Rule Fire protection directive 20-15 Fire alarm systems

Specialist firm, documentation, switch-off, project, acceptance, inspection and review after 15 years

VKF-20-15-015 pragmaticBIM.ch/vkf-20-15-015

Fire alarm systems are planned, installed and maintained by VKF-recognised specialist firms, with components covered by a declaration of performance or VKF technical information. Orientation plans at the fire-brigade access and a logbook at the control panel are kept.

Description

Systems are in principle not switched off; longer interruptions must be reported and decommissioning needs approval. Projects (over 10 detectors or 600 m²) are submitted before execution, the systems are accepted, inspected periodically and reviewed after 15 years; owners or operators keep them ready for operation.

Source

VKF-Brandschutzrichtlinie 20-15 Brandmeldeanlagen (2015) (p. 9)