The aim is to make strategic and design decisions early, comparably, and traceably. Structured use and massing foundations, option comparisons, visualizations, and documented approvals show the consequences of a decision while the project can still be changed.
Levels
ENT-01Low
Structure use and functional assumptions, commission a binding room programme, and compare urban massing options using key figures.
ENT-02Medium
Reconcile layout and programme options, prepare user and competition decisions, and document phase approvals with open points and responsibilities.
ENT-03High
Support options with reference projects, simulations, and visualizations, and present urban impact, usage agreements, and design interfaces as decision-making foundations.
Contributing use cases
BES · Ordering
-
BES-FUNCTIONAL-BRIEFClarify operational and functional foundations through test planning
Test operations, functions, and areas spatially before procurement without predetermining the later building solution.
-
BES-ROOM-PROGRAMFormulate the room programme for designer procurement and competition
Define rooms and their requirements in a structured form as part of the order so that every designer works from the same stable data basis from day one.
-
BES-ABSTRACTBIM-COMPEvaluate competition entries with a room model
Evaluate competition entries comparably with minimal modelling effort and focus detailed development on one aspect that is critical to the brief.
DES · Design
-
DES-URBAN-MASSCreate the urban design mass study
Model and evaluate gross volumes by storey so that urban design options and metrics can be compared directly.
-
DES-LAYOUTPlan the layout with schematic floor plans
Model the layout with spaces only and derive schematic floor plans - change walls with few clicks.
-
DES-MODEL-VISCreate visualizations from the model
Create visualizations manually or with generative AI from a fit-for-purpose geometric basis without overloading the design and construction models with purely visual detail.
-
DES-USAGE-AGREEMENTVisualize the structural usage agreement room by room
Record usage and structural requirements from the usage agreement per space in the model and derive readable visualizations from them.
-
DES-MEP-USAGE-AGREEMENTVisualize the MEP usage agreement room by room
Record agreed room conditions and usage assumptions in the model and present them in readable thematic plans.
-
DES-PLANNING-INTERFACEVisualize design interfaces
Carry design responsibility per component in the model and colour it - forgotten parts at design interfaces become visible.
-
DES-ABSTRACTBIM-BPSDerive the basis for heating demand verification to SIA 380/1 from the model
Derive the basis for heating demand verification to SIA 380/1 from the architecture model without manually remodelling the thermal envelope.
QAS · Quality assurance
-
QAS-DESIGN-REVIEWCarry out the design review at the end of the phase
Design review at the end of each project phase - check planning quality and maturity, record open points, and document release for the next phase.
-
QAS-ROOM-PROGRAMReconcile the room programme with the model
Continuously reconcile the ordered room programme with the model - so it is always clear whether the ordered rooms are still fulfilled.
-
QAS-SPECIAL-ROOM-USERAlign special rooms with the users
Sketch special rooms roughly in the model and coordinate them with future users before accurate modelling begins in the overall model. The aim is to obtain the decisions that give planning certainty.
-
QAS-BENCHMARKBenchmark a project against comparable building tasks
Compare a project or its variants with comparable building tasks by indicators, so that deviations from the usual become visible.
-
QAS-URBAN-ARAssess the urban design on site with augmented reality
Assess the volume model and the planned trees on site with AR glasses, so urban design decisions are not taken on a figure-ground plan that omits the third dimension and the vegetation volume.
-
QAS-DECISION-VISVisualize decisions and their impacts
Visualizations help design teams make decisions and their impacts spatially understandable and reach binding decisions in good time.
-
QAS-USAGE-AGREEMENTCompare usage-agreement requirements with actual values
Compare agreed requirements and verified design values for each space so that structural and MEP deviations become visible before approval.
More project goals
-
PG-09
Permit certainty
The aim is that the building permit application and official evidence pass without surprises. Requirements for parcels, traffic, parking, accessibility, fire protection, and existing trees are made visible in the model early and checked continuously, as is the evidence for funding.
-
PG-10
Design certainty
The aim is a design that meets the client's needs, is internally consistent, and is ready for construction. Design reviews, evidence of fire, acoustic, and thermal protection, fall protection, and checked details make quality repeatably verifiable across all phases.
-
PG-03
Verifiable sustainability
The aim is to check energy, material, and life-cycle targets directly against the current design status. Building simulation and life-cycle assessment need the same foundations as cost planning and design.