Boundary condition Boundary conditions
Fit-out state at handover
PG-18
pragmaticBIM.ch/pg-18
The fit-out state at handover sets where the base build ends and the tenant fit-out begins. Cost interfaces and building services per tenant unit depend on it.
Variants
-
AUS-01Connections only
Shell with connections for water, wastewater, power, and ventilation at the boundary of the tenant unit.
Activates: Visualize cost interfaces between base building and tenant fit-out
-
AUS-02White room
Floors, walls, and ceilings finished, with basic lighting and sockets. The tenant fits out the interior.
Activates: Visualize cost interfaces between base building and tenant fit-out
-
AUS-03Fitted out with media
Fully fitted out, with media such as water, gas, ventilation, and data up to the appliances.
Activated use cases
DES · Design
-
DES-MEP-USAGE-AGREEMENTVisualize the MEP usage agreement room by room
Record agreed room conditions and usage assumptions in the model and present them in readable thematic plans.
QAS · Quality assurance
-
QAS-COST-INTERFACEVisualize cost interfaces between base building and tenant fit-out
Before tendering and after every contract change, check that the cost bearers in the model match the split between base building and tenant fit-out agreed in the lease.
More boundary conditions
-
PG-06
Working with existing buildings
This framework condition determines which existing-condition information is procured: spatial reference and terrain only; those plus the building mass and structural shell; or structural shell, fit-out, and MEP.
-
PG-02
Use & fit-out standard
This framework condition determines which uses the building accommodates and which fit-out standard applies to which spaces. It is the basis for designing spaces to suit their use and for checking the agreed requirements traceably.
-
PG-39
Accessibility
This framework condition sets how far the building is accessible beyond the legal minimum under SIA 500: adaptable or wheelchair-accessible throughout. It drives doors, spaces, and circulation.