Elements are the building components and objects a model has to contain. Each element names its IFC entity and the attributes the use cases ask for.

Setup
PROJECT Project Establishes the shared organizational frame of reference so that discipline models and their content can be assigned unambiguously to the same construction project. Architecture IfcProject SITE Planning perimeter Defines the shared project area so that buildings, property references, and external works can be coordinated consistently in space. Architecture IfcSite BUILDING Building Structures the construction project into clearly identifiable building volumes so that discipline models, storeys, and evaluations can be coordinated by building. Architecture IfcBuilding STOREY Storey Establishes the shared vertical structure so that spaces and components can be assigned to the same building level across all discipline models. Architecture IfcBuildingStorey SURVEY-REF Survey reference point Provides a binding position and height reference so that discipline models align correctly and can be set out accurately on site. Architecture IfcBuildingElementProxy SPACE-GROSS Gross volumes Provides a consistent basis for massing studies, area and volume evaluations, and urban design decisions. Architecture IfcSpace SPACE-INT Interior spaces Links the room programme, area verification, and discipline planning so that use, sizing, and technical requirements can be coordinated for each space. Architecture IfcSpace SPACE-EXT Exterior spaces Makes usable exterior areas measurable for area verification, use planning, and coordination between the building and its surroundings. Architecture IfcSpace SPACE-ELEVATOR Lift Enables the occupied area to be assigned by storey so that area verification can be maintained correctly. Architecture IfcSpace SPACE-AIR Air spaces Prevents non-occupiable volumes from being counted as floor area while providing a spatial reference for building services. Architecture IfcSpace SPACE-PARK Parking spaces Enables traceable parking verification and reliable area and traffic planning from the building design phase onward. Architecture IfcSpace SPACE-VORSATZ Wall lining (usable space) Makes space and floor-area loss verifiable early so that rooms, especially sanitary spaces, can be sized adequately. Architecture IfcSpace ARC-WALL-EXT Exterior wall Exterior walls provide the basis for area and quantity take-off, building physics, and facade coordination. Architecture IfcWall ARC-SLAB-BALCONY Balcony Makes exterior space, the structural concept, and the building envelope jointly verifiable early on and supports reliable permitting and cost decisions. Architecture IfcSlab ARC-SLAB-BASE Base slab Makes the building support and load transfer into the ground spatially verifiable early and provides design certainty for basements, waterproofing, and excavation. Architecture IfcSlab ARC-SLAB-FLOOR Floor slab Defines the load-bearing separation between storeys early and provides design certainty for room heights, structure, and building services. Architecture IfcSlab ARC-ROOF-FLAT Flat roof Makes the structural concept and building enclosure spatially verifiable early and provides design certainty for levels, build-ups, and permitting. Architecture IfcSlab ARC-FOOTING Footing Makes the space and location required to transfer loads into the ground verifiable early and prevents conflicts with basements, services, and excavation. Architecture IfcFooting ARC-WALL-INT Non-load-bearing interior wall Makes the spatial layout reliably verifiable early on and provides the basis for fire, acoustic, and interior-fit-out coordination. Architecture IfcWall ARC-WALL-INT-LB Load-bearing interior wall Makes load transfer and space separation jointly verifiable early on and provides a reliable basis for structural, fire, and acoustic coordination. Architecture IfcWall ARC-COLUMN Column Makes point load transfers spatially verifiable early and prevents conflicts with the spatial layout, facade, and building services. Architecture IfcColumn ARC-ROOF-PITCH Pitched roof Makes the roof form and structural concept spatially verifiable early on and supports reliable permitting and coordination decisions. Architecture IfcRoof ARC-STAIR Stair Rough stair geometry for design, coordination, and quantity take-off. Architecture IfcStairFlight ARC-BEAM Beam / girder Makes load-transfer zones visible early and prevents conflicts between the structure, spatial concept, and building services. Architecture IfcBeam ARC-RAILING Fall protection / railing Simplified geometry for spatial planning and assessment of permanent and temporary fall protection. Architecture IfcRailing ARC-WINDOW-EXT Exterior window Ensures daylight, ventilation, and views and provides a verifiable basis for facade and building-physics design. Architecture