Boundary condition Boundary conditions
Construction method & prefabrication
PG-11
pragmaticBIM.ch/pg-11
This framework condition determines whether the construction method remains open, is designed conventionally, or targets a high degree of prefabrication in timber, steel, or concrete. This choice determines when contractors must be involved, interfaces resolved, and shop, production, and assembly information provided.
Variants
-
BAW-01No requirements
No requirement for the construction method or degree of prefabrication; no additional construction-method-specific workflows are activated.
-
BAW-02Conventional
Conventional construction without specific requirements for industrial prefabrication; no additional prefabrication workflows are activated.
-
BAW-03High degree of prefabrication (timber, steel, precast concrete)
Engage contractors and production systems early, derive tendering and ordering foundations from the models, and verify shop, assembly, and intermediate states before fabrication.
Activates: Procure the timber contractor early, Provide the basis for steelwork tendering, Precast concrete parts ordering from model, Verify shop and installation design, Plan complex assemblies and intermediate states
Activated use cases
BES · Ordering
-
BES-TIMBER-CONTRACTORProcure the timber contractor early
The client procures a timber contractor after the study or preliminary design and involves it in the design, so that the construction is designed only once and to suit the contractor's production and assembly system.
-
BES-STEELWORK-TENDERProvide the basis for steelwork tendering
The client orders from the design team a steelwork component schedule with locations and principal dimensions from the model, so that the steelwork tender has verifiable quantities without paying twice for shop design.
DES · Design
-
DES-COMPLEX-ASSEMBLYPlan complex assemblies and intermediate states
Visualize and assess assembly options and temporary construction states with simplified models before they cause conflicts on site.
QAS · Quality assurance
-
QAS-CONTRACTOR-DESIGNVerify shop and installation design
Verify shop and installation design against the agreed design-relevant interfaces without remodelling the contractor's solution in detail in the architecture model.
CON · Construction
-
CON-PRECAST-ORDERPrecast concrete parts ordering from model
Provide precast concrete parts from the structural model for ordering and delivery planning.
More boundary conditions
-
PG-12
Security / critical infrastructure
This framework condition determines how strictly information and building security are handled for critical infrastructure: which CDEs are allowed and whether security-critical areas and building security measures must be managed and checked on a model basis.
-
PG-08
Procurement strategy
This framework condition determines the procurement route: engaging designers directly, a competition, design-build, or IPD. Each route places different demands on foundations, models, and bids.
-
PG-41
Construction during operation
This framework condition sets whether the building stays in use during construction. It drives phasing, temporary measures, decant space, and site logistics with separate routes for operation and construction.