Costs & quantities
PG-01
pragmaticBIM.ch/pg-01
The aim is not a particular figure but a cost forecast you can rely on. It starts with traceable quantities.
Explanation
The check establishes whether areas and volumes can be determined robustly, components can be assigned to a cost structure, and procurement packages can be delineated unambiguously.
Levels
COST-01Low
Area verification according to SIA 416 and SIA D0165, floor area from the model, urban design mass study with gross volumes, and apartment schedule with gross and net areas.
COST-02Medium
Element-based cost calculation and plausibility checking from model quantities, automated eBKP-H classification, planned topsoil quantities, visualization of planning interfaces, and comparable competition evaluation.
COST-03High
Detailed element-based cost calculation, tendering with continuous component references, and post-calculation of unit rates, design-build procurement with a binding offer, model-based tender bases for concrete, masonry, flooring, tiling, painting, door, window, drywall, firestop and steelwork packages, visualization of award and cost interfaces (base building/tenant fit-out), and model-based final quantities for contractor accounts.
Contributing use cases
BES · Ordering
-
BES-ABSTRACTBIM-COMPEvaluate competition entries with a room model
Evaluate competition entries comparably with minimal modelling effort and focus detailed development on one aspect that is critical to the brief.
-
BES-DESIGN-BUILDProcure design-build services with a binding offer
Procure design and construction together on a functionally clarified basis and compare the proposed solution, scope, and offer price consistently.
-
BES-IPDProcure IPD services against a functional base reference and reference costs
Procure design and construction under an IPD model against a shared functional base reference and market-indexed reference costs, tie fees to that reference, and settle outperformance against it after project completion.
-
BES-CONCRETE-TENDERProvide the basis for the concrete tender
The client orders from the structural design team a model with verifiable concrete quantities and the tender-relevant information on concrete grade, reinforcement, and surface, so that the specification for concrete and reinforced concrete works is based on the same quantities as the design.
-
BES-MASONRY-TENDERProvide the basis for the masonry tender
The client orders from the architecture team a verifiable overview of masonry wall types and quantities, so that the masonry tender contains correct net areas and fire and acoustic requirements and variations are avoided.
-
BES-FLOORING-TENDERProvide the basis for the flooring tender
The client orders from the architecture team a room-by-room flooring schedule with covering type, area, and perimeter from the model, so that quantities in the specification match the design and do not have to be determined again from drawings.
-
BES-TILING-TENDERProvide the basis for the tiling tender
The client orders from the architecture team a room-by-room quantity overview of floor and wall tiling from the model, so that tendering and invoice checking rest on the same traceable quantity basis.
-
BES-PAINTING-TENDERProvide the basis for the painting tender
The client orders from the architecture team a room-by-room quantity overview of painting areas from the model, so that tendering and invoice checking rest on the same traceable quantity basis.
-
BES-DOOR-TENDERProvide the basis for the door tender
The client orders from the architecture team a verifiable door schedule from the model so that the door tender contains complete quantities and requirements and queries and variations are avoided.
-
BES-DRYWALL-TENDERProvide the basis for the drywall tender
The client orders from the architecture team a verifiable overview of types, quantities, and reinforcements for non-load-bearing interior walls, so that the drywall tender contains complete quantities and fire and acoustic requirements and variations during construction are avoided.
-
BES-WINDOW-TENDERProvide the basis for the window tender
The client orders from the architecture team a verifiable window schedule from the model so that the window tender contains complete quantities and requirements and queries and variations are avoided.
-
BES-FIRESTOP-TENDERProvide the basis for the firestop tender
The client orders from the design team a checked firestop schedule with an unambiguous link to each opening, so that firestops are tendered with real quantities and types instead of as a percentage of construction cost.
-
BES-STEELWORK-TENDERProvide the basis for steelwork tendering
The client orders from the design team a steelwork component schedule with locations and principal dimensions from the model, so that the steelwork tender has verifiable quantities without paying twice for shop design.
-
BES-ELEMENT-TENDERPrepare the tender from component types and quantities
The client orders from the design team a trade-structured tender whose items trace back to component types and model quantities, so that offers can be compared with the cost calculation and post-calculation needs no new quantity take-off.
DES · Design
-
DES-SIA416Verify areas to SIA 416
SIA 416 area verification from the space model - derive the area class from the standardized room use.
-
DES-D0165Verify areas to SIA D0165
Derive the SIA D0165 area verification from the space model so that area classes and uses can be evaluated and checked traceably.
-
DES-GFADetermine storey floor areas
Derive floor areas from the space model so that planning-law and economic metrics remain aligned with the design state.
-
DES-URBAN-MASSCreate the urban design mass study
Model and evaluate gross volumes by storey so that urban design options and metrics can be compared directly.
-
DES-APT-SCHEDULEPrepare apartment schedule
Derive the apartment schedule from gross volumes and net spaces and update it reliably when the design changes.
-
DES-ELEMENT-COST-EARLYCalculate element-based costs in early project phases
Combine component quantities and early unit rates into a traceable cost forecast while constructions and build-ups are not yet fully defined.
-
DES-EBKP-HCalculate the eBKP-H classification
Derive eBKP-H codes for major architecture and MEP positions from a few model properties - instead of classifying by hand.
-
DES-HUMUSDetermine topsoil quantities
Represent topsoil as a layer that can be designed, so that stripping, reinstatement, and surplus quantities can be evaluated for cost and construction sequencing.
-
DES-PLANNING-INTERFACEVisualize design interfaces
Carry design responsibility per component in the model and colour it - forgotten parts at design interfaces become visible.
-
DES-ELEMENT-COST-LATECalculate element-based costs in late project phases
Develop the early forecast into a detailed cost calculation using calculated component types, refined quantities, and type-specific unit rates.
QAS · Quality assurance
-
QAS-COST-PLAUSComponent cost plausibility check
Check the designer's unit prices against schema.pragmaticbim.ch and the cost database - by product class and type.
-
QAS-AWARD-INTERFACEVisualize award interfaces
Before each tender is sent out, check that every component is assigned to exactly one procurement package of the agreed breakdown - forgotten parts and overlaps at contractor interfaces become visible.
-
QAS-COST-INTERFACEVisualize cost interfaces between base building and tenant fit-out
Before tendering and after every contract change, check that the cost bearers in the model match the split between base building and tenant fit-out agreed in the lease.
-
QAS-ELEMENT-COST-POSTCALCPost-calculate component costs and feed unit rates back
After award and after the final account, check the unit rates of the cost calculation against award and actual costs per component type and keep the checked benchmarks for future projects.
CON · Construction
-
CON-FINAL-MEASUREMENTDetermine final quantities for contractor accounts from the model
Derive final quantities from the updated construction model so that contractors' final accounts can be checked and approved faster.
More project goals
-
PG-05
Schedule & coordination
The aim is not a particular date but a schedule that holds. Schedule certainty comes from coordinating in good time.
-
PG-07
Decision certainty
The aim is to make strategic and design decisions early, comparably, and traceably. Structured use and massing foundations, option comparisons, visualizations, and documented approvals show the consequences of a decision while the project can still be changed.
-
PG-09
Permit certainty
The aim is that the building permit application and official evidence pass without surprises. Requirements for parcels, traffic, parking, accessibility, fire protection, and existing trees are made visible in the model early and checked continuously, as is the evidence for funding.