Operating theatre
RT-HE-04
pragmaticBIM.ch/rt-he-04
Room for surgical procedures.
Room name code
RN-05-20-02 Operating theatre
Standard values
| Attribute | Value | Unit |
|---|---|---|
| PredefinedType | SPACE | |
| IsExternal Pset_SpaceCommon | FALSE | |
| LongName | Operating theatre | |
| Reference Pset_SpaceCommon | HNF | |
| NetPlannedArea ePset_SpaceRequirement | 45 | m² |
| FloorCovering Pset_SpaceCoveringRequirements | Epoxidharzbelag | |
| WallCovering Pset_SpaceCoveringRequirements | fugenloser Belag | |
| CeilingCovering Pset_SpaceCoveringRequirements | Metal sheet ceiling | |
| VibrationRequirements ePset_SpaceRequirement | ISO Operating Theatre (OT) | |
| InteriorOrExteriorSpace | INTERNAL | |
| DesignAreaLoad ePset_SpaceRequirement | 3 | kN/m² |
| DesignPointLoad ePset_SpaceRequirement | 2 | kN |
| SecurityLevel ePset_Space | Internal | |
| WinterTemperatureMin ePset_SpaceRequirement | 18 | °C |
| WinterTemperatureMax ePset_SpaceRequirement | 24 | °C |
| SummerTemperatureMin ePset_SpaceRequirement | 18 | °C |
| SummerTemperatureMax ePset_SpaceRequirement | 24 | °C |
| RequiredIlluminance ePset_SpaceRequirement | 1000 | lx |
| PeakOccupancy ePset_SpaceRequirement | 8 | Personen |
| DailyOperatingHours ePset_SpaceRequirement | 10 | h/Tag |
| OutdoorAirFlowRate ePset_SpaceRequirement | 240 | m³/h |
| RelativeHumidityMin ePset_SpaceRequirement | 30 | % |
| RelativeHumidityMax ePset_SpaceRequirement | 60 | % |
Equipment
| Operating table space | 1 |
| Medical device space | 2 (1-4) |
| Worktop | 1 (0-2) |
Socket outlet
|
min. 1, 1 per 10 m² net floor area |
Light switch
|
1 |