Room book
Continuously maintained data container for ordered room types, planning room types, room instances, and their requirements and deviations throughout the project.
Contents
- Planning room types with an unambiguous name, recurring functional, spatial, and technical requirements, and assignment to the ordered room type from the room programme
- Every room instance with a project-wide unique and stable technical room number and name
- Assignment of every room instance to a planning room type and the agreed groupings
- Deviations of a room instance from its assigned planning room type, including reason and approval status
- Effective requirements and metrics for each room, accounting for type requirements and instance deviations
- Version and approval status of the room book
More documents of this discipline
-
RPG
Room programme
Structured list of the rooms ordered at an agreed status, with a stable technical room number, ordered room type, and groupings. Binding basis for designer procurement, competition, and comparison with the model.
-
RGR
Daywork reports
Daywork reports for time-and-material work. They prevent unplanned extra cost by coupling daywork directly to the affected milestones and containers (project, site, building, storey).
-
SGG
Hazardous-material report
Report of hazardous-material findings in the existing building. Component-level type and remediation urgency are taken from it into the existing-building model.