook at the control panel are kept.
VKF-19-15-001
Rule
Sprinkler system by occupancy and use, creditable against fire resistance and compartment size
Depending on occupancy and use, buildings, installations or fire compartments are equipped with an adequately sized sprinkler system. It can be taken into account when setting the fire resistance of structures and compartment-forming walls and floors and the permitted compartment size.
VKF-19-15-002
Rule
Industry, commerce, offices: sprinklers for exceeded compartments, fast fires, hazardous substances or high fire load
For industrial, commercial and office buildings the fire protection authority can require a sprinkler system if the permitted compartment sizes are exceeded and the system makes sense for the use, if fast-developing fires are expected, the ignition hazard is high, hazardous substances are handled or stored, or the...
VKF-19-15-003
Rule
Shops above 2,400 m² compartment area: sprinklers including adjoining storage and service rooms
Shops with more than 2,400 m² compartment area, including the adjoining storage and service rooms, are protected by sprinkler systems and supplemented with manual call points. Not yet checkable: the model does not show use, occupancy, number of storeys and compartment size per fire compartment.
VKF-19-15-004
Rule
Car parks and garages: sprinklers from 4,800, 2,400 or 9,600 m² and for compact parking above 50 vehicles
Underground garages need sprinklers from 4,800 m² compartment area per storey, multi-storey ones with open connections from 2,400 m². Closed above-ground garages need them from 4,800 m², partly open ones (enclosure with 25 % non-closable openings) from 9,600 m² per storey.
VKF-19-15-005
Rule
Rooms with large occupancy: sprinklers on request
In buildings and installations with rooms of large occupancy the fire protection authority can require sprinkler systems. Not yet checkable: the model does not show use, occupancy, number of storeys and compartment size per fire compartment.
VKF-19-15-006
Rule
Protected extent: full protection, partial protection over whole compartments, annexes and canopies
Sprinkler systems should be designed as full protection and cover entire buildings and installations, except expressly exempted rooms separated with fire resistance. Partial protection covers at least one whole fire compartment.
VKF-19-15-007
Rule
Permitted exceptions from sprinkler protection
Sprinklers can be omitted, among others, in wet rooms without combustible stock, technical rooms with low fire hazard as a separate compartment, small rooms up to 4 m², cold rooms up to 50, 200 or 600 m² depending on insulation and separation, crawl spaces without fire load, vertical escape routes separated with...
VKF-19-15-008
Rule
Water unsuitable: substitute measures with equivalent protection in the fire protection concept
Where water is not a suitable extinguishing agent, for example for silos with swelling contents, industrial furnaces and baths with increased hazard, substances that form combustible gases with water, or other endangered areas, substitute measures with equivalent protection are taken in agreement with the fire...
VKF-19-15-009
Rule
Sprinkler control room: separate compartment of at least EI 30, between 1st upper floor and 1st basement, secured access
Sprinkler control rooms are located in separate fire compartments with the fire resistance of the use-related compartmentation, at least EI 30, with EI 30 doors.
VKF-19-15-010
Rule
Water supply: reliable, connection to public network or own supply, nominal operating time 45 to 90 minutes
The sprinkler system requires a powerful, reliable water supply with the required connection capacity and pressure. It is connected to the public network in principle; if its capacity including the reserve for the fire brigade is insufficient, an own, combined or independent supply is needed.
VKF-19-15-011
Rule
Alerting and control: undelayed internal and external alarm via the fire alarm system
Every response triggers an internal and an external alarm without delay; the external one goes via a VKF-recognised fire alarm system to the public fire alarm receiving point. Faults are signalled visually and audibly and forwarded to a permanently staffed point.
VKF-19-15-012
Rule
Shut-off valves only in the sprinkler control room; tested components
All plant parts are made of suitable materials and withstand the stresses; only sprinkler components with a declaration of performance or VKF technical information are used. Additives in the extinguishing water need a water-protection approval in addition to the fire protection one.
VKF-19-15-013
Rule
Specialist firm, documentation, switch-off, project, acceptance, inspection and general overhaul
Sprinkler systems are planned, installed and maintained by VKF-recognised specialist firms and adapted on changes, extensions or changes of use. The control room holds the system documentation and a logbook, the fire-brigade access holds orientation plans.
VKF-24-15-001
Rule
Heating plant: safe operation, verified products and permanent marking
Heating plant is built and installed so that it operates safely and damage in case of a fault stays limited; all parts withstand the thermal, chemical and mechanical stresses.
VKF-24-15-002
Rule
Ban on installing heat generators in escape routes, explosion-hazard rooms and rooms with high fire load
Heat generators must not be installed in escape routes, in rooms and zones with fire or explosion hazard, or in rooms with large and very large fire load. Not yet checkable: the model does not show nominal heat output, fuel, type of installation and fire resistance of the boiler room.
