ARC-UMBAU-PER pragmaticBIM.ch/arc-umbau-per

Makes planned and completed alterations spatially and chronologically traceable in the overall model.

Alteration area (ARC-UMBAU-PER)

Description

  • Volume defining the area covered by a separate alteration project.
  • Remains in the overall model as a historical record after completion - it is neither a space nor a building component.

Modelling guidelines

  • Model as a simplified proxy body matching the actual spatial extent of the alteration project.
  • Assign to the planning perimeter or affected storeys; ObjectType = Alteration area.
  • Name = project number; StartDate and EndDate = planned design period.
  • Keep one separate body with a stable GlobalId for each alteration project and retain it in the model after completion with AlterationStatus = COMPLETED.

IFC entity

IFC4
IfcBuildingElementProxy
IFC4.3
IfcBuildingElementProxy
IFC2x3
IfcBuildingElementProxy
Applicability rule
{'de': '(entity_ifc4=IfcBuildingElementProxy AND PredefinedType=USERDEFINED AND ObjectType=Umbauperimeter) OR (entity_ifc2x3=IfcBuildingElementProxy AND ObjectType=Umbauperimeter)', 'fr': '(entity_ifc4=IfcBuildingElementProxy AND PredefinedType=USERDEFINED AND ObjectType="Périmètre de transformation") OR (entity_ifc2x3=IfcBuildingElementProxy AND ObjectType="Périmètre de transformation")', 'it': '(entity_ifc4=IfcBuildingElementProxy AND PredefinedType=USERDEFINED AND ObjectType="Perimetro di trasformazione") OR (entity_ifc2x3=IfcBuildingElementProxy AND ObjectType="Perimetro di trasformazione")', 'en': '(entity_ifc4=IfcBuildingElementProxy AND PredefinedType=USERDEFINED AND ObjectType="Alteration area") OR (entity_ifc2x3=IfcBuildingElementProxy AND ObjectType="Alteration area")'}

Attributes

Name

Alteration project number.

PredefinedType

Marks the proxy as a user-defined type.

Allowed values

  • USERDEFINED - user-defined type; ObjectType specifies the kind
ObjectType

Kind of proxy element.

Allowed values

  • Alteration area - spatial boundary of an alteration project
StartDate ePset_AlterationArea

Planned start of the alteration project.

EndDate ePset_AlterationArea

Planned end of the alteration project.

AlterationStatus ePset_AlterationArea

Status of the alteration area.

Allowed values

  • PLANNED - planned
  • ACTIVE - active
  • COMPLETED - completed
  • CANCELLED - cancelled