Rule Fire protection directive 17-15 Escape route marking, safety lighting, safety power supply
Safety power sources: installation room at least EI 30, separation EI 60
VKF-17-15-013
pragmaticBIM.ch/vkf-17-15-013
Power sources for safety purposes and their controls are installed in fixed positions in rooms with a low fire risk. The installation room matches the fire resistance of the structure or the fire compartments, but at least EI 30; the doors are EI 30.
Description
It is separated from the distribution boards of the general power supply with EI 60. Batteries may stand in rooms without fire hazard and get a protective box EI 30; for batteries that are not maintenance-free the ceiling area is adequately ventilated. Not yet checkable: the model does not show which rooms contain safety power sources.
Source
VKF-Brandschutzrichtlinie 17-15 Kennzeichnung von Fluchtwegen, Sicherheitsbeleuchtung, Sicherheitsstromversorgung (2015) (p. 7)
More rules for Fire protection directive 17-15 Escape route marking, safety lighting, safety power supply
-
VKF-17-15-001
Offices, trade, schools, high-rise: escape signs and safety lighting
In office, industrial and trade buildings, school buildings, underground protective structures and high-rise buildings, exits and escape routes are marked with escape signs, and safety lighting is installed in the escape routes.
-
VKF-17-15-014
Distribution network for safety purposes: separate circuits, functional endurance, separation
Circuits for safety purposes are laid independently of other circuits. The distribution network is protected against fire so that functional endurance matches the intended operating time of the connected consumers.
-
VKF-17-15-015
Acceptance test of safety lighting and safety power supply
Complex projects for safety lighting and power supply for safety purposes, including escape-route marking, are submitted for approval before construction starts when the fire authority requests it. After completion, and after major extensions and changes, the installations are accepted and the test is documented.