Rule Fire protection directive 21-15 Smoke and heat exhaust systems
Concepts: fire-brigade fans down to the 1st basement, natural systems not below ground, extraction under the ceiling
VKF-21-15-016
pragmaticBIM.ch/vkf-21-15-016
Smoke clearance with fire-brigade fans assumes response forces on site within 15 minutes of the alarm, needs inlet openings for setting up the fans in addition to the exhaust openings, and below ground is permitted only down to the 1st basement unless supply air comes from outdoors on the same level.
Description
Natural systems work regardless of weather and must not be built below ground, except with direct supply air from outdoors (hillside). In mechanical systems the extraction points sit under the ceiling and are matched to the inflow openings. Not yet checkable: the model holds no smoke and heat exhaust system and no assignment of one to fire compartments.
Source
VKF-Brandschutzrichtlinie 21-15 Rauch- und Wärmeabzugsanlagen (2015) (p. 11)
More rules for Fire protection directive 21-15 Smoke and heat exhaust systems
-
VKF-21-15-001
Smoke and heat exhaust by use, position and fire-compartment area
Depending on occupancy, number of storeys, construction type, position and use, fire compartments must be equipped with an adequately sized smoke and heat exhaust system.
-
VKF-21-15-002
Systems without performance proof: system type and sizing by use
For systems without performance proof the directive sets, per use, position and area, which system type is permitted: smoke clearance with fire-brigade fans, mechanical or natural systems. Sizing follows air-change rates by room height or supply and exhaust areas as a percentage of the compartment area.
-
VKF-21-15-017
Project review, acceptance, periodic inspection and maintenance
On request of the fire protection authority, projects are submitted for approval in good time. Systems with performance proof are accepted after an installation certificate exists, as are extensions and substantial changes.