Rule Fire protection directive 25-15 Ventilation systems

Ducts with increased requirements in an installation shaft: separation EI 30

VKF-25-15-019 pragmaticBIM.ch/vkf-25-15-019

Several ventilation ducts of systems with increased requirements (clauses 4.3.1 to 4.3.3) in the same installation shaft are separated storey by storey and compartment by compartment with a 30-minute fire protection board of RF1; RF1 ducts may instead be clad individually with EI 30 of RF1.

Description

From other installations in the shaft they are likewise separated with such a board. Several combustible ducts in the same shaft need no separation if deluge or sprinkler nozzles are installed in the shaft. Not yet checkable: the model does not show which ducts share a shaft or how they are separated.

Source

VKF-Brandschutzrichtlinie 25-15 Lufttechnische Anlagen (2015) (p. 11)