Use case Design Verifiable sustainability

Determine the construction volume

DES-KV pragmaticBIM.ch/des-kv

Derive construction volume from gross volume, net spaces, and air spaces so material use can be compared already in early phases.

Starting point

  • Construction area is treated as an economic indicator, but it does not show thick slabs or deep floor build-ups.
  • A high-rise can look favourable by area and unfavourable by volume; the extra material stays invisible as long as only the area counts.

Goal & benefit

  • Compare material use as volume with similar projects as soon as gross volumes and net spaces are modelled in early phases.
  • The space volumes are enough; a component model or a parallel quantity take-off is not required.

Process

  1. Provide gross volumes, net spaces, and non-occupiable air spaces as set out in the modelling guideline.
  2. Evaluate construction volume as gross volume minus the volume of net spaces minus air spaces.
  3. Compare the indicator with similar projects; deviations caused by thick slabs become visible, which do not appear in the construction area.

Deliverable

  • Architecture model with gross volumes, net spaces, and air spaces
  • Evaluable construction volume for comparison with other projects

Ways to do it

  • Allplan Allplan (Nemetschek) editorial listing

    BIM authoring tool for architecture and civil engineering with formwork and reinforcement design.

    Visit vendor · last checked

  • Archicad Graphisoft (Nemetschek) editorial listing

    BIM authoring tool for architecture with drawings, schedules and IFC output from the model.

    Visit vendor · last checked

  • BauPlus Heiniger & Partner AG editorial listing

    Construction administration and AVA software for costs to BKP/eBKP, NPK tendering, award and measurement.

    Visit vendor · last checked

  • CostX RIB Software editorial listing

    Quantity take-off and cost estimating from 2D drawings and BIM models.

    Visit vendor · last checked

  • DESITE BIM thinkproject editorial listing

    Model checking and analysis with property-based colouring and quantity takeoff.

    Visit vendor · last checked

  • IFC-Lite LTplus AG editorial listing

    Open-source IFC toolkit for browser, server and CLI to view, query, validate, edit and export models.

    Visit vendor · last checked

  • iTWO 4.0 RIB Software editorial listing

    Model-based cost planning, tendering and project control (5D).

    Visit vendor · last checked

  • Messerli AVA Messerli Informatik editorial listing

    AVA software for tendering, contract award and billing based on NPK.

    Visit vendor · last checked

  • Messerli BauAD Messerli Informatik editorial listing

    CAD for building design with quantity take-off for handover to tendering (AVA).

    Visit vendor · last checked

  • Revit Autodesk editorial listing

    BIM authoring tool for architecture, structure and building services with drawings and quantities from the model.

    Visit vendor · last checked

  • Simplebim Datacubist editorial listing

    Editing, cleaning and enriching IFC models with rule-based templates.

    Visit vendor · last checked

  • Solibri Office Solibri (Nemetschek) editorial listing

    Rule-based checking of IFC models for clashes, model quality and requirements.

    Visit vendor · last checked

  • SORBA AVA SORBA editorial listing

    AVA software for tendering, contract award and billing based on NPK.

    Visit vendor · last checked

  • Vectorworks Architect Vectorworks (Nemetschek) editorial listing

    BIM and CAD authoring tool for architecture with drawings from the model.

    Visit vendor · last checked

  • werk-material.online CRB editorial listing

    Benchmarks from over 1000 completed Swiss buildings by eBKP-H, BKP and SIA 416, with project comparison.

    Visit vendor · last checked

Suggest a tool All tools and services

Elements involved

More use cases for Verifiable sustainability

Contact

abstract ag

Imprint · Picassoplatz 4, 4052 Basel