Use case Construction Design certainty
Capture and manage defects with room QR codes
CON-DEFECT-MGMT
pragmaticBIM.ch/con-defect-mgmt
Capture defects directly at the affected location using a room QR code so that each report is assigned unambiguously without searching a drawing or navigating through an app.
Starting point
- Capturing defects from drawings requires users to find and select the correct room first; on site, this leads to misassigned or incomplete reports.
- Photographs and notes stored outside the defect-management system are difficult to associate later with a room, responsible person, and status.
Goal & benefit
- Start a defect report with the smartphone camera at the room QR code and prefill the room reference automatically.
- Maintain the report, photograph, responsibility, due date, and status consistently in the agreed defect-management system.
Process
- Define the defect process, roles, mandatory information, deadlines, and statuses through acceptance, then provide the technical room number (Name) and room use (LongName) for each interior space.
- Print an A4 label for each room with room number, room use, and QR code; link the QR code directly to the room in the defect-management system or to a room-specific prefilled form, then attach the label to the door or window using tape that is suitable for the surface and can be removed without residue.
- Scan the QR code on site, capture the defect and photograph, synchronize the report with the defect-management system when a form is used, and maintain assignment, rectification, verification, and closure.
Deliverable
- Legible and verified A4 label for each room with room number, room use, and a working QR link.
- Reports synchronized with the defect-management system, assigned unambiguously to the room, and including photograph, responsibility, due date, and status.
- Traceable verification and closure record for rectified defects.
Ways to do it
-
Capmo Capmo editorial listing
Construction project management with defects, tasks, site diary and plans in one app.
Visit vendor · last checked
-
Dalux Field Dalux editorial listing
Site app for defects, checklists, drawings and models on site, including 360° captures.
Visit vendor · last checked
-
docu tools docu tools GmbH editorial listing
Locate defects on the digital plan, assign them and output them as a report.
Visit vendor · last checked
-
Fieldwire Hilti editorial listing
Site app for tasks, defects, checklists and plans, with a template for fire safety documentation.
Visit vendor · last checked
-
PlanRadar PlanRadar editorial listing
Cloud app for defects, tasks and site documentation on plans and BIM models.
Visit vendor · last checked
-
Sablono Sablono GmbH editorial listing
Execution and takt tracking platform with room- and element-based workflow templates, QA checklists and 3D link.
Visit vendor · last checked
-
smino smino AG editorial listing
Swiss construction project platform with CDE project space, BIM viewer, model checking, checklists and defect tracking.
Visit vendor · last checked
Suggest a tool All tools and services
Elements involved
More use cases for Design certainty
-
CON-PROGRESS-DOC
Document construction progress with 360° captures
Record construction progress on a route repeated every week and compare it with the schedule.
-
BES-EXISTING-SITE
Procure the spatial reference and terrain
Procure the spatial reference and terrain as a binding design basis so that every discipline model uses the same coordinates, elevations, and parcel information.
-
BES-DESIGNER-PROCUREMENT
Procure a design team with professional and digital expertise
Procure planning services against the required capabilities, results, and data deliveries instead of ordering BIM wholesale as an additional working method.