Boundary condition Boundary conditions
Procurement strategy
PG-08
pragmaticBIM.ch/pg-08
This framework condition determines the procurement route: engaging designers directly, a competition, design-build, or IPD. Each route places different demands on foundations, models, and bids.
Explanation
The procurement strategy therefore sets the bid models and assessment criteria required.
Variants
-
PROC-01Designer procurement
Procure design services against the required capabilities, results, and data deliveries, distinguishing basic services from project-specific additional services.
Activates: Procure a design team with professional and digital expertise, Procure the CDE through the client
-
PROC-02Competition
Assess competition entries comparably using a lean, consistent model requirement and focus the evaluation on the decisive spatial and functional qualities.
Activates: Procure a design team with professional and digital expertise, Evaluate competition entries with a room model, Procure the CDE through the client
-
PROC-03Design-build
Procure design and construction together on clarified functional and quality foundations and assess the solution, scope, and binding offer price against consistent criteria.
Activates: Procure a design team with professional and digital expertise, Evaluate competition entries with a room model, Procure design-build services with a binding offer, Procure the CDE through the client
-
PROC-04IPD
Procure design and construction under an IPD model against a functional base reference and market-indexed reference costs, and bind fees and bonus settlement to that same reference.
Activates: Procure a design team with professional and digital expertise, Evaluate competition entries with a room model, Procure design-build services with a binding offer, Procure IPD services against a functional base reference and reference costs, Procure the CDE through the client
Activated use cases
BES · Ordering
-
BES-DESIGNER-PROCUREMENTProcure a design team with professional and digital expertise
Procure planning services against the required capabilities, results, and data deliveries instead of ordering BIM wholesale as an additional working method.
-
BES-OWNER-CDEProcure the CDE through the client
Procure the common data environment directly through the client so that control of the data and project access remain intact in the event of insolvency or dispute. Delegate its administration to the project lead.
-
BES-ABSTRACTBIM-COMPEvaluate competition entries with a room model
Evaluate competition entries comparably with minimal modelling effort and focus detailed development on one aspect that is critical to the brief.
-
BES-DESIGN-BUILDProcure design-build services with a binding offer
Procure design and construction together on a functionally clarified basis and compare the proposed solution, scope, and offer price consistently.
-
BES-IPDProcure IPD services against a functional base reference and reference costs
Procure design and construction under an IPD model against a shared functional base reference and market-indexed reference costs, tie fees to that reference, and settle outperformance against it after project completion.
More boundary conditions
-
PG-41
Construction during operation
This framework condition sets whether the building stays in use during construction. It drives phasing, temporary measures, decant space, and site logistics with separate routes for operation and construction.
-
PG-04
Facility management
This framework condition determines who operates the building and with which systems: space and equipment lists, managed objects in the 3D model, or a COBie import. That decision determines which information must be handed over at the end of the project.
-
PG-15
Refit frequency
How often spaces, equipment, and installations are refitted decides how current the as-built data must be in operation. The more often the building is refitted, the more facility management use cases are preselected.