Data centre
USE-RZ
pragmaticBIM.ch/use-rz
Operation of IT infrastructure. Reference quantity: IT load (MW).
Boundary conditions
PG-30Availability class
The availability class according to EN 50600 and the IT load determine redundancy of power and cooling, plant areas, and maintenance routes.
Variants
-
VFK-01Class 1
Low availability, without redundancy.
-
VFK-02Class 2
Medium availability, redundant components.
-
VFK-03Class 3
High availability, maintenance without interruption.
-
VFK-04Class 4
Very high availability, fault tolerant.
-
PG-15Refit frequency
How often spaces, equipment, and installations are refitted decides how current the as-built data must be in operation. The more often the building is refitted, the more facility management use cases are preselected.
Scenarios
US-RZ-06Reaching the IT rooms
Staff and hardware reach the IT rooms under control. The access arrangement determines access control, transport loads, and security zones.
Variants
- Stairwell · Adds: Lobby, Stairwell
- Stairwell and elevator · Adds: Lobby, Stairwell, Elevator lobby
- Stairwell, elevator, and service lift · Adds: Lobby, Stairwell, Elevator lobby, Service lift
US-GE-01Reaching the unit (Described under another use)
US-RZ-01Operating servers
IT systems run around the clock. The arrangement of IT rooms determines availability, loads, and expandability.
Variants
- Server room · Adds: Server room
- Server room with communications room · Adds: Communications room, Server room
US-GE-03Disposing of waste (Described under another use)
US-RZ-02Securing power supply
Servers need uninterrupted power. The supply concept determines redundancy, plant area, and fire compartments.
Variants
- Grid connection with transformer · Adds: Transformer room, Electrical room
- With backup generator · Adds: Generator room, Electrical room
US-GE-04Disposing of organic waste (Described under another use)
US-RZ-03Cooling servers
Servers give off heat continuously. The cooling concept determines cooling capacity, waste-heat use, and plant area.
Variants
- Chiller plant · Adds: Chiller room, Server room
- Chiller and HVAC plant · Adds: Chiller room, HVAC plant room
US-RZ-09Using waste heat
Servers give off heat that would otherwise be lost at the heat rejection. Using that waste heat determines the boiler room, the connection, and the building's heat demand.
Variants
- Building heating · Adds: Chiller room, Boiler room
- District heating
US-RZ-04Monitoring operations
Staff monitor the systems and respond to faults. A staffed control room determines response time, workstations, and access control.
Variants
- On-site control room · Adds: Control room
- Remote monitoring
US-RZ-05Delivering hardware
Servers and spare parts are delivered, unpacked, and installed. Delivery determines transport routes, door sizes, and security zones.
Variants
- Dock with supply room · Adds: Loading dock, Supply room
- Supply room · Adds: Supply room
Use cases
-
BES-SEISMIC-MEPTender installation suspensions as a separate trade
Tender suspension of building services early as a separate trade so that design, coordination, and installation are clearly owned by one specialist contractor.
-
DES-MEP-SCHEMDevelop MEP schematics
Develop MEP system and riser schematics and formally approve them before construction.
-
DES-ARCH-MEP-COORDCoordinate architecture and building services
Coordinate MEP routes, equipment, and space requirements with architecture and update both discipline models consistently.
-
QAS-ARCH-STRUCT-COORDCoordinate architecture and structure
Coordinate load-bearing components between the architecture and structural models so that geometric deviations are detected before construction and do not have to be maintained twice.
-
QAS-ELEMENT-PERFCheck component types against performance requirements
Check wall, slab, window, and door component types against the performance requirements that follow from the chosen framework conditions, so every type demonstrably meets what was ordered.
-
QAS-INSTALL-PATHVerify installation access paths
Carry the installation access paths to be kept clear in the model and prove that equipment can be brought in - before large plant or components force alterations and deconstruction.
More uses
-
USE-VE
Passenger transport
Handling of travellers and their waiting time, for example in station halls, terminals and waiting areas. Reference quantity: passengers per peak hour.
-
USE-PK
Parking
Parking of vehicles, for example in multi-storey car parks, garages and parking spaces. Reference quantity: number of parking spaces.
-
USE-ER
Circulation
Gross volume of horizontal and vertical circulation.