Verifiable sustainability
PG-03
pragmaticBIM.ch/pg-03
The aim is to check energy, material, and life-cycle targets directly against the current design status. Building simulation and life-cycle assessment need the same foundations as cost planning and design.
Explanation
If they live in a parallel dataset, they assess a design that has long since moved on, and the evidence has to be brought up to date by hand at the end.
Levels
SUS-01Low
No additional workflows beyond baseline requirements.
SUS-02Medium
Construction volume from the space model, the basis for energy verification according to SIA 380 using abstractBIM, and verification and optimization of energy performance during the first years of operation.
SUS-03High
Construction volume from the space model, verified energy performance during the first years of operation, full life-cycle calculation (LCA), disassembly potential, and a material passport derived from the model, plus sponge-city proof in the outdoor area.
Contributing use cases
BES · Ordering
-
BES-EXISTING-CIRCULARITYProcure existing-condition information for circularity
Procure circularity information as a targeted extension of the existing-condition model so that reuse, remediation, and recovery can be assessed early.
DES · Design
-
DES-KVDetermine the construction volume
Derive construction volume from gross volume, net spaces, and air spaces so material use can be compared already in early phases.
-
DES-ABSTRACTBIM-BPSDerive the basis for heating demand verification to SIA 380/1 from the model
Derive the basis for heating demand verification to SIA 380/1 from the architecture model without manually remodelling the thermal envelope.
-
DES-LCACalculate the life-cycle assessment
Carry component quantities, materials, and product class so LCA and grey energy via KBOB are possible without parallel quantity lists: early via the product class, later refined by the calculated type.
-
DES-MATERIAL-PASSCreate the material passport for urban mining
Anchor materials, detachability, and reuse potential in the model - so building material passports and LCAs are possible without manual re-entry.
-
DES-UVPDevelop the environmental impact report
Prepare the environmental impact assessment from the current design state so that impacts can be demonstrated consistently to authorities and in the building application.
QAS · Quality assurance
-
LAN-SPONGE-CITYVerify the sponge-city principle
Model root space, infiltration, and retention in the outdoor area so rainwater stays on site instead of flowing into the sewer, and trees receive a root volume that sustains them over their standing life.
HOV · Handover
-
HOV-PRODUCT-PASS-GTINLink the product passport via GTIN
Link product-passport information unambiguously to installed product types by GTIN without duplicating the complete manufacturer data in the model.
-
HOV-PRODUCT-PASS-SERIALLink the product passport via serial number
Assign product-passport information to an individual installed product by GTIN (Global Trade Item Number) and serial number, keeping its individual life cycle traceable.
OPR · Operation
-
OPR-BUILDING-PERFORMANCEOptimize building operation during the first years
Support building operation during the first years with actual use and measurement data so deviations from the operating concept are identified and effective optimizations are demonstrated.
More project goals
-
PG-01
Costs & quantities
The aim is not a particular figure but a cost forecast you can rely on. It starts with traceable quantities.
-
PG-05
Schedule & coordination
The aim is not a particular date but a schedule that holds. Schedule certainty comes from coordinating in good time.
-
PG-07
Decision certainty
The aim is to make strategic and design decisions early, comparably, and traceably. Structured use and massing foundations, option comparisons, visualizations, and documented approvals show the consequences of a decision while the project can still be changed.