Use case Quality assurance Permit certainty
Check and verify funding
QAS-FUND
pragmaticBIM.ch/qas-fund
Identify eligible measures early and maintain traceable evidence through to payment.
Starting point
- Funding conditions, deadlines, and evidence are distributed across guidelines and project documents; funding opportunities are therefore missed or payments put at risk.
- With multiple applications and design changes, assignments to components and the applied-for and executed quantities are difficult to trace.
Goal & benefit
- Pre-check eligible measures against versioned programme conditions, current model quantities, and technical values.
- Keep applications current throughout design and construction, expose deviations, and complete close-out evidence on time.
Process
- Provide current discipline models, the component catalogue, cost calculation, and applicable funding conditions.
- Enter the application number on the affected components, several numbers separated by commas, and check quantities, values, and costs against the documented guideline version.
- Update the check after design and construction changes and consolidate status, deadlines, deviations, and evidence in the funding report.
Deliverable
- Funding report with applications, measures, calculations, status, and open items
- Traceable model references and complete evidence for application, approval, and close-out
Ways to do it
-
Energiefranken Energiefranken editorial listing
Search portal for energy and building subsidy programmes by postcode in Switzerland.
Visit vendor · last checked
-
Label-Plattform Minergie Schweiz editorial listing
Manages Minergie verifications and certificates through to final certification.
Visit vendor · last checked
Suggest a tool All tools and services
Elements involved
Architecture (27)
+19 more
- Floor slab
- Flat roof
- Footing
- Non-load-bearing interior wall
- Load-bearing interior wall
- Column
- Pitched roof
- Beam / girder
- Exterior window
- Exterior door
- Interior window
- Interior door / inspection hatch
- Suspended ceiling
- Interior floor build-up
- Facade cladding
- Tapered insulation / roof build-up
- Furniture
- Built-in furniture / kitchen
- Interior wall cladding
MEP (35)
- Pipe (schematic)
- Duct (schematic)
- Cable tray (schematic)
- Downpipe
- Chiller
- Cooling tower / free cooler
- Backup generator
- Electrical distribution board
+27 more
- Transformer
- Uninterruptible power supply
- Boiler / water heater
- District heat substation
- Compressed air compressor
- Gas pressure regulator
- Fan
- Tank / separator
- Pump
- Unitary equipment / monoblock
- Communications appliance
- Chilled ceiling / beam
- Radiator
- Air terminal / grille
- Air terminal box
- Light fixture
- Socket / data outlet
- Switch
- Damper
- Sanitary terminal
- Waste terminal
- Gas outlet
- Fire suppression terminal
- Valve / manifold
- Smoke detector / alarm
- Sensor
- Actuator
More use cases for Permit certainty
-
COM-QR-STAKEHOLDER-INFO
Digital resident information
Keep residents informed continuously via letter or notice with a QR code about measures and site installation, so those affected can inform themselves instead of guessing or complaining.
-
COM-STAKEHOLDER-DIALOG
Neighbourhood and stakeholder dialogue
Involve affected neighbours and authority representatives in a structured way before submission, so objections surface early rather than only in the formal objection procedure.
-
QAS-URBAN-AR
Assess the urban design on site with augmented reality
Assess the volume model and the planned trees on site with AR glasses, so urban design decisions are not taken on a figure-ground plan that omits the third dimension and the vegetation volume.