Boundary condition Boundary conditions
Construction during operation
PG-41
pragmaticBIM.ch/pg-41
This framework condition sets whether the building stays in use during construction. It drives phasing, temporary measures, decant space, and site logistics with separate routes for operation and construction.
Explanation
It is decisive when renovating schools, hospitals, and offices.
Variants
-
BUB-01Building empty
The building or site is not in use during construction. Site logistics follow the construction sequence alone.
-
BUB-02Partly in use with phasing
Parts of the building stay in operation while other phases are refurbished. Phases, decant space, and site access are planned and checked in the model.
Activates: Check site logistics across the construction phases
-
BUB-03Fully in use
Operation continues without restriction for the whole construction period. Noise, dust, escape routes, and deliveries are agreed with operations for each phase.
Activates: Check site logistics across the construction phases, Manage fit-out room by room with a checklist
Activated use cases
QAS · Quality assurance
-
QAS-SITE-LOGISTICSCheck site logistics across the construction phases
Plan site logistics volumetrically and keep them current across phases - before ramps, slopes, and space needs surprise on site.
CON · Construction
-
CON-ROOM-LABELManage fit-out room by room with a checklist
Keep the fit-out steps for each room in a shared checklist so that trades work to a takt and the status of every room is visible on site.
More boundary conditions
-
PG-04
Facility management
This framework condition determines who operates the building and with which systems: space and equipment lists, managed objects in the 3D model, or a COBie import. That decision determines which information must be handed over at the end of the project.
-
PG-15
Refit frequency
How often spaces, equipment, and installations are refitted decides how current the as-built data must be in operation. The more often the building is refitted, the more facility management use cases are preselected.
-
PG-18
Fit-out state at handover
The fit-out state at handover sets where the base build ends and the tenant fit-out begins. Cost interfaces and building services per tenant unit depend on it.