Laboratory and research
USE-LA
pragmaticBIM.ch/use-la
Experimental research and analysis. Reference quantity: number of lab workstations.
Boundary conditions
PG-29Laboratory type
Wet and dry labs differ in water and drainage connections, ventilation, and surfaces.
Variants
-
LBA-01Wet lab
Work with liquids and chemicals at sinks and fume hoods.
-
LBA-02Dry lab
Work at instruments, measuring stations, and computers.
PG-28Safety level
The biosafety level (BSL) and the number of lab workstations and fume hoods determine access, ventilation, pressure cascades, and wastewater.
Variants
-
BSL-01BSL 1
No or negligible risk.
-
BSL-02BSL 2
Low risk; biosafety cabinets and controlled access.
-
BSL-03BSL 3
Moderate risk; airlock, negative pressure, and filtered exhaust.
-
BSL-04BSL 4
High risk; fully contained laboratory area.
PG-42Fume hood density
Fume hood density determines extract airflow, shafts, and how deep the lab workstations are.
Variants
-
AZD-01none
No fume hood at the lab workstation.
-
AZD-02low
For example fewer than 0.5 fume hoods per lab workstation.
-
AZD-03high
At least 1 fume hood per lab workstation.
-
PG-15Refit frequency
How often spaces, equipment, and installations are refitted decides how current the as-built data must be in operation. The more often the building is refitted, the more facility management use cases are preselected.
Scenarios
US-LA-06Reaching the laboratory
Researchers, samples, and supplies reach the laboratory floors. The access arrangement determines access control, hazardous goods transport, and separation of people and material routes.
Variants
- Stairwell · Adds: Lobby, Stairwell
- Stairwell and elevator · Adds: Lobby, Stairwell, Elevator lobby
- Stairwell, elevator, and service lift · Adds: Lobby, Stairwell, Elevator lobby, Service lift
US-GE-01Reaching the unit (Described under another use)
US-LA-01Running experiments
Researchers carry out tests, measurements, and analyses. The laboratory type determines ventilation, media supply, and safety level.
Variants
- Chemistry or physics lab · Adds: Science laboratory
- Medical laboratory · Adds: Medical laboratory
- Clean-room laboratory · Adds: Airlock, Clean room
US-GE-03Disposing of waste (Described under another use)
US-LA-02Storing samples and supplies
Samples, reagents, and consumables are kept until use. Storage conditions determine temperature, access, and traceability.
Variants
- Laboratory store · Adds: Laboratory store
- Sample store with cold room · Adds: Sample storage, Cold storage
US-LA-03Handling hazardous substances
Chemicals and hazardous substances are delivered, stored, and disposed of. Separate stores determine fire compartments, ventilation, and routes through the building.
Variants
- Chemical store · Adds: Chemical store
- Hazardous materials store · Adds: Hazardous materials store
US-LA-07Changing in the laboratory
Staff put on protective clothing before entering the laboratory zone. The location determines contamination protection and routes in laboratory clothing.
Variants
- Central changing room · Adds: Lobby, Changing room
- Decentralised changing room · Adds: Changing room, Science laboratory
- Decentralised changing room with airlock · Adds: Changing room, Airlock
US-LA-05Evaluating results
Researchers analyse data and write reports outside the lab. Separate write-up spaces determine lab area, safety, and team exchange.
Variants
- Office · Adds: Office
- Shared office · Adds: Community office
US-LA-09Disposing of special waste
Researchers take hazardous laboratory waste away separately from other waste. The kind determines ventilation, shielding, and the route out of the building.
Variants · Several can be selected
- Chemical waste · Adds: Chemical waste room
- Biological waste · Adds: Biological waste room
- Radioactive waste · Adds: Radioactive waste room
US-LA-08Emergency power
Experiments, refrigerated samples, and fume cupboards have to keep running during a power cut. Emergency power determines whether a dedicated generator is needed, and with it the plant area and the fire compartment.
Variants
- Building emergency supply · Adds: Electrical room
- With backup generator · Adds: Generator room, Electrical room
Use cases
-
DES-MEP-SCHEMDevelop MEP schematics
Develop MEP system and riser schematics and formally approve them before construction.
-
DES-ARCH-MEP-COORDCoordinate architecture and building services
Coordinate MEP routes, equipment, and space requirements with architecture and update both discipline models consistently.
-
QAS-INSTALL-PATHVerify installation access paths
Carry the installation access paths to be kept clear in the model and prove that equipment can be brought in - before large plant or components force alterations and deconstruction.
More uses
-
USE-RZ
Data centre
Operation of IT infrastructure. Reference quantity: IT load (MW).
-
USE-VE
Passenger transport
Handling of travellers and their waiting time, for example in station halls, terminals and waiting areas. Reference quantity: passengers per peak hour.
-
USE-PK
Parking
Parking of vehicles, for example in multi-storey car parks, garages and parking spaces. Reference quantity: number of parking spaces.