Rule Fire protection directive 24-15 Heating plant
Heating plant: safe operation, verified products and permanent marking
VKF-24-15-001
pragmaticBIM.ch/vkf-24-15-001
Heating plant is built and installed so that it operates safely and damage in case of a fault stays limited; all parts withstand the thermal, chemical and mechanical stresses.
Description
The fire protection authority decides on fire protection products based on declarations of performance, test evidence or the VKF fire protection register; where VKF approvals are needed, a permanent, easily recognisable marking stays visible after installation. Not yet checkable: the model does not show nominal heat output, fuel, type of installation and fire resistance of the boiler room.
Source
VKF-Brandschutzrichtlinie 24-15 Wärmetechnische Anlagen (2015) (p. 5)
More rules for Fire protection directive 24-15 Heating plant
-
VKF-24-15-002
Ban on installing heat generators in escape routes, explosion-hazard rooms and rooms with high fire load
Heat generators must not be installed in escape routes, in rooms and zones with fire or explosion hazard, or in rooms with large and very large fire load. Not yet checkable: the model does not show nominal heat output, fuel, type of installation and fire resistance of the boiler room.
-
VKF-24-15-003
Single-family houses and flats: solid-fuel firing units in a room with EI 30
For liquid and gaseous fuels the construction and finish of the installation room are unrestricted.
-
VKF-24-15-004
Boiler room in buildings with several compartments: EI 30 up to 70 kW, EI 60 above, doors EI 30
Firing units stand in separate boiler rooms. Their fire resistance depends on the total nominal heat output: up to 70 kW the use-related compartment value, at least EI 30; above that at least EI 60.