Structured list of the rooms ordered at an agreed status, with a stable technical room number, ordered room type, and groupings. Binding basis for designer procurement, competition, and comparison with the model.
Contents
- Each room instance with a stable technical room number and name
- Assigned ordered room type with the ordered functional, spatial, and technical requirements
- Usage units, departments, and other agreed groupings
- Ordered area or further metrics per room
- Version and approval status of the order
More documents of this discipline
-
RGR
Daywork reports
Daywork reports for time-and-material work. They prevent unplanned extra cost by coupling daywork directly to the affected milestones and containers (project, site, building, storey).
-
SGG
Hazardous-material report
Report of hazardous-material findings in the existing building. Component-level type and remediation urgency are taken from it into the existing-building model.
-
SCT
Sections
Building sections as the geometric and visual planning basis. They act as a completeness check against the IFC model - heights, layers, and vertical relationships must be readable on the drawing.