Use case Ordering Costs & quantities
Procure IPD services against a functional base reference and reference costs
BES-IPD
pragmaticBIM.ch/bes-ipd
Procure design and construction under an IPD model against a shared functional base reference and market-indexed reference costs, tie fees to that reference, and settle outperformance against it after project completion.
Starting point
- Fixed-price or design-build awards without a shared reference reward risk premiums and leave fees and bonus payments unverifiable against the actual project outcome.
- Without indexed reference costs tied to realistic market prices, pricing bases are not comparable; deviations become visible only late and in dispute.
Goal & benefit
- Obtain a comparable IPD award on an approved functional and cost reference.
- Bind fee calculation and bonus settlement to the same reference so that better outcomes can be settled transparently against the reference values after project completion.
Process
- Provide the approved operational and functional foundations, room programme, quality requirements, and a lean room model.
- Establish the functional base reference and derive reference costs from realistic market prices with a price basis and indexation rule.
- Align bids to that reference and contractualize the fee and bonus rules.
Deliverable
- Approved IPD base reference with functional requirements and indexed reference costs.
- IPD contract with fee basis and bonus rules against the reference.
- Settlement logic for actual outcome versus reference after project completion.
Ways to do it
-
CostX RIB Software editorial listing
Quantity take-off and cost estimating from 2D drawings and BIM models.
Visit vendor · last checked
-
dRofus dRofus (Nemetschek) editorial listing
Database for room programme, room requirements and equipment, reconciled with BIM models.
Visit vendor · last checked
-
iTWO 4.0 RIB Software editorial listing
Model-based cost planning, tendering and project control (5D).
Visit vendor · last checked
-
simap.ch Verein simap.ch editorial listing
Platform for public procurement in Switzerland: publish tenders and provide documents.
Visit vendor · last checked
-
werk-material.online CRB editorial listing
Reference costs and benchmarks of completed Swiss buildings by eBKP-H and BKP.
Visit vendor · last checked
Suggest a tool All tools and services
Elements involved
Architecture (33)
- Project
- Planning perimeter
- Building
- Storey
- Survey reference point
- Interior spaces
- Exterior spaces
- Exterior wall
+25 more
- Balcony
- Base slab
- Floor slab
- Flat roof
- Footing
- Non-load-bearing interior wall
- Load-bearing interior wall
- Column
- Pitched roof
- Stair
- Beam / girder
- Fall protection / railing
- Exterior window
- Exterior door
- Opening / recess (architecture)
- Interior window
- Interior door / inspection hatch
- Suspended ceiling
- Interior floor build-up
- Facade cladding
- Tapered insulation / roof build-up
- Built-in furniture / kitchen
- Interior wall cladding
- Building-law parcels
- Site setup object
More use cases for Costs & quantities
-
BES-CONCRETE-TENDER
Provide the basis for the concrete tender
The client orders from the structural design team a model with verifiable concrete quantities and the tender-relevant information on concrete grade, reinforcement, and surface, so that the specification for concrete and reinforced concrete works is based on the same quantities as the design.
-
BES-FLOORING-TENDER
Provide the basis for the flooring tender
The client orders from the architecture team a room-by-room flooring schedule with covering type, area, and perimeter from the model, so that quantities in the specification match the design and do not have to be determined again from drawings.
-
BES-FIRESTOP-TENDER
Provide the basis for the firestop tender
The client orders from the design team a checked firestop schedule with an unambiguous link to each opening, so that firestops are tendered with real quantities and types instead of as a percentage of construction cost.