Use case Ordering

Plan measures for hazardous-material findings

QAS-HAZMAT-CHECK pragmaticBIM.ch/qas-hazmat-check

Assign hazardous-material findings to the affected existing components and use them as a basis for planning remediation, deconstruction, and protection measures.

Starting point

  • Hazardous-material surveys often exist only as reports or tables and are difficult to relate to the affected components and areas.
  • Without spatial assignment, there is no reliable basis for coordinating interventions, protective precautions, and remediation work.

Goal & benefit

  • Show the hazardous-material type, location, and remediation urgency clearly in the existing-building model.
  • Identify affected areas early and coordinate the required measures before alteration or deconstruction.

Process

  1. Assign survey findings to the modelled existing components.
  2. Evaluate and visualize affected components by hazardous-material type and remediation urgency.
  3. Define remediation, deconstruction, and protection measures and their sequence.

Deliverable

  • Existing-building model with spatially assigned hazardous-material findings and remediation urgencies
  • Documented basis for planning and coordinating the required measures

Ways to do it

  • BIMcollab Nexus BIMcollab editorial listing

    Cloud platform for BCF issues and coordination across multiple authoring and checking tools.

    Visit vendor · last checked

  • BIMcollab Zoom BIMcollab editorial listing

    IFC viewer and model checking with rules, colouring by properties and BCF issues.

    Visit vendor · last checked

  • Dalux Field Dalux editorial listing

    Site app for defects, checklists, drawings and models on site, including 360° captures.

    Visit vendor · last checked

Suggest a tool All tools and services

Elements involved

Contact

abstract ag

Imprint · Picassoplatz 4, 4052 Basel