VKF-24-15-003
Rule
Single-family houses and flats: solid-fuel firing units in a room with EI 30
For liquid and gaseous fuels the construction and finish of the installation room are unrestricted.
VKF-24-15-004
Rule
Boiler room in buildings with several compartments: EI 30 up to 70 kW, EI 60 above, doors EI 30
Firing units stand in separate boiler rooms. Their fire resistance depends on the total nominal heat output: up to 70 kW the use-related compartment value, at least EI 30; above that at least EI 60.
VKF-24-15-005
Rule
Boiler room with direct access from outdoors: above 1,200 kW on ground floor or lower, above 600 kW from 2nd basement
Boiler rooms on the ground floor or lower for plants above 1,200 kW nominal heat output, and boiler rooms on the second basement or lower for plants above 600 kW, get direct access from outdoors.
VKF-24-15-006
Rule
Open installation in single-storey halls and commercial buildings with low fire load
In single-storey halls and multi-storey industrial and commercial buildings with use-related compartments, firing units of any output may stand openly if operation requires it, the clearances are kept and the fire load in the room is low.
VKF-24-15-007
Rule
Ventilation and combustion air: supply from outdoors, openings not closable
Room-air-dependent firing units stand only in ventilated rooms, and combustion air must be supplied from outdoors. Combustion-air openings must not be closed unless a safety device allows operation only with the closure open.
VKF-24-15-008
Rule
Accessibility, safety devices and shut-off devices of firing units
Units and flue system are easily accessible for operation, maintenance and cleaning at all times.
VKF-24-15-009
Rule
Base plate, floor protection and wall behind firing units in heat-resistant RF1
On combustible floor constructions firing units stand on a base plate of heat-resistant RF1, individually made units such as tiled stoves on a 0.12 m thick slab of stone, concrete or equivalent. In front of solid-fuel units lies a heat-resistant RF1 floor covering extending 0.4 m in front of the loading opening.
VKF-24-15-010
Rule
Clearances to combustibles: 0.1 / 0.2 / 0.4 m by surface temperature, 0.8 m and 2 m for radiation
Adequate clearances apply to all combustible materials, as given in the declaration of performance or VKF technical information, otherwise 0.1 m for surface temperatures up to 100 °C, 0.2 m up to 200 °C and 0.4 m up to 400 °C.
VKF-24-15-011
Rule
Fireplaces, tiled stoves, pellet firing units, commercial kitchens and cookers
For fireplaces the information of the declaration of performance or VKF technical information applies. Tiled and storage stoves keep 0.2 m at the sides, back and top and 0.5 m at the firing opening from combustibles and have cleaning openings.
VKF-24-15-012
Rule
Mobile firing units and small appliances: clearance, combustion air, no continuous heating without flue
Mobile firing units such as building dryers or air heaters keep as much distance from combustibles as comparable stationary units, need sufficient combustion air and, without direct flue routing, stand only in open halls, shells or well-ventilated rooms, not openly in rooms with large occupancy.
VKF-24-15-013
Rule
Flue systems: system flues, suitable materials, RF1 insulation, classification and marking
Flue systems and connecting pipes discharge the flue gases safely, can be cleaned and create no fire hazard. Only system flues made of heat-resistant construction products and suitable materials are used; thermal insulation is RF1.
VKF-24-15-014
Rule
Flue systems: connections, continuous routing and minimum height above roof
Only units that in normal operation do not produce flue gases hotter than the system allows are connected; connecting pipes enter in the same storey and fire compartment.
VKF-24-15-015
Rule
Flue systems through compartments: EI 60 vertically, compartment value horizontally, distance to combustibles, fill-in
Flue systems running vertically through several compartments have EI 60 of heat-resistant RF1 outside the installation room or sit in such a fire protection element, in single-family houses and flats EI 30; horizontally the fire resistance of the compartment applies.
VKF-24-15-016
Rule
Explosion flaps, flue fans and cleaning openings
For fuels prone to deflagration, such as fine-grained coal or wood chips, explosion flaps belong in the flue system, in the boiler room close to the connecting pipe entry and at least the cross-section of the flue. Flue fans create positive pressure only if the system is approved for it.
VKF-24-15-017
Rule
Solid fuels: daily consumption in the installation room, store EI 60, at most 10 m³ in the boiler room
Only a day's consumption may be stored in the installation room, shielded from the unit; larger quantities go into other rooms or outdoors. In single-family houses wood or coal up to 5 m³ is allowed in rooms of any construction.
VKF-24-15-018
Rule
Heating oil: up to 4,000 l small tanks or 8,000 l steel tanks in a boiler room EI 60, delivery systems not in escape routes
In separate boiler rooms with EI 60, heating oil up to 4,000 l in small tanks or up to 8,000 l in steel tanks may be stored; the directive on hazardous substances applies in addition.
