Boundary conditions
Boundary conditions are project decisions that must be settled before design starts. Each boundary condition has variants, and each variant activates specific use cases.
Cross-project boundary conditions
-
PG-06Working with existing buildings
This framework condition determines which existing-condition information is procured: spatial reference and terrain only; those plus the building mass and structural shell; or structural shell, fit-out, and MEP.
-
PG-02Use & fit-out standard
This framework condition determines which uses the building accommodates and which fit-out standard applies to which spaces. It is the basis for designing spaces to suit their use and for checking the agreed requirements traceably.
-
PG-39Accessibility
This framework condition sets how far the building is accessible beyond the legal minimum under SIA 500: adaptable or wheelchair-accessible throughout. It drives doors, spaces, and circulation.
-
PG-37Indoor climate
This framework condition sets whether spaces are only heated, also cooled, or controlled for temperature and humidity. It drives the room types with their target values, the building services, and with them plant areas, shafts, and storey heights.
-
PG-34Energy standard
This framework condition sets whether the building meets the legal minimum or reaches a standard such as Minergie, Minergie-P, or Minergie-A. The standard drives exterior walls, roofs, windows, and the airtightness of the envelope.
-
PG-35Greenhouse gas target
This framework condition sets the limit for grey energy and greenhouse gas emissions from construction, separate from operational energy. The target drives material choice for every component type.
-
PG-38Sound insulation
This framework condition sets whether the minimum requirements under SIA 181 apply, or increased or special requirements. It drives partitions, slabs, and doors between dwellings or units.
-
PG-33Earthquake
This framework condition sets the structure class under SIA 261 and, in a renovation, how far the existing structure is upgraded under SIA 269/8. It matters mainly when the client raises it or decides the degree of upgrading.
-
PG-11Construction method & prefabrication
This framework condition determines whether the construction method remains open, is designed conventionally, or targets a high degree of prefabrication in timber, steel, or concrete. This choice determines when contractors must be involved, interfaces resolved, and shop, production, and assembly information provided.
-
PG-12Security / critical infrastructure
This framework condition determines how strictly information and building security are handled for critical infrastructure: which CDEs are allowed and whether security-critical areas and building security measures must be managed and checked on a model basis.
-
PG-08Procurement strategy
This framework condition determines the procurement route: engaging designers directly, a competition, design-build, or IPD. Each route places different demands on foundations, models, and bids.
-
PG-41Construction during operation
This framework condition sets whether the building stays in use during construction. It drives phasing, temporary measures, decant space, and site logistics with separate routes for operation and construction.
-
PG-04Facility management
This framework condition determines who operates the building and with which systems: space and equipment lists, managed objects in the 3D model, or a COBie import. That decision determines which information must be handed over at the end of the project.
-
PG-15Refit frequency
How often spaces, equipment, and installations are refitted decides how current the as-built data must be in operation. The more often the building is refitted, the more facility management use cases are preselected.
-
PG-18Fit-out state at handover
The fit-out state at handover sets where the base build ends and the tenant fit-out begins. Cost interfaces and building services per tenant unit depend on it.
Boundary conditions of a use
USE-WHHousing
USE-WRWork
USE-BIEducation
USE-VKRetail
USE-GAFood service
USE-BHAccommodation
USE-VSAssembly and culture
USE-HEHealthcare
USE-PRProduction
USE-LOWarehousing and logistics
USE-SPSport
USE-LALaboratory and research
USE-RZData centre
USE-VEPassenger transport
USE-PKParking
Other boundary conditions
PG-40Flexibility / service life
This framework condition sets the design service life and how far structure, fit-out, and building services are separated. It drives storey heights, the structural grid, and installation zones.
Variants
-
FLX-01Standard service life
Service life based on usual values, without special requirements for separating structure, fit-out, and building services.
-
FLX-02System separation
Structure, fit-out, and building services are separated so each can be replaced over its own service life. Installation zones are set early and kept clear.
-
FLX-03High flexibility of use
The structural grid, storey heights, and installation zones allow other uses without work on the structure. Installation routes are also checked for later uses.
PG-36Certification
This framework condition sets whether the building receives a label such as Minergie-ECO, SNBS Building Construction, or DGNB/SGNI. The label sets minimum levels for the energy standard, the greenhouse gas target, and sound insulation.
These levels can be raised but not lowered.
Variants
-
ZER-01None
The building is not certified. Energy standard, greenhouse gas target, and sound insulation are set one by one.
-
ZER-02Minergie-ECO
Minergie with additional requirements for health and building ecology. Sets at least Minergie, the SIA 390/1 guide value, and increased sound insulation.
-
ZER-03SNBS Building Construction
Swiss Sustainable Building Standard with criteria for society, economy, and environment. Sets at least the SIA 390/1 guide value.
-
ZER-04DGNB/SGNI
International sustainability label in the Swiss version of the SGNI. Sets at least the SIA 390/1 guide value.