Cost estimate

KVA pragmaticBIM.ch/kva

The cost estimate is based on the technical design status and element-based quantities. The cost accuracy of ± 25 % indicates the confidence in the underlying assumptions, not an allowable cost deviation; contingencies and escalation must be shown separately.

Description

Building metrics serve as a plausibility check on the total cost, not as the sole basis for calculation.

Contents

  • Element-based cost structure
  • Reference to the design status
  • Element-based quantities and unit costs
  • Underlying assumptions and their level of confidence
  • Separately stated contingencies and escalation
  • Building metrics for a plausibility check on the total cost