Fire cause-and-effect matrix
Fire cause-and-effect matrix for detectors, dampers, actuators, and suppression equipment. It ensures the safety matrix is formally approved before construction.
Contents
- Detectors, dampers, actuators, and suppression equipment
- Cause-effect or control logic in a fire case
- Assignment to plant and rooms
- Approval status readable
More documents of this discipline
-
NVG
Usage agreement MEP
MEP usage agreement. It links agreed room-by-room requirements for heating, ventilation, air conditioning, plumbing, and electrical to the technical design status.
-
STG
Riser schematics / shafts
Riser schematics and shafts for building services. They ensure vertical distribution and shafts are formally approved before construction.
-
SYS
System and plant schematics (MEP)
MEP system and plant schematics (heating, ventilation, air conditioning, plumbing, electrical). They ensure building-services concepts are formally approved before construction.