Goals
Every goal has levels. The higher the level, the more use cases are activated, and these decide which models and documents are delivered.
PG-01
Costs & quantities
The aim is not a particular figure but a cost forecast you can rely on. It starts with traceable quantities.
Low, Medium, High
PG-05
Schedule & coordination
The aim is not a particular date but a schedule that holds. Schedule certainty comes from coordinating in good time.
Low, Medium, High
PG-07
Decision certainty
The aim is to make strategic and design decisions early, comparably, and traceably. Structured use and massing foundations, option comparisons, visualizations, and documented approvals show the consequences of a decision while the project can still be changed.
Low, Medium, High
PG-09
Permit certainty
The aim is that the building permit application and official evidence pass without surprises. Requirements for parcels, traffic, parking, accessibility, fire protection, and existing trees are made visible in the model early and checked continuously, as is the evidence for funding.
Low, Medium, High
PG-10
Design certainty
The aim is a design that meets the client's needs, is internally consistent, and is ready for construction. Design reviews, evidence of fire, acoustic, and thermal protection, fall protection, and checked details make quality repeatably verifiable across all phases.
Low, Medium, High
PG-03
Verifiable sustainability
The aim is to check energy, material, and life-cycle targets directly against the current design status. Building simulation and life-cycle assessment need the same foundations as cost planning and design.
Low, Medium, High