VKF-24-15-019
Rule
Operational readiness and maintenance of heating plant
Owners or operators ensure that heating plant is maintained as intended and is ready for operation at all times.
VKF-26-15-001
Rule
Hazardous substances from 100 kg: GHS classification, protection by type and quantity, fire protection concept before construction
The directive covers storage and handling of hazardous substances and preparations from 100 kg, unless other quantities are named. Substances are classified under the GHS, pyrotechnics under explosives law; diesel and heating oil count as combustible without classification.
VKF-26-15-002
Rule
No hazardous substances in escape routes or in front of exits; on-site overview, instruction, adaptation on change
Hazardous substances must not be kept in passages or drive-throughs, in horizontal or vertical escape routes, or in front of entrances and exits.
VKF-26-15-003
Rule
Maximum stored quantity per fire compartment: 50 t, 200 t with fire alarm, 600 t with sprinklers (by substance class)
Maximum quantities in tonnes per fire compartment depend on substance classification. For highly flammable, oxidising and self-igniting substances: 50 t without fire alarm or sprinklers, 200 t with a fire alarm, 600 t with sprinklers (2,400 t for rack storage with automatic sprinklers and foam admixture).
VKF-26-15-004
Rule
Rooms at fire or explosion risk: zones, pressure relief and fire compartment; storage rooms as fire compartments
Rooms are classified by fire and explosion hazard and divided into zones; type, quantity, frequency and duration of combustible gases, dusts or vapours decide.
VKF-26-15-005
Rule
Ventilation of hazardous concentrations; fans and ignition sources in hazard zones
Rooms or zones where combustible gases, vapours, mists or dusts can accumulate dangerously are ventilated naturally or artificially to a sufficient extent. Fans and their drives in explosion-hazard zones or in exhaust ducts must not become effective ignition sources.
VKF-26-15-006
Rule
Lightning protection: gases above 1,000 kg, combustible liquids above 2,000 l, tyre stores, large pyrotechnic stores
Buildings and plant holding hazardous substances are protected against ignition by lightning. Combustible gases: up to 450 kg net no measures, up to 1,000 kg earthing or equipotential bonding of conductive parts, above that a lightning protection system.
VKF-26-15-007
Rule
Extinguishing equipment in hazard buildings; fire alarm, gas warning or extinguishing systems as needed
In buildings and plant with rooms or zones at fire or explosion risk, suitable extinguishing equipment is installed at suitable places and in sufficient number. Where conditions require it, fire alarm systems, gas warning systems or extinguishing systems are added.
VKF-26-15-008
Rule
Storage concept, substance segregation in separate fire compartments and hazard signs
A storage concept is drawn up for stores with hazardous substances (inventory, location, type and container, structural, technical and organisational measures).
VKF-26-15-009
Rule
Gas cylinders: not in escape routes, ventilated, from 200 l cylinder volume outdoors or in a separate fire compartment
Gas cylinders are protected against excessive heating, mechanical damage and falling over and are not stored together with highly flammable or self-igniting substances. In escape routes they are neither connected nor stored; rooms with connected or stored cylinders are sufficiently ventilated.
VKF-26-15-010
Rule
Cryogenic tanks outdoors with a 5 m protected zone EI 60; liquefied petroleum gas not in basements
Cryogenic tanks (vacuum-insulated tanks for deep-cooled liquefied oxidising or asphyxiant gases) stand outdoors and not in depressions.
VKF-26-15-011
Rule
Aerosol packs: stored apart, below 50 °C, from 100 l behind a grille, flammable ones ventilated
Aerosol packs (spray cans) are stored in rooms with low fire risk, locally separated from other stored goods, and kept and used so that they do not warm above 50 °C. Above 100 l they stand behind a grille (e.g. pallet with cage frame, mesh box).
VKF-26-15-012
Rule
Combustible liquids: prevent spreading, vapours not into lower rooms, flash point ≤ 23 °C only in permitted containers
Leaking combustible liquids must not spread (e.g. raised door thresholds, drainage channels, separators, drip trays), and their vapours must not reach lower rooms, sewers, shafts or pits. Heating devices are thermally secured; no heating with open flames or unprotected heat sources.
VKF-26-15-013
Rule
Storage rooms for combustible liquids: EI 30 doors, access opening at least 0.7 × 1 m with an EI 30 cover
Storage rooms for combustible liquids are closed off from other rooms with EI 30 doors. Access to tank rooms is by openings of at least 0.7 × 1 m, closed with EI 30 covers.
