Use case Design Costs & quantities
Calculate element-based costs in early project phases
DES-ELEMENT-COST-EARLY
pragmaticBIM.ch/des-element-cost-early
Combine component quantities and early unit rates into a traceable cost forecast while constructions and build-ups are not yet fully defined.
Starting point
- Early estimates often rely on floor-area or volume benchmarks and do not show which components drive the costs.
- Product classes, quantities, and cost rates often sit in separate lists, so comparing options and changes requires manual rework.
Goal & benefit
- Calculate costs early from component quantities instead of relying on building benchmarks alone.
- Compare options on a consistent element breakdown and state assumptions, contingencies, and cost confidence openly.
- Reuse the same quantity and product-class basis for detailed cost calculation and life-cycle assessment.
Process
- Provide cost-relevant components with product class, reference quantity, and traceable model quantities; mark unknown product classes as reasoned assumptions.
- Assign unit rates per product class from the approved cost database and calculate component costs as reference quantity × unit rate.
- Evaluate costs by element, check them against building benchmarks, and document assumptions, price basis, contingencies, and confidence.
Deliverable
- Element-based cost estimate with quantities, unit rates, price basis, and total cost
- Documented assumptions, contingencies, and confidence per product class
Note: abstractBIM can calculate components from the relationships between spaces and use them as the quantity basis for this cost calculation.
Ways to do it
-
AnkerDB AnkerDB AS editorial listing
Links model quantities to unit prices through a catalogue; costs update with every model revision.
Visit vendor · last checked
-
CostX RIB Software editorial listing
Quantity take-off and cost estimating from 2D drawings and BIM models.
Visit vendor · last checked
-
iTWO 4.0 RIB Software editorial listing
Model-based cost planning, tendering and project control (5D).
Visit vendor · last checked
-
PROVIS Axept Business Software AG editorial listing
Swiss construction management and tendering software with IFC import, BIM viewer, eBKP/BKP costing and NPK tendering.
Visit vendor · last checked
-
vyzn vyzn AG editorial listing
Model-based building analysis for LCA to SIA 2032/KBOB, energy to SIA 380/1, daylight and early costs.
Visit vendor · last checked
-
werk-material.online CRB editorial listing
Costs from the 3D model with eBKP-H calculator and FSO benchmarks.
Visit vendor · last checked
Suggest a tool All tools and services
Elements involved
Architecture (28)
- Project
- Planning perimeter
- Building
- Storey
- Survey reference point
- Interior spaces
- Exterior spaces
- Exterior wall
+20 more
- Balcony
- Base slab
- Floor slab
- Flat roof
- Footing
- Non-load-bearing interior wall
- Load-bearing interior wall
- Column
- Pitched roof
- Stair
- Beam / girder
- Fall protection / railing
- Exterior window
- Exterior door
- Interior window
- Interior door / inspection hatch
- Suspended ceiling
- Interior floor build-up
- Facade cladding
- Interior wall cladding
More use cases for Costs & quantities
-
DES-ELEMENT-COST-LATE
Calculate element-based costs in late project phases
Develop the early forecast into a detailed cost calculation using calculated component types, refined quantities, and type-specific unit rates.
-
DES-APT-SCHEDULE
Prepare apartment schedule
Derive the apartment schedule from gross volumes and net spaces and update it reliably when the design changes.
-
DES-URBAN-MASS
Create the urban design mass study
Model and evaluate gross volumes by storey so that urban design options and metrics can be compared directly.