Plant space (schematic)
MEP-SCH-EQUIP
pragmaticBIM.ch/mep-sch-equip
Reserves sufficient plant-room space in the initial phase and prevents conflicts with other uses.
Description
- Coordination volume for plant rooms and similar installations - not a space object.
- Used for feasibility checking, not for execution planning.
Modelling guidelines
- Model as a simplified proxy body; dimensions according to the sketch concept including maintenance clearance.
- ObjectType = Plant space; assign to the matching storey.
- Do not model individual appliances or connection details.
IFC entity
- IFC4
- IfcBuildingElementProxy
- IFC4.3
- IfcBuildingElementProxy
- IFC2x3
- IfcBuildingElementProxy
- Applicability rule
- {'de': '(entity_ifc4=IfcBuildingElementProxy AND ObjectType=Erzeugerplatz) OR (entity_ifc2x3=IfcBuildingElementProxy AND ObjectType=Erzeugerplatz)', 'fr': '(entity_ifc4=IfcBuildingElementProxy AND ObjectType="Espace générateur") OR (entity_ifc2x3=IfcBuildingElementProxy AND ObjectType="Espace générateur")', 'it': '(entity_ifc4=IfcBuildingElementProxy AND ObjectType="Spazio generatore") OR (entity_ifc2x3=IfcBuildingElementProxy AND ObjectType="Spazio generatore")', 'en': '(entity_ifc4=IfcBuildingElementProxy AND ObjectType="Plant space") OR (entity_ifc2x3=IfcBuildingElementProxy AND ObjectType="Plant space")'}
Attributes
| Attribute | Definition | Used in |
|---|---|---|
| ObjectType |
Kind of proxy element. Allowed values
|
|
| PredefinedType |
Marks the proxy as a user-defined type. Allowed values
|
|
| Status Pset_BuildingElementProxyCommon |
Component status for coordinating work in existing buildings. Allowed values
|
|
| ElementStatus ePset_ElementStatus |
Component status for coordinating work in existing buildings. Allowed values
Note
|
Related elements
-
MEP-DOWNPIPE
Downpipe
Secures roof and balcony drainage by coordinating routes, connections, and slab penetrations.
-
MEP-CHILLER
Chiller
Secures cooling supply by coordinating capacity, plant footprint, and service connections early.
-
MEP-COOL-TOWER
Cooling tower / free cooler
Secures heat rejection by coordinating capacity, location, structure, acoustics, and water management.