Use case Quality assurance Permit certainty

Verify accessibility to SIA 500

QAS-ACCESS-SIA500 pragmaticBIM.ch/qas-access-sia500

Make deviations from the accessible route visible before the permit submission, instead of discovering them only during the permit procedure.

Starting point

  • Minimum widths and room dimensions can often be checked directly from the model; movement and manoeuvring areas are usually missing there because they are not part of ordinary modelling.
  • Without these areas, deviations from SIA 500 stay invisible until the specialist authority or the permit procedure uncovers them - every correction there costs time.
  • Handrails, control heights, thresholds, floor surfaces, and signage cannot be derived from the model in any case and remain to be checked manually.

Goal & benefit

  • Identify deviations before submission, instead of correcting them during the permit procedure.
  • Check door widths, corridors, ramps, sanitary rooms, and movement areas automatically instead of with a scale ruler on the drawing.
  • Document the accessible route directly in the model, instead of reconstructing it afterwards.

Process

  1. Mark rooms and doors along the accessible route and use rules to check clear door and corridor widths, ramp gradients and widths, and the area and shortest side of the required sanitary rooms.
  2. Model 1.40 × 1.70 m turning areas in public-building corridors at intervals of no more than 15 m, 1.40 × 1.40 m manoeuvring areas at direction changes exceeding 45° and in front of lifts, and clear areas preferably 0.60 m but at least 0.20 m wide beside the swings of house, apartment, and parking-garage entrance doors, then check them for clashes.
  3. Document deviations, colour the accessible room sequence in the plan, and add the requirements to be checked manually for handrails, control heights of 0.80 - 1.10 m, thresholds up to 25 mm, floor surfaces, and signage.

Deliverable

  • Coloured accessibility plan for the permit submission and consultation with the specialist authority.
  • Rule-check report for doors and rooms.
  • Clash report for the movement areas.

Ways to do it

  • BIMcollab Zoom BIMcollab editorial listing

    IFC viewer and model checking with rules, colouring by properties and BCF issues.

    Visit vendor · last checked

  • IFC-Lite LTplus AG editorial listing

    Open-source IFC toolkit for browser, server and CLI to view, query, validate, edit and export models.

    Visit vendor · last checked

  • Solibri Office Solibri (Nemetschek) editorial listing

    Rule-based checking of IFC models for clashes, model quality and requirements.

    Visit vendor · last checked

Suggest a tool All tools and services

Elements involved

More use cases for Permit certainty