Provision for void
MEP-PROV-VOID
pragmaticBIM.ch/mep-prov-void
Reserves penetrations in time so structure and building services can be coordinated without later core drilling.
Description
- Volume for the location and clear dimensions of the desired void in load-bearing components.
- Used for coordination; implemented as a binding opening in the structural model only after approval.
Modelling guidelines
- Model as a simplified proxy body in the MEP model; dimensions = desired clear opening including tolerance per project agreement.
- Assign to the matching storey; do not cut a load-bearing component or model an opening on the structure itself.
- Set Name and Reference so the later structural opening can be matched unambiguously.
IFC entity
- IFC4
- IfcBuildingElementProxy
- IFC4.3
- IfcBuildingElementProxy
- IFC2x3
- IfcBuildingElementProxy
- Applicability rule
- entity_ifc4=IfcBuildingElementProxy AND PredefinedType=PROVISIONFORVOID
Attributes
| Attribute | Definition | Used in |
|---|---|---|
| Name |
Provision-for-void designation for assignment to service, equipment, or structural opening. |
|
| PredefinedType |
Marks the proxy as a provision for void. Allowed values
|
|
| Reference Pset_BuildingElementProxyCommon |
Reference for unique alignment with the approved structural opening. |
Related elements
-
MEP-SCH-PIPE
Pipe (schematic)
Reserves main pipework routes in the initial phase and reduces later clashes.
-
MEP-SCH-DUCT
Duct (schematic)
Reserves main ventilation routes in the initial phase and reduces later clashes.
-
MEP-SCH-TRAY
Cable tray (schematic)
Reserves main electrical routes in the initial phase and reduces later clashes.