Rule Fire protection directive 21-15 Smoke and heat exhaust systems

Concepts: fire-brigade fans down to the 1st basement, natural systems not below ground, extraction under the ceiling

VKF-21-15-016 pragmaticBIM.ch/vkf-21-15-016

Smoke clearance with fire-brigade fans assumes response forces on site within 15 minutes of the alarm, needs inlet openings for setting up the fans in addition to the exhaust openings, and below ground is permitted only down to the 1st basement unless supply air comes from outdoors on the same level.

Description

Natural systems work regardless of weather and must not be built below ground, except with direct supply air from outdoors (hillside). In mechanical systems the extraction points sit under the ceiling and are matched to the inflow openings. Not yet checkable: the model holds no smoke and heat exhaust system and no assignment of one to fire compartments.

Source

VKF-Brandschutzrichtlinie 21-15 Rauch- und Wärmeabzugsanlagen (2015) (p. 11)

More rules for Fire protection directive 21-15 Smoke and heat exhaust systems

Contact

abstract ag

Imprint · Picassoplatz 4, 4052 Basel