Hazardous-material report
Report of hazardous-material findings in the existing building. Component-level type and remediation urgency are taken from it into the existing-building model.
Contents
- Areas investigated and places that were not accessible
- Affected components or layers with location
- Hazardous-material type
- Remediation urgency
- Recommended measures before alteration or demolition
- Date, author, and investigation status
More documents of this discipline
-
SCT
Sections
Building sections as the geometric and visual planning basis. They act as a completeness check against the IFC model - heights, layers, and vertical relationships must be readable on the drawing.
-
GSK
Building security concept
Security concept with security zones, security levels, protection goals, and required burglary resistance classes. Binding basis for model values and insert models of critical areas.
-
TL
Door schedule
Construction-ready schedule of all doors, gates, and inspection openings with the information required for ordering, fabrication, and installation.