Rule Fire protection directive 24-15 Heating plant
Operational readiness and maintenance of heating plant
VKF-24-15-019
pragmaticBIM.ch/vkf-24-15-019
Owners or operators ensure that heating plant is maintained as intended and is ready for operation at all times.
Source
VKF-Brandschutzrichtlinie 24-15 Wärmetechnische Anlagen (2015) (p. 16)
More rules for Fire protection directive 24-15 Heating plant
-
VKF-24-15-001
Heating plant: safe operation, verified products and permanent marking
Heating plant is built and installed so that it operates safely and damage in case of a fault stays limited; all parts withstand the thermal, chemical and mechanical stresses.
-
VKF-24-15-002
Ban on installing heat generators in escape routes, explosion-hazard rooms and rooms with high fire load
Heat generators must not be installed in escape routes, in rooms and zones with fire or explosion hazard, or in rooms with large and very large fire load. Not yet checkable: the model does not show nominal heat output, fuel, type of installation and fire resistance of the boiler room.
-
VKF-24-15-003
Single-family houses and flats: solid-fuel firing units in a room with EI 30
For liquid and gaseous fuels the construction and finish of the installation room are unrestricted.