Use case Design Schedule & coordination
Plan floor build-ups
DES-FLOORING
pragmaticBIM.ch/des-flooring
Model floor build-ups as areas so finish, subfloor, joints, and quantities can be evaluated reliably for execution.
Starting point
- Where the floor covering changes or the subfloors differ, the space cannot carry that information. Both are often planned ad hoc on site and are therefore error-prone.
- Joint planning for subfloors is often forgotten and then has to be solved ad hoc on site. This is particularly important with underfloor heating.
Goal & benefit
- Model floor build-up by type and attribute it with Finish and SubfloorType.
- Use net areas and build-up types directly from the model for execution and quantity take-off.
Process
- Provide floor build-up as a modelled layer by build-up type.
- Capture Finish (floor covering type) and SubfloorType (subfloor); model joints where needed.
- Use the model for execution, filtering by build-up type, and quantity take-off.
Deliverable
- Architecture model with area-based floor build-ups and complete information for execution and quantity take-off.
Ways to do it
-
Archicad Graphisoft (Nemetschek) editorial listing
BIM authoring tool for architecture with drawings, schedules and IFC output from the model.
Visit vendor · last checked
-
Revit Autodesk editorial listing
BIM authoring tool for architecture, structure and building services with drawings and quantities from the model.
Visit vendor · last checked
Suggest a tool All tools and services
Elements involved
Architecture (6)
More use cases for Schedule & coordination
-
DES-MEP-SCHEM
Develop MEP schematics
Develop MEP system and riser schematics and formally approve them before construction.
-
DES-FIRE-MATRIX
Develop the fire cause-and-effect matrix
Formally approve the fire cause-and-effect matrix for detectors, dampers, actuators, and suppression equipment before construction.
-
DES-EMBED-REINF
Coordinate embeds and architectural components with reinforcement
Coordinate embeds and cast-in architectural components with reinforcement before concrete placement and maintain them as binding objects in the formwork and reinforcement model.