VKF-26-15-014
Rule
Containers and small tanks: requirement for room or cabinet by stored quantity (25 l to over 2,000 l) and flash point
For combustible liquids with a flash point up to 60 °C, per compartment: up to 25 l a room of any construction; 26 - 100 l an RF1 cabinet with collecting tray and marking; 101 - 450 l a room EI 30 with low fire risk; 451 - 2,000 l a room EI 60 without additional fire loads; above 2,000 l a room EI 90 without...
VKF-26-15-015
Rule
Medium-sized tanks: up to 10,000 l flash point ≤ 60 °C in a room EI 90, up to 250,000 l above that in a room EI 60
In a room EI 90 without additional fire loads, at most 10,000 l of combustible liquids with a flash point up to 60 °C may be stored; special protective measures are needed (e.g. mechanical ventilation, extinguishing system, gas detection).
VKF-26-15-016
Rule
Ventilation for highly flammable liquids: natural openings 20 cm² per m², artificial 3 to 5 air changes, 10 during handling
Storage rooms count as sufficiently naturally ventilated when above ground with at least two opposite non-closable openings to the outside, one of them at most 0.1 m above the floor, each at least 20 cm² per m² of floor area.
VKF-26-15-017
Rule
Oxidising substances: from 100 kg own fire compartment EI 60, outdoors 5 m distance or screen wall EI 60
Oxidisers may be stored with other hazardous substances in the same compartment up to 100 kg in total, if 2.5 m distance to combustible materials is kept or partition walls EI 30 of RF1 are installed.
VKF-26-15-018
Rule
Substances with special fire behaviour: closed RF1 containers, dry, stock above need in a separate marked room
Self-igniting substances are kept in closed RF1 containers excluding air, in an inert atmosphere or under regular temperature monitoring.
VKF-26-15-019
Rule
Open-air tyre stores: area 2,400 or 4,800 m², sections of 100 m² with 10 m spacing, 10 m to buildings
Up to 1 t or less than 10 m² of storage area, no requirements apply. Stores are protected against unauthorised access, and fire protection and fire brigade intervention plans exist.
VKF-26-15-020
Rule
Tyre stores in buildings: on an exterior wall, EI 60 up to 60 t/600 m², above that EI 90 with sprinklers and foam
Stores are on an exterior wall and have clearing openings of at least 2 × 2 m leading directly outdoors. Up to 100 m² the store may stand in the usage unit without fire-resistant separation.
VKF-26-15-021
Rule
Petrol pumps outside buildings with 3 m distance or an EI 60 wall without openings
Petrol pumps stand outside buildings and installations and keep 3 m distance from them. The distance may be smaller if the building wall within 3 m on both sides and 1 m above the pump is EI 60 and without openings.
VKF-26-15-022
Rule
High-bay racking with hazardous substances: extinguishing system, 18 m storage height, ventilation, aisles as fire compartments
High-bay racking is protected with automatic extinguishing systems.
VKF-26-15-023
Rule
Stores of pyrotechnic articles: cool and dry, locked, EI 30 doors opening in escape direction, extinguishing equipment at the entrance
Pyrotechnic articles stay in their shipping and packaging units. Storage rooms are cool, dry, well ventilated and kept at as constant a temperature as possible.
VKF-26-15-024
Rule
Pyrotechnic stores by quantity: up to 50 kg EI 30, up to 300 kg EI 60, up to 1,000 kg on an exterior wall, above that free-standing with 20 m distance
Up to 50 kg gross (temporary, at most 1 month) rooms are built EI 30 and, with low fire risk, may serve other purposes. Up to 300 kg gross, rooms EI 60 without other use are needed.
VKF-26-15-025
Rule
Night and short-term stores of pyrotechnic articles: RF1 containers with 5 or 10 m distance or an EI 60 screen wall
The day's stock from outdoor sales is kept outside opening hours in storage rooms under 11.2.1 to 11.2.5. Fireworks of categories 1 to 3 may be stored up to 1,000 kg gross in free-standing, dedicated RF1 containers.
VKF-26-15-026
Rule
Sale of pyrotechnic articles in buildings: not in basements, stock at most 30 kg, sales stand not at escape routes
The person responsible for sales oversees the display area from their workplace; within 2 m of the stand smoking is banned with a clearly visible sign, and a portable extinguisher (water, spray or air foam) is ready.
VKF-26-15-027
Rule
Outdoor sale of pyrotechnic articles: day's stock, at most 300 kg, 5 m to facades and escape exits
Outdoors the stock does not exceed the day's need; outside opening hours it is kept in the night store. At most 300 kg gross are at the sales stand.
VKF-26-15-028
Rule
Fireworks: not inside buildings; stage pyrotechnics only in designated areas, stock at most 50 kg in a room EI 30
Fireworks for entertainment must not be set off inside buildings and installations; category 4 is reserved for commercial use by qualified persons.