Rule Fire protection directive 19-15 Sprinkler systems

Specialist firm, documentation, switch-off, project, acceptance, inspection and general overhaul

VKF-19-15-013 pragmaticBIM.ch/vkf-19-15-013

Sprinkler systems are planned, installed and maintained by VKF-recognised specialist firms and adapted on changes, extensions or changes of use. The control room holds the system documentation and a logbook, the fire-brigade access holds orientation plans.

Description

Systems are in principle not switched off; longer interruptions must be reported. Projects, acceptance, periodic inspection and general overhaul follow the directive; owners or operators keep the system ready for operation.

Source

VKF-Brandschutzrichtlinie 19-15 Sprinkleranlagen (2015) (p. 9)