Check site logistics across the construction phases
QAS-SITE-LOGISTICS
pragmaticBIM.ch/qas-site-logistics
Plan site logistics volumetrically and keep them current across phases - before ramps, slopes, and space needs surprise on site.
Starting point
- Site setup plans often show only one construction state and, on larger projects, must be revised repeatedly.
- 2D plans omit third-dimension constraints (ramps, slopes, clearances, crane reaches).
Goal & benefit
- Align logistics early as a discussion basis with authorities and contractors.
- Make space needs and conflicts visible in the model and keep them current across logistics phases.
Process
- Model a first logistics concept as proxy volumes (crane, fence, storage area, container, etc.).
- Align with authorities and contractors and refine the concept (including heights, ramps, and clearances).
- Keep logistics phases current in the model and document deviations.
Deliverable
- Model with site setup objects as proxy volumes and current phase state.
- Documented alignment as a discussion basis for authorities and contractors.
Ways to do it
-
DokaCAD for Revit Doka GmbH editorial listing
Revit plugin for automated 3D formwork planning with cycle planning, formwork drawings and bills of materials.
Visit vendor · last checked
-
Fuzor Kalloc Studios editorial listing
VR and 4D construction sequence simulation with live link to Revit and Archicad.
Visit vendor · last checked
-
Navisworks Autodesk editorial listing
Federated model review with clash detection, 4D simulation and quantity takeoff.
Visit vendor · last checked
-
SYNCHRO 4D Bentley Systems editorial listing
4D construction planning linking schedule and model for construction phases and logistics.
Visit vendor · last checked
Suggest a tool All tools and services
Elements involved
More use cases for Schedule & coordination
-
QAS-COORD-ZONE
Plan coordination zones
Define coordination zones in the model and assign them to meetings so that not every model has to be checked against every other model.
-
QAS-EARLY-COORD
Coordinate architecture and building services early
Align concept and feasibility early in the model - comparable to a sketch design, without execution detail.
-
QAS-MEP-DETAIL
Architecture - building services coordination in late design stages
Coordinate building services in construction-ready detail from the building-design phase onward so that clashes, connections, and spatial conditions can be checked before construction.