Use case Ordering
Plan measures for hazardous-material findings
QAS-HAZMAT-CHECK
pragmaticBIM.ch/qas-hazmat-check
Assign hazardous-material findings to the affected existing components and use them as a basis for planning remediation, deconstruction, and protection measures.
Starting point
- Hazardous-material surveys often exist only as reports or tables and are difficult to relate to the affected components and areas.
- Without spatial assignment, there is no reliable basis for coordinating interventions, protective precautions, and remediation work.
Goal & benefit
- Show the hazardous-material type, location, and remediation urgency clearly in the existing-building model.
- Identify affected areas early and coordinate the required measures before alteration or deconstruction.
Process
- Assign survey findings to the modelled existing components.
- Evaluate and visualize affected components by hazardous-material type and remediation urgency.
- Define remediation, deconstruction, and protection measures and their sequence.
Deliverable
- Existing-building model with spatially assigned hazardous-material findings and remediation urgencies
- Documented basis for planning and coordinating the required measures
Ways to do it
-
BIMcollab Nexus BIMcollab editorial listing
Cloud platform for BCF issues and coordination across multiple authoring and checking tools.
Visit vendor · last checked
-
BIMcollab Zoom BIMcollab editorial listing
IFC viewer and model checking with rules, colouring by properties and BCF issues.
Visit vendor · last checked
-
Dalux Field Dalux editorial listing
Site app for defects, checklists, drawings and models on site, including 360° captures.
Visit vendor · last checked
Suggest a tool All tools and services
Elements involved
Architecture (21)