Boundary condition Boundary conditions
Refit frequency
PG-15
pragmaticBIM.ch/pg-15
How often spaces, equipment, and installations are refitted decides how current the as-built data must be in operation. The more often the building is refitted, the more facility management use cases are preselected.
Variants
-
UMB-01Rarely
Layout and installations stay largely the same for decades. Lists are enough for operation.
Activates: Hand over minimal operational data as lists, Maintain signage room numbers, Manage firestops in operation
-
UMB-02Periodically
Major refits every few years. The model is updated with each refit.
Activates: Hand over minimal operational data as lists, Maintain signage room numbers, Manage firestops in operation, Hand over managed objects in the 3D model, Maintain IFC models during alterations, Hand over native models for long-term use
-
UMB-03Continuously
Spaces, equipment, and installations change continuously. Model and point cloud keep the as-built state current.
Activates: Hand over minimal operational data as lists, Maintain signage room numbers, Manage firestops in operation, Hand over managed objects in the 3D model, Maintain IFC models during alterations, Hand over native models for long-term use, FM with a classified point cloud
Activated use cases
HOV · Handover
-
HOV-FM-MINHand over minimal operational data as lists
Deliver space, door, and window lists plus FM-relevant building services as structured data at handover to the operator - without full 3D plant modelling.
-
HOV-FM-3DHand over managed objects in the 3D model
Agree with the operator which objects they actually manage - and hand over only those with the agreed master data and documents in the 3D model.
-
HOV-NATIVEHand over native models for long-term use
Package and check native discipline models so that they can still be opened, exported, and, where required, maintained years later.
OPR · Operation
-
OPR-SIGNAGE-ROOMMaintain signage room numbers
Maintain and update signage room numbers in operation - separate from the technical planning room number.
-
OPR-FIRESTOP-MAINTManage firestops in operation
Permanently identify, inspect, and update firestops during alterations so that the required fire resistance is maintained in operation.
-
OPR-FM-ARCHMaintain IFC models during alterations
Extract an alteration area from the approved overall IFC model in a controlled manner and reinsert it after completion - without gaps, duplicates, or conflicting model revisions.
-
OPR-FM-PCFM with a classified point cloud
Capture the completed asset as a classified point cloud and use it directly for FM processes - without maintaining a complete existing-condition model.
More boundary conditions
-
PG-06
Working with existing buildings
This framework condition determines which existing-condition information is procured: spatial reference and terrain only; those plus the building mass and structural shell; or structural shell, fit-out, and MEP.
-
PG-02
Use & fit-out standard
This framework condition determines which uses the building accommodates and which fit-out standard applies to which spaces. It is the basis for designing spaces to suit their use and for checking the agreed requirements traceably.
-
PG-18
Fit-out state at handover
The fit-out state at handover sets where the base build ends and the tenant fit-out begins. Cost interfaces and building services per tenant unit depend on it.