Use case Quality assurance Schedule & coordination

Verify installation access paths

QAS-INSTALL-PATH pragmaticBIM.ch/qas-install-path

Carry the installation access paths to be kept clear in the model and prove that equipment can be brought in - before large plant or components force alterations and deconstruction.

Starting point

  • Without reserved paths, clashes with building or MEP follow - and costly rebuilds, special transports, or equipment that cannot be delivered.
  • This can lead to costly rebuilds and restrictions in operation.

Goal & benefit

  • Maintain clear installation access paths as proxy volumes in the model.
  • Check clashes against building and MEP in the federated model and document the verification.

Process

  1. Model clear installation access paths as proxy volumes.
  2. Check access paths for clashes against building and building services in the federated model.
  3. Document the clash verification and take measures if access is restricted.

Deliverable

  • Coordination model with the required location and size information for clear installation access paths.

Ways to do it

  • Fuzor Kalloc Studios editorial listing

    VR and 4D construction sequence simulation with live link to Revit and Archicad.

    Visit vendor · last checked

  • Navisworks Autodesk editorial listing

    Federated model review with clash detection, 4D simulation and quantity takeoff.

    Visit vendor · last checked

  • Solibri Office Solibri (Nemetschek) editorial listing

    Rule-based checking of IFC models for clashes, model quality and requirements.

    Visit vendor · last checked