Use case Ordering Costs & quantities
Provide the basis for the firestop tender
BES-FIRESTOP-TENDER
pragmaticBIM.ch/bes-firestop-tender
The client orders from the design team a checked firestop schedule with an unambiguous link to each opening, so that firestops are tendered with real quantities and types instead of as a percentage of construction cost.
Starting point
- Firestops are often allowed for in the cost estimate only as a percentage of construction cost; missing quantities and types regularly cause additional costs, especially on complex projects.
Goal & benefit
- Price firestops before award with real quantities and types and avoid additional costs.
- Track each firestop through its opening up to handover and detect missing firestops before components are closed.
Process
- Define the scope of fire-rated openings, the required information on fire resistance, firestop type, and sealed area, and the submission date, and order them from the architecture, structural, and MEP design teams.
- Request the firestop schedule and check against the fire protection concept and drawings that every fire-rated opening has a firestop and every firestop is assigned unambiguously to one opening.
- Approve the schedule and reuse it as the basis for the specification, offer comparison, and handover.
Deliverable
- Checked schedule derived from separate firestop components, each assigned unambiguously to an opening, as the basis for quantities and tendering.
Ways to do it
-
MagiCAD MagiCAD Group editorial listing
Building services design in Revit and AutoCAD with calculations and manufacturer product data.
Visit vendor · last checked
-
Solibri Office Solibri (Nemetschek) editorial listing
Rule-based checking of IFC models for clashes, model quality and requirements.
Visit vendor · last checked
-
Walraven BIM Library & Revit Plugin Walraven editorial listing
BIM library and Revit plugin for Walraven pipe supports, mounting rails and Pacifyre firestop systems.
Visit vendor · last checked
Suggest a tool All tools and services
Elements involved
Architecture (7)
Structural engineering (1)
More use cases for Costs & quantities
-
BES-CONCRETE-TENDER
Provide the basis for the concrete tender
The client orders from the structural design team a model with verifiable concrete quantities and the tender-relevant information on concrete grade, reinforcement, and surface, so that the specification for concrete and reinforced concrete works is based on the same quantities as the design.
-
BES-FLOORING-TENDER
Provide the basis for the flooring tender
The client orders from the architecture team a room-by-room flooring schedule with covering type, area, and perimeter from the model, so that quantities in the specification match the design and do not have to be determined again from drawings.
-
BES-ELEMENT-TENDER
Prepare the tender from component types and quantities
The client orders from the design team a trade-structured tender whose items trace back to component types and model quantities, so that offers can be compared with the cost calculation and post-calculation needs no new quantity take-off.