Boundary condition Boundary conditions
Earthquake
PG-33
pragmaticBIM.ch/pg-33
This framework condition sets the structure class under SIA 261 and, in a renovation, how far the existing structure is upgraded under SIA 269/8. It matters mainly when the client raises it or decides the degree of upgrading.
Explanation
It drives load-bearing and bracing walls, slabs, and the floor plans that depend on them.
Variants
-
ERD-01Structure class I
Ordinary structures such as housing, offices, and commercial buildings. Earthquake safety is verified as part of the structural design.
-
ERD-02Structure class II
Structures with high occupancy or important infrastructure, such as schools, hospitals without acute care, and shopping centres. Bracing walls are coordinated with the structure early.
Activates: Coordinate architecture and structure, Check component types against performance requirements, Tender installation suspensions as a separate trade
-
ERD-03Structure class III
Vital structures that must stay in operation after an earthquake, such as acute hospitals, fire stations, and emergency control centres. Structure and fit-out are designed for operation after the event.
Activates: Coordinate architecture and structure, Check component types against performance requirements, Tender installation suspensions as a separate trade
Activated use cases
BES · Ordering
-
BES-SEISMIC-MEPTender installation suspensions as a separate trade
Tender suspension of building services early as a separate trade so that design, coordination, and installation are clearly owned by one specialist contractor.
QAS · Quality assurance
-
QAS-ARCH-STRUCT-COORDCoordinate architecture and structure
Coordinate load-bearing components between the architecture and structural models so that geometric deviations are detected before construction and do not have to be maintained twice.
-
QAS-ELEMENT-PERFCheck component types against performance requirements
Check wall, slab, window, and door component types against the performance requirements that follow from the chosen framework conditions, so every type demonstrably meets what was ordered.
More boundary conditions
-
PG-11
Construction method & prefabrication
This framework condition determines whether the construction method remains open, is designed conventionally, or targets a high degree of prefabrication in timber, steel, or concrete. This choice determines when contractors must be involved, interfaces resolved, and shop, production, and assembly information provided.
-
PG-12
Security / critical infrastructure
This framework condition determines how strictly information and building security are handled for critical infrastructure: which CDEs are allowed and whether security-critical areas and building security measures must be managed and checked on a model basis.
-
PG-08
Procurement strategy
This framework condition determines the procurement route: engaging designers directly, a competition, design-build, or IPD. Each route places different demands on foundations, models, and bids.