IfcWindow ARC-DOOR-EXT Exterior door Ensures functional building access and provides the basis for escape-route, facade, and building-physics design. Architecture IfcDoor ARC-OPENING-VOID Opening / recess (architecture) Secures the required routes for services and installations and prevents uncoordinated penetrations between architecture, structure, and building services. Architecture IfcOpeningElement ARC-WINDOW-INT Interior window Ensures daylight transfer between interior spaces and provides a verifiable basis for spatial and acoustic design. Architecture IfcWindow ARC-DOOR-INT Interior door / inspection hatch Ensures functional connections between spaces and provides the basis for escape-route, fire, and acoustic design. Architecture IfcDoor ARC-SHADING Shading device Makes external sun protection visible in the model so location, type, and shading are recorded for facade planning and thermal simulation. Architecture IfcShadingDevice ARC-FIRE-ACOUSTIC-SEAL Firestop / acoustic seal Separates the installed seal from the opening and makes its type, performance, and quantity verifiable for tendering, construction, and operation. Architecture IfcBuildingElementProxy ARC-CEILING Suspended ceiling Ensures coordinated room heights, ceiling design, and building services. Architecture IfcCovering ARC-FLOOR-COV Interior floor build-up Provides a reliable basis for level coordination, joint design, tendering, and quantity take-off for interior finishes. Modelled in every room from tendering on; before that and in operation, the floor finish sits on the interior space. Architecture IfcCovering ARC-FLOOR-COV-EXT Exterior floor covering Makes exterior finishes verifiable in detail design for quantities, joints, and tendering. Early planning without a modelled covering: FloorCovering (AOF) on the exterior space. Architecture IfcCovering ARC-WALL-CLAD-EXT Facade cladding Enables separate design and quantity take-off of the facade surface and improves coordination with connections and openings. Architecture IfcCovering ARC-ROOF-DRAIN Tapered insulation / roof build-up Shows early how much build-up height the roof and balcony fall requires. The building height is then fixed for the permit, and pipes in the foundation can be connected to the outlets. Architecture IfcCovering ARC-ROOF-OVERFLOW Emergency overflow Shows early where and at what level water leaves the roof when outlets are blocked, so the parapet, facade, waterproofing upstand, and structural load assumptions can be coordinated. Architecture IfcBuildingElementProxy FURN Furniture Reveals early whether spaces can actually be furnished for their intended use and are adequately sized. Architecture IfcFurniture ARC-FURN-BUILTIN Built-in furniture / kitchen Shows early how much space the kitchen and built-in cabinets need and where the connections sit. Shop and installation design can check dimensions and connections against this. Architecture IfcFurniture ARC-WALL-CLAD Interior wall cladding Enables room-specific design and quantity take-off of surface finishes for tendering and interior-fit-out coordination. Architecture IfcCovering ARC-DRYWALL-REINF Drywall reinforcement zone Makes required fixing support spatially checkable before tendering and construction and prevents subsequent daywork. Architecture IfcBuildingElementProxy LAN-TREE Tree Makes decisions on protection, removal, and new planting spatially verifiable so that the building and external works account for the tree inventory. Architecture IfcGeographicElement SURVEY-SURFACE Surface geometry Provides existing and designed terrain so that connections to the building and earth quantities can be planned in coordination. Architecture IfcGeographicElement ARC-PARCEL Building-law parcels Shows early which cadastral parcels the project affects and supports alignment of the planning perimeter and permitting process. Architecture IfcBuildingElementProxy LAN-HUMUS Topsoil Makes topsoil quantities verifiable early for cost, so that stripping, reinstatement, and surplus do not appear only at tender. Architecture IfcGeographicElement ARC-UMG-NEIGHBOR Surrounding buildings Represents neighbouring buildings as simple volumes so objection-relevant effects (shadow, views, setbacks) can be checked and documented in the stakeholder dialogue. Architecture IfcBuildingElementProxy LAN-RETENTION Retention volume Makes retention volume assignable to catchments and the sizing against heavy rain traceable. Architecture IfcBuildingElementProxy ARC-SITE-LOG Site setup object Makes the space requirements and sequence of site logistics alignable early and prevents conflicts during construction. Architecture IfcBuildingElementProxy ARC-DET-REF Detail reference Makes it spatially verifiable where standard details apply and reveals missing or conflicting detail assignments early. Architecture