Goal

Verifiable sustainability

PG-03 pragmaticBIM.ch/pg-03

The aim is to check energy, material, and life-cycle targets directly against the current design status. Building simulation and life-cycle assessment need the same foundations as cost planning and design.

Explanation

If they live in a parallel dataset, they assess a design that has long since moved on, and the evidence has to be brought up to date by hand at the end.

Levels

SUS-01Low

No additional workflows beyond baseline requirements.

SUS-02Medium

Construction volume from the space model, the basis for energy verification according to SIA 380 using abstractBIM, and verification and optimization of energy performance during the first years of operation.

SUS-03High

Construction volume from the space model, verified energy performance during the first years of operation, full life-cycle calculation (LCA), disassembly potential, and a material passport derived from the model, plus sponge-city proof in the outdoor area.

Contributing use cases

BES · Ordering

DES · Design

QAS · Quality assurance

  • LAN-SPONGE-CITYVerify the sponge-city principle

    Model root space, infiltration, and retention in the outdoor area so rainwater stays on site instead of flowing into the sewer, and trees receive a root volume that sustains them over their standing life.

HOV · Handover

OPR · Operation