Enables separate design and quantity take-off of the facade surface and improves coordination with connections and openings.
Description
- Exterior cladding layer with defined quality according to the component catalogue.
- Separate layer, distinct from the load-bearing exterior wall.
Modelling guidelines
- Model when multi-layer components are not supported or higher complexity requires a separate layer.
- Model as a separate layer; split at component and storey boundaries.
- Capture cladding quality via Reference.
- Use and export the appropriate material from the authoring system.
IFC entity
- IFC4
- IfcCovering
- IFC4.3
- IfcCovering
- IFC2x3
- IfcCovering
- Applicability rule
- entity_ifc4=IfcCovering AND PredefinedType=CLADDING AND IsExternal=TRUE
Attributes
| Attribute | Definition | Used in |
|---|---|---|
| PredefinedType |
Marks the facade cladding. Allowed values
|
|
| Reference Pset_CoveringCommon |
Cladding quality of the facade according to the component catalogue. Allowed values
|
|
| IsExternal Pset_CoveringCommon |
Marks an exterior facade cladding. Allowed values
|
|
| Status Pset_CoveringCommon |
Component status for coordinating work in existing buildings. Allowed values
|
|
| ElementStatus ePset_ElementStatus |
Component status for coordinating work in existing buildings. Allowed values
Note
|
|
| CostInterface ePset_Cost |
Cost interface: base building or tenant fit-out. Allowed values
|
|
| FundingApplication ePset_Cost |
Number of the funding application, so quantities and costs can be filtered by application. Separate several numbers with commas, e.g. |
|
| AwardInterface ePset_Cost |
Procurement package of the component, so interfaces between contractor packages become visible. Allowed values
|
+1 more |
| PlanningInterface ePset_Cost |
Planning interface of the component as a three-digit BKP code, so responsibilities between design disciplines become visible. Allowed values
|
|
| BelowTerrain ePset_Cost |
Marks whether the component sits below ground level. Allowed values
|
|
| eBKP ePset_Cost |
eBKP-H classification according to SN 506 511 - derivable from IsExternal, LoadBearing, and BelowTerrain. Allowed values
|
|
| ProductClass ePset_Cost |
Product class as the shared key for costs, tendering, and life-cycle assessment. It is derived where material and component properties determine it unambiguously, otherwise set. In early phases, a reasoned assumption is acceptable. Allowed values
|
|
| UnitPrice ePset_Cost · CHF/m² |
Project- or office-specific unit price per unit of the reference quantity, used to check component costs for plausibility. |
|
| ReferenceQuantity ePset_Cost |
|
|
| Connection ePset_Circularity |
Connection type for detachability (Madaster). Allowed values
|
|
| Accessibility ePset_Circularity |
Accessibility of the connection without destroying the component or surroundings (Madaster). Allowed values
|
|
| Reuse ePset_Circularity |
Share of already reused or recycled material in the component (0.01 - 1.00, e.g. 0.80 = 80 %). |
|
| MaterialOrProductId ePset_Circularity |
Unique ID of the material or product in the linked database (e.g. Madaster, baubook). |
|
| WasteCodes ePset_Circularity |
Waste codes for deconstruction and disposal. Code to VeVA (CH) or EWC/AVV (EU); format as used by Madaster, e.g. |
|
| GlobalTradeItemNumber Pset_ManufacturerTypeInformation |
GTIN (Global Trade Item Number) of the product type; 8, 12, 13, or 14 digits depending on the GS1 structure. |
+1 more |
| HazardType ePset_HazardousMaterial |
Type of hazardous material found by survey on the affected existing component. Allowed values
|
|
| RemovalCategory ePset_HazardousMaterial |
Remediation urgency and action required, as determined by the survey. Allowed values
|
|
| SerialNumber Pset_ManufacturerOccurrence |
Serial number the manufacturer assigns to an individual product; with the GTIN it identifies the product passport for that specific item. |
|
| NetArea Qto_CoveringBaseQuantities · m² |
Net area of the modelled facade cladding. |
|
| ReactionToFire ePset_ReactionToFire |
Reaction-to-fire group (RF) of the component or its surface layer under the VKF fire protection regulations. Basis for checking VKF 14-15 on claddings, coverings and ceilings. Allowed values
Note
|
|
| ReactionToFireRequired ePset_CoveringRequirement |
Required reaction-to-fire group (the worst group still permitted) of the component under VKF 14-15. Target value compared with ReactionToFire. Allowed values
Note
|
Related elements
-
ARC-ROOF-DRAIN
Tapered insulation / roof build-up
Shows early how much build-up height the roof and balcony fall requires. The building height is then fixed for the permit, and pipes in the foundation can be connected to the outlets.
-
ARC-ROOF-OVERFLOW
Emergency overflow
Shows early where and at what level water leaves the roof when outlets are blocked, so the parapet, facade, waterproofing upstand, and structural load assumptions can be coordinated.
-
FURN
Furniture
Reveals early whether spaces can actually be furnished for their intended use and are adequately sized.