Use case Quality assurance Schedule & coordination
Coordinate architecture and building services
DES-ARCH-MEP-COORD
pragmaticBIM.ch/des-arch-mep-coord
Coordinate MEP routes, equipment, and space requirements with architecture and update both discipline models consistently.
Starting point
- As design progresses, MEP routes and equipment often clash with walls, ceilings, shafts, doors, or the intended use of rooms.
- If adjustments are recorded only in meetings or separate drawings, contradictory model states and missing openings in non-load-bearing components remain undiscovered until construction.
Goal & benefit
- Coordinate the location and space requirements of MEP routes and equipment with room geometry, fit-out, and accessibility.
- Resolve conflicts by relocating, adjusting, or consolidating MEP routes or by adapting the architecture.
- Maintain approved openings in non-load-bearing masonry, lightweight partitions, and other architecture-owned components as binding objects in the architecture model.
Process
- Provide architecture and MEP models at the agreed design state with the required space and accessibility requirements.
- Check the models for spatial conflicts and required openings, coordinate options across disciplines, and document decisions.
- Update approved adjustments in the responsible discipline models and check the updated state again in the federated model.
Deliverable
- Spatially coordinated architecture and MEP models with traceably resolved conflicts.
- Architecture model with approved openings in non-load-bearing, architecture-owned components.
Ways to do it
-
Allplan Bimplus Allplan (Nemetschek) editorial listing
Cloud-based OpenBIM platform (CDE) for model coordination, task management and site visualisation.
Visit vendor · last checked
-
BEXEL Manager BEXEL Consulting editorial listing
openBIM platform for clash detection, IDS checking, quantity takeoff, 4D/5D simulation and construction progress tracking.
Visit vendor · last checked
-
BIMcollab Nexus BIMcollab editorial listing
Cloud platform for BCF issues and coordination across multiple authoring and checking tools.
Visit vendor · last checked
-
BIMcollab Zoom BIMcollab editorial listing
IFC viewer and model checking with rules, colouring by properties and BCF issues.
Visit vendor · last checked
-
Catenda Hub Catenda AS editorial listing
OpenBIM CDE (formerly Bimsync) for federated IFC models, BCF issue management, document control and approvals.
Visit vendor · last checked
-
Dalux Box Dalux editorial listing
Common data environment with BIM viewer, document management and model coordination.
Visit vendor · last checked
-
IFC-Lite LTplus AG editorial listing
Open-source IFC toolkit for browser, server and CLI to view, query, validate, edit and export models.
Visit vendor · last checked
-
Navisworks Autodesk editorial listing
Federated model review with clash detection, 4D simulation and quantity takeoff.
Visit vendor · last checked
-
Revizto Revizto editorial listing
Coordination and issue platform for federated BIM models and drawings with clash detection.
Visit vendor · last checked
-
Solibri Office Solibri (Nemetschek) editorial listing
Rule-based checking of IFC models for clashes, model quality and requirements.
Visit vendor · last checked
-
Trimble Connect Trimble editorial listing
Cloud platform for sharing and coordinating models, drawings and tasks, with clash detection and BCF.
Visit vendor · last checked
Suggest a tool All tools and services
Elements involved
Architecture (6)
More use cases for Schedule & coordination
-
QAS-COORD-ZONE
Plan coordination zones
Define coordination zones in the model and assign them to meetings so that not every model has to be checked against every other model.
-
QAS-EARLY-COORD
Coordinate architecture and building services early
Align concept and feasibility early in the model - comparable to a sketch design, without execution detail.
-
QAS-MEP-DETAIL
Architecture - building services coordination in late design stages
Coordinate building services in construction-ready detail from the building-design phase onward so that clashes, connections, and spatial conditions can be checked before construction.