Use case Ordering Schedule & coordination
Tender the elevator installation early
BES-ELEVATOR-EARLY
pragmaticBIM.ch/bes-elevator-early
The client tenders the elevator installation early, once the building permit has been granted, and so obtains binding shaft and installation parameters before floor plans, structure, and foundations are developed further, avoiding late redesign.
Starting point
- Elevator installations are often tendered too late. Different shaft, pit, and headroom dimensions then cause errors and redesign of floor plans, the structure, and foundations.
Goal & benefit
- Obtain installation-specific dimensions and design parameters in good time and avoid late redesign of the shaft, adjacent spaces, and foundations.
- Limit the risk of an early award through a right of withdrawal and remuneration for design work in case the project does not go ahead.
Process
- Tender and award the elevator installation once the building permit has been granted, including a contractual clause covering the right of withdrawal and remuneration for design work.
- Request shaft, pit, headroom, opening, load, and other design parameters from the elevator contractor and have the architecture and structural design teams check them against the design.
- Approve the agreed parameters and require their incorporation into the architecture and structural models.
Deliverable
- Coordinated architecture and structural models with correct shaft geometry and the design parameters of the intended elevator installation incorporated.
Ways to do it
-
DigiPara Liftdesigner DigiPara GmbH (Systabuild) editorial listing
Bring shaft dimensions from Otis, Schindler and TK Elevator series into the model.
Visit vendor · last checked
-
KONE Planungstools und BIM-Modelle KONE editorial listing
Online planning aids and BIM objects for KONE elevators for shaft sizing.
Visit vendor · last checked
-
Schindler Planungstools und BIM-Daten Schindler editorial listing
Online planning aids and BIM data for Schindler lifts for shaft design.
Visit vendor · last checked
Suggest a tool All tools and services
Elements involved
Architecture (6)
More use cases for Schedule & coordination
-
BES-TIMBER-CONTRACTOR
Procure the timber contractor early
The client procures a timber contractor after the study or preliminary design and involves it in the design, so that the construction is designed only once and to suit the contractor's production and assembly system.
-
BES-PLAN-BOX
Procure plan and model stations
Make current drawings, models, and project data directly usable on every active storey, at the place of work.
-
BES-SITE-WLAN
Procure temporary site Wi-Fi
Procure temporary Wi-Fi amplifiers so that tablets reach the project platform in every work area, including basements without mobile reception.