Use case Quality assurance Schedule & coordination
Verify maintenance spaces
QAS-MAINT-SPACE
pragmaticBIM.ch/qas-maint-space
Maintain clear maintenance spaces in the model and prove them clash-free - before plant becomes unmaintainable.
Starting point
- Without reserved maintenance spaces, access and working areas for operation and upkeep are missing.
- Late conflicts with the building or MEP make maintenance costly or impossible.
Goal & benefit
- Maintain clear maintenance spaces as proxy volumes in the model.
- Check clashes against building and MEP in the federated model and document the verification.
Process
- Model clear maintenance spaces as proxy volumes.
- Regularly check maintenance spaces for clashes against building and building services in the federated model.
- Document the clash verification and keep approved volumes binding.
Deliverable
- Coordination model with the required location and size information for clear maintenance spaces.
Ways to do it
-
MagiCAD MagiCAD Group editorial listing
Building services design in Revit and AutoCAD with calculations and manufacturer product data.
Visit vendor · last checked
-
Navisworks Autodesk editorial listing
Federated model review with clash detection, 4D simulation and quantity takeoff.
Visit vendor · last checked
-
Solibri Office Solibri (Nemetschek) editorial listing
Rule-based checking of IFC models for clashes, model quality and requirements.
Visit vendor · last checked
Suggest a tool All tools and services
Elements involved
More use cases for Schedule & coordination
-
QAS-COORD-ZONE
Plan coordination zones
Define coordination zones in the model and assign them to meetings so that not every model has to be checked against every other model.
-
QAS-EARLY-COORD
Coordinate architecture and building services early
Align concept and feasibility early in the model - comparable to a sketch design, without execution detail.
-
QAS-MEP-DETAIL
Architecture - building services coordination in late design stages
Coordinate building services in construction-ready detail from the building-design phase onward so that clashes, connections, and spatial conditions can be checked before construction.