IfcBuildingElementProxy ARC-DEC-VOL Decision volume Makes it spatially verifiable where a decision applies and whether it is still open, approved, or superseded. Architecture IfcBuildingElementProxy ARC-INSTALL-PATH Installation access path Ensures large equipment can be transported to its installation location without clashes. Architecture IfcBuildingElementProxy ARC-COORD-ZONE Coordination zone Clearly assigns spatial review areas to coordination meetings and prevents unclear responsibilities. Architecture IfcBuildingElementProxy ARC-CONSTRAINT Planning constraint Makes external requirements spatially verifiable from an early stage and supports quality assurance when checking the design against protection, hazard, and permitting requirements. Architecture IfcBuildingElementProxy ARC-MAINT-SPACE Maintenance space Ensures plant remains permanently accessible and can be maintained without spatial conflicts. Architecture IfcBuildingElementProxy ARC-MOVEMENT-CLEARANCE Movement clearance Makes the areas that must remain clear for accessibility spatially verifiable so conflicts with building elements and furniture are found before the permit submission. Architecture IfcBuildingElementProxy ARC-TURN-RAD Turning radius Demonstrates that vehicles can safely use the planned access routes and manoeuvring areas. Architecture IfcBuildingElementProxy ARC-UMBAU-PER Alteration area Makes planned and completed alterations spatially and chronologically traceable in the overall model. Architecture IfcBuildingElementProxy ARC-DEVICE-SPACE Device space Reserves space early for devices that drive room size, structure or connections, so special rooms can be agreed with users before devices are chosen. Architecture IfcBuildingElementProxy MEP-PROV-VOID Provision for void Reserves penetrations in time so structure and building services can be coordinated without later core drilling. MEP IfcBuildingElementProxy MEP-SCH-PIPE Pipe (schematic) Reserves main pipework routes in the initial phase and reduces later clashes. MEP IfcPipeSegment MEP-SCH-DUCT Duct (schematic) Reserves main ventilation routes in the initial phase and reduces later clashes. MEP IfcDuctSegment MEP-SCH-TRAY Cable tray (schematic) Reserves main electrical routes in the initial phase and reduces later clashes. MEP IfcCableCarrierSegment MEP-SCH-EQUIP Plant space (schematic) Reserves sufficient plant-room space in the initial phase and prevents conflicts with other uses. MEP IfcBuildingElementProxy MEP-DOWNPIPE Downpipe Secures roof and balcony drainage by coordinating routes, connections, and slab penetrations. MEP IfcPipeSegment MEP-CHILLER Chiller Secures cooling supply by coordinating capacity, plant footprint, and service connections early. MEP IfcChiller MEP-COOL-TOWER Cooling tower / free cooler Secures heat rejection by coordinating capacity, location, structure, acoustics, and water management. MEP IfcCoolingTower MEP-ELEC-GEN Backup generator Secures standby power by coordinating capacity, location, fuel supply, and exhaust routing. MEP IfcElectricGenerator MEP-ELEC-DIST Electrical distribution board Represents the distribution hierarchy so loads, feeders, plant space, and accessibility can be coordinated. MEP IfcElectricDistributionBoard MEP-TRANSFORMER Transformer Secures the required voltage level by coordinating load, plant space, cooling, and protection requirements. MEP IfcTransformer MEP-UPS Uninterruptible power supply Secures critical loads by coordinating autonomy, loads, plant space, and cooling. MEP IfcElectricFlowStorageDevice MEP-BOILER Boiler / water heater Secures heat supply by coordinating capacity, plant footprint, flue route, and service connections early. MEP IfcBoiler MEP-HEAT-EX District heat substation Clarifies thermal system separation so substation capacity, connections, and space requirements can be coordinated. MEP IfcHeatExchanger MEP-COMPRESSOR Compressed air compressor Secures compressed-air supply by coordinating capacity, location, acoustic protection, and connections. MEP IfcCompressor MEP-GAS-REG Gas pressure regulator Clarifies the gas supply interface so pressure level, metering, safety distances, and pipe connections can be coordinated. MEP IfcFlowMeter MEP-FAN Fan Secures the required airflow by coordinating duty, duct connections, acoustic protection, and maintenance access. MEP IfcFan MEP-TANK Tank / separator Secures the required storage volume by coordinating location, structure, connections, and maintenance access. MEP IfcTank MEP-PUMP Pump Secures flow and pressure by coordinating duty, connections, location, and maintenance access. MEP IfcPump MEP-UNITARY Unitary equipment / monoblock Secures compact plant operation by coordinating footprint, service connections, and maintenance zones together. MEP IfcUnitaryEquipment MEP-COMMS Communications appliance Fixes