Digital resident information

COM-QR-STAKEHOLDER-INFO pragmaticBIM.ch/com-qr-stakeholder-info

Keep residents informed continuously via letter or notice with a QR code about measures and site installation, so those affected can inform themselves instead of guessing or complaining.

Starting point

  • Noise, dust, and traffic during construction are often perceived as uncontrolled when residents do not know what is happening and why.
  • A static notice ages quickly and is soon ignored.
  • Without ongoing information, questions and frustration land directly with the site management - more effort for both sides than a prepared answer.

Goal & benefit

  • Residents can inform themselves at any time without calling or visiting.
  • Transparency about ongoing measures reduces complaints and escalation pressure.
  • Current information instead of rumour - less stress on both sides.

Process

  1. Set up the landing page and editorial process with clear responsibility for updates.
  2. Distribute a letter or notice with QR code to affected residents (mail, neighbourhood notice).
  3. Keep measures and site installation on the landing page up to date with current text and images.

Deliverable

  • Letter or notice with QR code, distributed to affected residents
  • Landing page with current measures and images of the site installation
  • Editorial process with clear responsibility for updates

Ways to do it

  • Digitale Anwohnerinformation BDFsmart GmbH editorial listing

    Residents check the platform on mobile devices and receive short-notice changes to the construction schedule.

    Visit vendor · last checked

  • infraMessage inframeta eG editorial listing

    Web and app service for digital construction site resident notifications using project-specific links and QR codes.