Boundary condition Boundary conditions
Facility management
PG-04
pragmaticBIM.ch/pg-04
This framework condition determines who operates the building and with which systems: space and equipment lists, managed objects in the 3D model, or a COBie import. That decision determines which information must be handed over at the end of the project.
Explanation
This also covers what was installed. Claims often arise years after handover, after water damage, a fire, or a product recall. Whoever can then show which product is installed where negotiates on facts rather than assumptions.
Variants
-
OPS-01Lists
Hand over and maintain space, equipment, and firestop schedules and signage room numbers for operations.
Activates: Hand over minimal operational data as lists, Maintain signage room numbers, Manage firestops in operation
-
OPS-023D handover
Hand over managed objects in the 3D model, based either on the architectural model or a classified point cloud, including native models.
Activates: Hand over managed objects in the 3D model, Maintain IFC models during alterations, FM with a classified point cloud, Hand over native models for long-term use, Link the product passport via GTIN, Link the product passport via serial number
-
OPS-03COBie
Hand over operations data in COBie format for import.
Activates: Hand over operational data in COBie format, Link the product passport via GTIN, Link the product passport via serial number
-
OPS-04Operational optimization
Support building operation during the first years with actual use and measurement data, evaluate deviations from the design targets, and demonstrate the effect of optimization measures.
Activates: Optimize building operation during the first years
Activated use cases
HOV · Handover
-
HOV-FM-MINHand over minimal operational data as lists
Deliver space, door, and window lists plus FM-relevant building services as structured data at handover to the operator - without full 3D plant modelling.
-
HOV-FM-3DHand over managed objects in the 3D model
Agree with the operator which objects they actually manage - and hand over only those with the agreed master data and documents in the 3D model.
-
HOV-NATIVEHand over native models for long-term use
Package and check native discipline models so that they can still be opened, exported, and, where required, maintained years later.
-
HOV-PRODUCT-PASS-GTINLink the product passport via GTIN
Link product-passport information unambiguously to installed product types by GTIN without duplicating the complete manufacturer data in the model.
-
HOV-PRODUCT-PASS-SERIALLink the product passport via serial number
Assign product-passport information to an individual installed product by GTIN (Global Trade Item Number) and serial number, keeping its individual life cycle traceable.
-
HOV-COBIEHand over operational data in COBie format
Hand over operationally relevant master data so that the operator can check it in the target system and import it using the open COBie format.
OPR · Operation
-
OPR-SIGNAGE-ROOMMaintain signage room numbers
Maintain and update signage room numbers in operation - separate from the technical planning room number.
-
OPR-FIRESTOP-MAINTManage firestops in operation
Permanently identify, inspect, and update firestops during alterations so that the required fire resistance is maintained in operation.
-
OPR-FM-ARCHMaintain IFC models during alterations
Extract an alteration area from the approved overall IFC model in a controlled manner and reinsert it after completion - without gaps, duplicates, or conflicting model revisions.
-
OPR-FM-PCFM with a classified point cloud
Capture the completed asset as a classified point cloud and use it directly for FM processes - without maintaining a complete existing-condition model.
-
OPR-BUILDING-PERFORMANCEOptimize building operation during the first years
Support building operation during the first years with actual use and measurement data so deviations from the operating concept are identified and effective optimizations are demonstrated.
More boundary conditions
-
PG-06
Working with existing buildings
This framework condition determines which existing-condition information is procured: spatial reference and terrain only; those plus the building mass and structural shell; or structural shell, fit-out, and MEP.
-
PG-15
Refit frequency
How often spaces, equipment, and installations are refitted decides how current the as-built data must be in operation. The more often the building is refitted, the more facility management use cases are preselected.
-
PG-18
Fit-out state at handover
The fit-out state at handover sets where the base build ends and the tenant fit-out begins. Cost interfaces and building services per tenant unit depend on it.