Boundary condition Boundary conditions
Use & fit-out standard
PG-02
pragmaticBIM.ch/pg-02
This framework condition determines which uses the building accommodates and which fit-out standard applies to which spaces. It is the basis for designing spaces to suit their use and for checking the agreed requirements traceably.
Variants
-
FIT-01Standard
Operational and functional foundations from test planning, a structured room programme, and drawing derivation from the 3D model.
Activates: Formulate the room programme for designer procurement and competition, Clarify operational and functional foundations through test planning, Derive plans from the model
-
FIT-02Elevated
Extended room-level planning - schematic floor plans from the space model, doors, facade, reflected ceiling plans, coordinated lighting concept and fixture design, underground services, underfloor heating, coordinated sanitary fixtures and service linings, user approval of outlet types, spatial visualization of decisions and their impacts, basis for furniture tendering, furnishability verification, and user coordination using rough sketches for special-purpose rooms.
Activates: Formulate the room programme for designer procurement and competition, Clarify operational and functional foundations through test planning, Derive plans from the model, Plan the layout with schematic floor plans, Derive the basis for door planning, Maintain the facade in the model, Coordinate suspended ceilings, Coordinate lighting concept and fixture design, Plan drywall reinforcement, Coordinate drainage and wastewater early, Coordinate sanitary fixtures, Provide the basis for underfloor heating, Plan the furnishing and procure the furniture, Verify furnishability, Align special rooms with the users, Obtain user approval for outlet types, Visualize decisions and their impacts
-
FIT-03Premium
Visualizations for usage agreements from the model.
Activates: Formulate the room programme for designer procurement and competition, Clarify operational and functional foundations through test planning, Derive plans from the model, Plan the layout with schematic floor plans, Derive the basis for door planning, Maintain the facade in the model, Coordinate suspended ceilings, Coordinate lighting concept and fixture design, Plan drywall reinforcement, Coordinate drainage and wastewater early, Coordinate sanitary fixtures, Provide the basis for underfloor heating, Plan the furnishing and procure the furniture, Verify furnishability, Align special rooms with the users, Obtain user approval for outlet types, Visualize decisions and their impacts, Create visualizations from the model, Visualize the structural usage agreement room by room, Visualize the MEP usage agreement room by room, Compare usage-agreement requirements with actual values
Activated use cases
BES · Ordering
-
BES-ROOM-PROGRAMFormulate the room programme for designer procurement and competition
Define rooms and their requirements in a structured form as part of the order so that every designer works from the same stable data basis from day one.
-
BES-FUNCTIONAL-BRIEFClarify operational and functional foundations through test planning
Test operations, functions, and areas spatially before procurement without predetermining the later building solution.
-
DES-FURNITUREPlan the furnishing and procure the furniture
Represent furniture in the model so that options, furniture schedules, and spatial requirements can be coordinated early and reused reliably for procurement.
DES · Design
-
DES-DRAWINGSDerive plans from the model
Derive drawings from the 3D model and use them to check that geometry and components are complete and consistent with the design.
-
DES-LAYOUTPlan the layout with schematic floor plans
Model the layout with spaces only and derive schematic floor plans - change walls with few clicks.
-
DES-DOORDerive the basis for door planning
Derive the door-design basis from the model so that door schedules and discipline coordination do not rely on scattered individual details.
-
DES-FACADEMaintain the facade in the model
Maintain the building envelope in the model - simple build-ups as a multi-layer component, complex build-ups with individually modelled facade layers.
-
DES-CEILING-MIRRORCoordinate suspended ceilings
Represent suspended ceilings in the model from early room assignment through construction-ready layer modelling so that fit-out and MEP can be coordinated reliably.
-
DES-LIGHTING-COORDCoordinate lighting concept and fixture design
Deliberately bring together the lighting concept, architecture, and technical fixture design so the approved design intent is implemented correctly in the electrical or lighting designer's model.
-
DES-DRYWALL-REINFPlan drywall reinforcement
Plan reinforcement for wall-mounted fixtures explicitly so it can be tendered and installed before drywall partitions are closed.
-
DES-BASIC-PIPINGCoordinate drainage and wastewater early
Coordinate drainage and wastewater early in the model - before clashes in risers and below the base slab trigger costly design changes.
-
DES-SANITARY-FIXTURE-COORDCoordinate sanitary fixtures
Coordinate sanitary fixtures jointly, from first placement through to detailed plumbing design, so that connections and service linings match the approved locations and dimensions.
-
DES-UNDERFLOOR-HEATINGProvide the basis for underfloor heating
Bring together space, floor-build-up, and heating-load information early for underfloor-heating design.
-
DES-MODEL-VISCreate visualizations from the model
Create visualizations manually or with generative AI from a fit-for-purpose geometric basis without overloading the design and construction models with purely visual detail.
-
DES-USAGE-AGREEMENTVisualize the structural usage agreement room by room
Record usage and structural requirements from the usage agreement per space in the model and derive readable visualizations from them.
-
DES-MEP-USAGE-AGREEMENTVisualize the MEP usage agreement room by room
Record agreed room conditions and usage assumptions in the model and present them in readable thematic plans.
QAS · Quality assurance
-
QAS-FURNISHABILITYVerify furnishability
Prove furnishability of interior rooms so clients can decide and approve without being able to read plans.
-
QAS-SPECIAL-ROOM-USERAlign special rooms with the users
Sketch special rooms roughly in the model and coordinate them with future users before accurate modelling begins in the overall model. The aim is to obtain the decisions that give planning certainty.
-
QAS-OUTLET-USERObtain user approval for outlet types
Coordinate recurring outlet types and their typical locations with users so electrical design is based on clear decisions without requiring approval for every individual outlet.
-
QAS-DECISION-VISVisualize decisions and their impacts
Visualizations help design teams make decisions and their impacts spatially understandable and reach binding decisions in good time.
-
QAS-USAGE-AGREEMENTCompare usage-agreement requirements with actual values
Compare agreed requirements and verified design values for each space so that structural and MEP deviations become visible before approval.
More boundary conditions
-
PG-39
Accessibility
This framework condition sets how far the building is accessible beyond the legal minimum under SIA 500: adaptable or wheelchair-accessible throughout. It drives doors, spaces, and circulation.
-
PG-37
Indoor climate
This framework condition sets whether spaces are only heated, also cooled, or controlled for temperature and humidity. It drives the room types with their target values, the building services, and with them plant areas, shafts, and storey heights.
-
PG-34
Energy standard
This framework condition sets whether the building meets the legal minimum or reaches a standard such as Minergie, Minergie-P, or Minergie-A. The standard drives exterior walls, roofs, windows, and the airtightness of the envelope.