Use case Design Schedule & coordination
Plan complex assemblies and intermediate states
DES-COMPLEX-ASSEMBLY
pragmaticBIM.ch/des-complex-assembly
Visualize and assess assembly options and temporary construction states with simplified models before they cause conflicts on site.
Starting point
- During complex assemblies, access, fall edges, and available space change as construction progresses.
- Two-dimensional installation drawings alone often reveal spatial conflicts and the effects of different sequences too late.
Goal & benefit
- Compare critical intermediate states and assembly options with limited modelling effort.
- Reach decisions faster and remove discarded options without ongoing maintenance.
Process
- Provide critical assembly phases, temporary components, and areas to remain clear as simplified geometry.
- Visualize the options in the coordination model and assess safety, access, and construction sequence with the responsible designers and contractors.
- Document the selected option and decisions; remove disposable models that will not be pursued.
Deliverable
- Assessed assembly option with understandable intermediate states and documented decisions.
Ways to do it
-
BEXEL Manager BEXEL Consulting editorial listing
openBIM platform for clash detection, IDS checking, quantity takeoff, 4D/5D simulation and construction progress tracking.
Visit vendor · last checked
-
DokaCAD for Revit Doka GmbH editorial listing
Revit plugin for automated 3D formwork planning with cycle planning, formwork drawings and bills of materials.
Visit vendor · last checked
-
Fuzor Kalloc Studios editorial listing
VR and 4D construction sequence simulation with live link to Revit and Archicad.
Visit vendor · last checked
-
Navisworks Autodesk editorial listing
Federated model review with clash detection, 4D simulation and quantity takeoff.
Visit vendor · last checked
-
SYNCHRO 4D Bentley Systems editorial listing
4D construction planning linking schedule and model for construction phases and logistics.
Visit vendor · last checked
Suggest a tool All tools and services
Elements involved
Architecture (6)
More use cases for Schedule & coordination
-
DES-FLOORING
Plan floor build-ups
Model floor build-ups as areas so finish, subfloor, joints, and quantities can be evaluated reliably for execution.
-
DES-MEP-SCHEM
Develop MEP schematics
Develop MEP system and riser schematics and formally approve them before construction.
-
DES-FIRE-MATRIX
Develop the fire cause-and-effect matrix
Formally approve the fire cause-and-effect matrix for detectors, dampers, actuators, and suppression equipment before construction.