communication device locations so coverage, connectivity, power supply, and finishes can be coordinated. MEP IfcCommunicationsAppliance MEP-COOL-BEAM Chilled ceiling / beam Secures room conditioning and coordinates output, water connections, condensation risk, and ceiling layout. MEP IfcCooledBeam MEP-SPACE-HEATER Radiator Secures room heat delivery by coordinating output, connections, placement, and clearances. MEP IfcSpaceHeater MEP-AIR-TERM Air terminal / grille Enables air-distribution verification and coordination with ceiling layout and occupied zones. MEP IfcAirTerminal MEP-AIR-BOX Air terminal box Enables demand-based airflow control and secures installation and maintenance space above the ceiling. MEP IfcAirTerminalBox MEP-LIGHT Light fixture Enables lighting verification and coordination of ceiling layout, power supply, and maintenance access. MEP IfcLightFixture MEP-OUTLET Socket / data outlet Fixes connection points so use, service routes, and finishes can be coordinated. MEP IfcOutlet MEP-SWITCH Switch Fixes control and switching points so electrical function, finishes, and user access can be coordinated. MEP IfcSwitchingDevice MEP-DAMPER Damper Fixes air isolation and control points so airflow, fire safety, and maintenance access can be coordinated. MEP IfcDamper MEP-SANITARY Sanitary terminal Fixes sanitary fixtures so use, water connections, drainage, and space requirements can be coordinated. MEP IfcSanitaryTerminal MEP-WASTE Waste terminal Fixes drainage points so falls, pipe routes, and sanitary fixtures can be coordinated. MEP IfcWasteTerminal MEP-GAS-TERM Gas outlet Fixes gas draw-off points so pipe routes, isolation, and appliance connections can be coordinated. MEP IfcFlowTerminal MEP-FIRE-TERM Fire suppression terminal Enables verification of fire-suppression coverage and coordination of the required clearances. MEP IfcFireSuppressionTerminal MEP-VALVE Valve / manifold Fixes isolation and control points to support operation, hydraulic balancing, and maintenance. MEP IfcValve MEP-ALARM Smoke detector / alarm Enables verification of fire detection coverage and coordinated placement with finishes and ceilings. MEP IfcAlarm MEP-SENSOR Sensor Fixes measurement points so controls, monitoring, and accessibility can be coordinated. MEP IfcSensor MEP-ACTUATOR Actuator Makes control functions coordinable so controls, power supply, and maintenance access are secured. MEP IfcActuator STR-EXCL-ZONE Exclusion zone Keeps required structural volumes clear and prevents costly clashes with architecture and building services. Structural engineering IfcBuildingElementProxy STR-OPENING-VOID Opening / recess (structural) Transfers approved voids into the structural model as binding information so that clashes are avoided and penetrations can be built as planned. Structural engineering IfcOpeningElement STR-BEAM Beam / girder detailed Enables reliable coordination of load transfer, penetrations, and connections through to execution. Structural engineering IfcBeam STR-COLUMN Column detailed Ensures coordinated load transfer and clash-free placement of adjacent components through to execution. Structural engineering IfcColumn STR-FOOTING Footing detailed Provides a reliable basis for coordinating load transfer, excavation, and utility lines. Structural engineering IfcFooting STR-WALL Wall detailed Enables reliable coordination of load transfer, openings, and connections through to execution. Structural engineering IfcWall STR-SLAB-FLOOR Floor slab detailed Enables reliable coordination of load transfer, openings, and cast-in items through to execution. Structural engineering IfcSlab STR-SLAB-BASE Base slab detailed Ensures coordinated planning of load transfer, waterproofing, and penetrations through to execution. Structural engineering IfcSlab STR-SLAB-ROOF Flat roof detailed Ensures coordinated planning of load transfer, falls, roof build-up, and penetrations. Structural engineering IfcSlab STR-STAIR Stair detailed Ensures early coordination of the structure, level transitions, and usable flight geometry. Structural engineering IfcStair STR-RAMP Ramp detailed Ensures early coordination of the structure, level transitions, and required gradient. Structural engineering IfcRamp STR-REBAR Reinforcement Provides unambiguous steel schedules and placing information to reduce execution errors. Structural engineering IfcReinforcingBar STR-EDGE-STRIP Edge strip Ensures formwork terminations can be specified, coordinated, and executed unambiguously. Structural engineering IfcBuildingElementProxy MEP-ESCAPE-SIGN Escape sign Makes exits and escape directions visible in the model so fire protection and electrical design can check marking, lighting type, and supply together. Fire protection IfcBuildingElementProxy

Contact

abstract ag

Imprint · Picassoplatz 4, 4052 Basel