Document

Hazardous-material report

SGG pragmaticBIM.ch/sgg

Report of hazardous-material findings in the existing building. Component-level type and remediation urgency are taken from it into the existing-building model.

Contents

  • Areas investigated and places that were not accessible
  • Affected components or layers with location
  • Hazardous-material type
  • Remediation urgency
  • Recommended measures before alteration or demolition
  • Date, author, and investigation status

More documents of this discipline

Contact

abstract ag

Imprint · Picassoplatz 4, 4052 Basel